...ssessment FINAL STUDY PLAN.pdf download>
Description: 2019 System Assessment FINAL STUDY PLAN
Type: Report
Status: FINAL
Contact
04/24/2019 2019 Biennial Transmission Expansion Plan (BTEP) (v: 2019 Biennial Transmission Expansion Plan (BTEP))
Final_2019_BTEP_v12.pdf download>
Description: 2019 Biennial Transmission Expansion Plan (BTEP)
Type: Report
Status: FINAL
Contact
03/21/2019 WPR Response 2_19_2019 Stakeholder Comments Final (v: WPR Response 2_19_2019 Stakeholder Comments Final)
...derComments_FINAL_03.18.19.pdf download>
Description: WPR Response 2_19_2019 Stakeholder Comments Final
Type: Comments
Status: FINAL
Contact
09/19/2018 2018 System Assessment Report (v: 2018 System Assessment Report )
...8 System Assessment Report.pdf download>
Description: 2018 System Assessment Report
Type: Report
Status: FINAL
Contact
04/27/2018 2018 System Assessment Final Study Plan (v: 2018 System Assessment Final Study Plan)
...ssessment Final Study Plan.pdf download>
Description: 2018 System Assessment Final Study Plan
Type: Report
Status: FINAL
Contact
03/20/2018 Draft Planning Agenda (4-12-18) (v: Draft Planning Agenda (4-12-18))
...PlanningAgenda(4-12-18)_v2.pdf download>
Description: Draft Planning Agenda (4-12-18)
Type: Agenda
Status: DRAFT
Contact
02/05/2021 Presentation: February 8, 2022 Planning Meeting (v: Presentation: February 8, 2022 Planning Meeting )
...tation_2018-02-08_Draft v1.pdf download>
Description: Presentation: February 8, 2022 Planning Meeting
Type: Presentation
Status: DRAFT
Contact
01/23/2018 Notice - 2018 Annual Interregional Coordination Meeting (v: Notice - Time Change - 2018 Annual Interregional Coordination Meeting)
...ional Coordination Meeting.pdf download>
Description: Notice - 2018 Annual Interregional Coordination Meeting
Type: Notice
Status: FINAL
Contact
11/16/2017 Draft Agenda, December 2017 Planning Meeting (v: Draft Agenda, December 2017 Planning Meeting )
...lanningAgenda(12-07-17)_v3.pdf download>
Description: Draft Agenda, December 2017 Planning Meeting
Type: Agenda
Status: FINAL
Contact
08/08/2021 Transient Stability August 2017 (v: Transient Stability August 2017)
request access > login >
Description: Transient Stability August 2017
Type: Presentation
Status: FINAL
Contact
08/08/2021 15 Year Assessment Introduction and Initial Scope (v: 15 Year Assessment Introduction and Initial Scope)
CG_Planning_15_Years.pdf download>
Description: 15 Year Assessment Introduction and Initial Scope
Type: Presentation
Status: FINAL
Contact
08/07/2021 GMD study and CEII Point of Contact Update (v: GMD study and CEII Point of Contact Update)
GMD_CIP-014_POC.pdf download>
Description: GMD study and CEII Point of Contact Update
Type: Presentation
Status: FINAL
Contact
08/07/2021 RAC/PCC/TEPPC/WPR Updates (v: RAC/PCC/TEPPC/WPR Updates)
CG_RAC_PCC_TEPPC_Updates.pdf download>
Description: RAC/PCC/TEPPC/WPR Updates
Type: Presentation
Status: FINAL
Contact
08/07/2021 MOD-033 Updates (v: MOD-033 Updates)
CG MOD 33 August 2017.pdf download>
Description: MOD-033 Updates
Type: Presentation
Status: FINAL
Contact
08/07/2021 ADS Implementation and Economic Planning Study (v: ADS Implementation and Economic Planning Study)
...Planning_EPS_2017_0810_v03.pdf download>
Description: ADS Implementation and Economic Planning Study
Type: Presentation
Status: FINAL
Contact
08/07/2021 2017 System Assessment and 2017 Sensitivity Study (v: 2017 System Assessment and 2017 Sensitivity Study)
CG_Planning_SA_SS_v2.pdf download>
