Biennial Transmission Expansion Plan
ColumbiaGrid’s planning and expansion agreement calls for preparation of a biennial transmission plan based on the principle of single-utility planning.
Enter Project >>
Joint Requested Service Coordination
The Transmission Planning staff provides support for the OASIS program in developing and implementing common queueing on the ColumbiaGrid OASIS for requests made for transmission and interconnection service.
Enter Project >>
Northwest Area Coordinator (WECC basecase submittals)
ColumbiaGrid serves as the Northwest Area Coordinator. Sub Area Coordinators submit data to ColumbiaGrid. ColumbiaGrid then prepares the Northwest powerflow model to be included in WECC basecases.
Enter Project >>
Regional Planning Coordination
ColumbiaGrid participates in several formal and informal activities to ensure coordination of its transmission planning efforts with entities and groups both inside and outside of its planning footprint.
Enter Project >>
Projects Area Map
Area map of all on-going and future projects within the ColumbiaGrid System
Enter Project >>
Attachment K
Enter Project >>
Wind Integration Study Team
Joint Group with NTTG to facilitate the integration of Renewable Generation into the northwest transmission grid.
Enter Project >>
Order 1000 Regional
FERC Order 1000
Enter Project >>
Order 1000 Inter-regional
Enter Project >>
ColumbiaGrid Economic Planning Studies
Enter Project >>
Order 1000
FERC Order 1000 Regional and Inter-regional information
Enter Project >>
Critical Infrastructure Protection (CIP-014 Standard) - 3rd Party Review
Critical Infrastructure Protection (CIP-014 Standard) - 3rd Party Review
Enter Project >>
Transient Stability Studies
Enter Project >>
NERC MOD 33 Model validation
NERC MOD 33 (Power Flow and Dynamics) Model validation Study Team Overview
Enter Project >>
Quincy Area Study Team
Quincy Area Study Team
Enter Project >>
Order 1000 Activities Archive
Order 1000 Activities Archive
Enter Project >>
Node-Breaker Model Testing
Enter Project >>