Description: 2017 System Assessment and 2017 Sensitivity Study
Type: Presentation
Status: FINAL
Contact
08/04/2021 MEPPI speaker’s biography: Scott Ghiocel (v: MEPPI speaker’s biography: Scott Ghiocel)
Ghiocel Scott-Bio-20170802.pdf download>
Description: MEPPI speaker’s biography: Scott Ghiocel
Type: Document (pdf)
Status: FINAL
Contact
08/04/2021 MEPPI speaker’s biography: Charlie Vartanian (v: MEPPI speaker’s biography: Charlie Vartanian)
rtanian Charlie-Bio-WGSM-c.pdf download>
Description: MEPPI speaker’s biography: Charlie Vartanian
Type: Document (pdf)
Status: FINAL
Contact
08/04/2021 MEPPI Presentation: Loss of Synchronous Generation Impacts and Mitigation (v: MEPPI Presentation: Loss of Synchronous Generation Impacts and Mitigation)
...Impacts-CG-20170810-DRAFT1.pdf download>
Description: MEPPI Presentation: Loss of Synchronous Generation Impacts and Mitigation
Type: Presentation
Status: FINAL
Contact
08/04/2021 Draft Agenda - 8/10/2021 ColumbiaGrid Planning Meeting (v: Draft Agenda - 8/10/2021 ColumbiaGrid Planning Meeting)
...PlanningAgenda(8-10-17)_v3.pdf download>
Description: Draft Agenda - 8/10/2021 ColumbiaGrid Planning Meeting
Type: Agenda
Status: FINAL
Contact
07/28/2017 Workshop_Agenda(8-9-17) (v: Workshop_Agenda(8-9-17))
Workshop_Agenda(8-9-17).pdf download>
Description: Workshop_Agenda(8-9-17)
Type: Agenda
Status: FINAL
Contact
07/27/2017 June 8, 2021 Planning Meeting Notes (v: June 8, 2021 Planning Meeting Notes)
...ing Notes_08 June 2017 (3).pdf download>
Description: June 8, 2021 Planning Meeting Notes
Type: Notes
Status: FINAL
Contact
06/08/2021 System Assessment Sensitivity Updates (6.9.16) (v: 1)
...ensitivityUpdates_June2016.pdf download>
Description: CG Economic Planning Study Update (6.9.16)
Type: Presentation
Status: DRAFT
Contact
06/08/2021 CG Area Coordinator Update (6.9.16) (v: 1)
...CoordinatorUpdate_June2016.pdf download>
Description: CG Area Coordinator Update (6.9.16)
Type: Presentation
Status: DRAFT
Contact
06/07/2021 CG Economic Planning Study Update (6.9.16) (v: 1)
...Planning_EPS_2016_0609_v02.pdf download>
Description: CG_Planning_EPS_2016_0609_v02.ppt
Type: Presentation
Status: DRAFT
Contact
06/07/2021 Contingency Results 2016 System Assessment (5.31.16) (v: 1)
request access > login >
Description: Contingency Results_2016 System Assessment_5-31-16
Type: Spreadsheet
Status: DRAFT
Contact
06/02/2022 Draft Planning Agenda (6.9.16) (v: 1)
...PlanningAgenda(6-9-16)_v2.docx download>
Description: Draft Planning Agenda (6.9.16)
Type: Agenda
Status: DRAFT
Contact
04/20/2016 Draft Planning Agenda (4.21.06) (v: 2)
...lanningAgenda(4-21-16)_v2.docx download>
Description: Draft Planning Agenda (4.21.06)
Type: Agenda
Status: DRAFT
Contact
04/18/2016 Transient Stability Update (4.21.16) (v: 1)
...ransientStability(4.21.16).pdf download>
Description: Transient Stability Update (4.21.16)
Type: Presentation
Status: FINAL
Contact
04/14/2016 Area Coordinator Update (v: 1)
...oordinatorUpdate_April2016.pdf download>
Description: Area Coordinator Update
Type: Presentation
Status: FINAL
Contact
02/11/2021 Economic Planning Study Update Presentation (2.11.16) (v: 1)
EPSPresentation_2016_0211b.pdf download>
Description: Economic Planning Study Update Presentation (2.11.16)
Type: Presentation
Status: FINAL
Contact
02/02/2022 Draft Planning Agenda/Order 1000 Needs Meeting (2.11.16) (v: 1)
...lanningAgenda(2-11-15)_v1.docx download>
Description: Draft agenda Planning/Order 1000 Needs Meeting on 2/11/2021
Type: Agenda
Status: DRAFT
Contact
12/10/2021 WECC Base Case Building Process w/ColumbiaGrid as a Data Representative (v: 1)
...ildingProcesswColumbiaGrid.pdf download>
Description: WECC Base Case Building Process w/ColumbiaGrid as a Data Representative
Type: Report
Status: FINAL
Contact
12/03/2021 Economic Planning Study 2016 Dataset (v: 1)
...Presentation_2015_1203a-v2.pdf download>
Description: Economic Planning Study 2016 Dataset
Type: Presentation
Status: FINAL
Contact
12/01/2022 Draft - 2016 Biennial Plan Graphics & Tables (v: 1)
Attachments.pdf download>
Description: Draft - 2016 Biennial Plan Graphics & Tables
Type: Charts
Status: DRAFT
Contact
12/01/2022 2016 Biennial Plan Attachment B (DRAFT) (v: 1)
2016 BP AttB_12-1-15.xlsx download>
Description: 2016 Biennial Plan Attachment B (DRAFT)
Type: Spreadsheet
Status: DRAFT
Contact
12/01/2022 Draft 2016 Biennial Plan Report (v: 1)
016BiennialPlanText_Draft.docx download>
Description: Draft 2016 Biennial Plan Report
Type:
Status: DRAFT
Contact
12/01/2022 Planning Meeting Minutes from Oct. 22, 2015 (v: 1)
...MeetingMinutes_22 Oct 2015.pdf download>
Description: Planning Meeting Minutes from Oct. 22, 2015
Type: Minutes
Status: FINAL
Contact
12/01/2022 Planning Meeting Update (12.3.15) - Paul (v: 1)
..._Planning_Meeting_12_03_v2.pdf download>
Description: Planning Meeting Update (12.3.15) - Paul
Type: Presentation
Status: FINAL
Contact
12/01/2022 Transient Stability Update (12.3.15) (v: 1)
...ntStabilityudpatesDecember.pdf download>
Description: Transient Stability Update (12.3.15)
Type: Presentation
Status: FINAL
Contact
12/01/2022 Biennial Plan Update (12.03.15) (v: 1)
BiennialPlanUpdate_Dec2015.pdf download>
Description: Biennial Plan Update (12.03.15)
Type: Presentation
Status: FINAL
Contact
12/01/2022 Area Coordinator Update (12.3.15) (v: 1)
...aCoordinatorUpdate_Dec2015.pdf download>
Description: Area Coordinator Update (12.3.15)
Type: Presentation
Status: FINAL
Contact
12/01/2022 2016 System Assessment Base Case Assumptions (v: 1)
...sment_BasecaseAssumptions_.pdf download>
Description: 2016 System Assessment Base Case Assumptions
Type: Presentation
Status: FINAL
Contact
11/13/2015 Draft Planning Agenda (12.03.15) (v: 1)
...anningAgenda(12-03-15)_v5.docx download>
Description: Draft Planning Agenda (12-03-15)
Type: Agenda
Status: DRAFT
Contact
10/22/2015 Transient Stability Presentation (v: 1)
request access > login >
Description: Transient Stability Presentation
Type: Presentation
Status: FINAL
Contact
10/22/2015 Proposed CCTA Transmission Project List from TEPPC (v: 1)
...est-Form-CaliforniaISO_CG.xlsx download>
Description: Proposed CCTA Transmission Project List from TEPPC
Type: Spreadsheet
Status: FINAL
Contact
10/22/2015 Economic Planning Study Refresh 2017 (v: 1)
PS-Presentation_2015_1022a.pdf download>
Description: Economic Planning Study Refresh 2017
Type: Presentation
Status: FINAL
Contact
10/20/2015 Planning Updates (10.22.15) (v: 1)
...ate_Planning_Meeting_10_22.pdf download>
Description: Planning Updates (10.22.15)
Type: Presentation
Status: FINAL
Contact
10/19/2015 Dynamic Options (aux file) (v: 1)
dynamic_options.aux download>
Description: Dynamic Options (aux file)
Type: PowerWorld Auxiliary File
Status: DRAFT
Contact
10/19/2015 Contingency Results EHW (spreadsheet) (v: 1)
...tingency Results_EHW_Sens.xlsx download>
Description: Contingency Results EHW (spreadsheet)
Type: Spreadsheet
Status: DRAFT
Contact
10/19/2015 Area Coordinator Update (10.22.15) (v: 1)
...CoordinatorUpdate_10-22-15.pdf download>
Description: Area Coordinator Update (10.22.15)
Type: Presentation
Status: FINAL
Contact
10/19/2015 System Assessment Sensitivity Updates (10.22.15) (v: 1)
...ensitivityUpdates_10-22-15.pdf download>
Description: System Assessment Sensitivity Updates (10.22.15)
Type: Presentation
Status: FINAL
Contact
10/19/2015 August 20, 2021 Planning Meeting Notes (v: 1)
...Meeting_20 Aug 2015minutes.pdf download>
Description: August 20, 2021 Planning Meeting Notes
Type: Minutes
Status: FINAL
Contact
10/13/2015 Draft Planning Agenda (10.22.15) (v: 1)
...anningAgenda(10-22-15)_v2.docx download>
Description: Draft Planning Agenda (10.22.15)
Type: Agenda
Status: DRAFT
Contact
08/20/2015 Economic Planning Updates (v: 1)
...ing_Meeting_EPS (08.20.15).pdf download>
Description: Economic Planning Updates
Type: Presentation
Status: FINAL
Contact
08/20/2015 Order 1000 Updates (v: 1)
O1K_Updates.pdf download>
Description: Order 1000 Updates
Type: Presentation
Status: FINAL
Contact
08/19/2015 Presentation: Technology Discussion (v: 1)
...logyDiscussionPresentation.pdf download>
Description: Presentation: Technology Discussion
Type: Presentation
Status: FINAL
08/18/2015 Area Coordinator Update (v: 1)
AreaCoordinatorUpdate.pdf download>
Description: Area Coordinator Update
Type:
Status: FINAL
Contact
08/18/2015 System Assessment Sensitivity Updates (v: 1)
...sessmentSensitivityUpdates.pdf download>
Description: System Assessment Sensitivity Updates
Type: Presentation
Status: FINAL
Contact
08/18/2015 2015 System Assessment Updates (v: 1)
2015_SA_Updates.pdf download>
Description: 2015 System Assessment Updates
Type: Presentation
Status: FINAL
Contact
08/18/2015 Introduction to Planning Process (v: 1)
...roduction_planning_Process.pdf download>
Description: Introduction to Planning Process
Type: Presentation
Status: FINAL
Contact
08/18/2015 ColumbiaGrid Transient Stability Updates (v: 1)
GTransientStabilityudpates.pdf download>
Description: ColumbiaGrid Transient Stability Updates
Type: Presentation
Status: FINAL
Contact
08/17/2015 June 4, 2021 Planning Meeting Notes (v: 1)
...e04PlanningMeetingNotes_v2.pdf download>
Description: June 4, 2021 Planning Meeting Notes
Type: Minutes
Status: FINAL
Contact
08/12/2021 Draft Planning Agenda (8.20.15) (v: 1)
...ftPlanningAgenda(8-20-15).docx download>
Description: Draft Planning Agenda (8.20.15)
Type: Agenda
Status: DRAFT
Contact
06/04/2021 Contingency Results 5.21.15 (v: 1)
request access > login >
Description: Contingency Results 5.21.15
Type: Spreadsheet
Status: FINAL
Contact
06/04/2021 GIC Modeling Data for WECC 4.29.15 (v: 1)
request access > login >
Description: GIC Modeling Data for WECC 4.29.15
Type: Spreadsheet
Status: FINAL
Contact
06/04/2021 2015 Delta Voltage Results Xfmr And CapOn (v: 1)
request access > login >
Description: 2015 Delta Voltage Results Xfmr And CapOn
Type: Spreadsheet
Status: FINAL
Contact
06/04/2021 System Assessment Cases (Zipped file - 26mb) (v: 1)
request access > login >
Description: System Assessment Cases (Zipped file - 26mb)
Type: Spreadsheet
Status: FINAL
Contact
06/03/2022 April 30th Planning Meeting Notes (v: 1)
....30.2015PlanningMeeting_v2.pdf download>
Description: April 30th Planning Meeting Notes
Type: Minutes
Status: FINAL
Contact
06/02/2022 Economic Planning - Planning Meeting (6.4.15) (v: 1)
...ning_Meeting_EPS(06.04.15).pdf download>
Description: Economic Planning - Planning Meeting (6.4.15)
Type: Presentation
Status: FINAL
Contact
06/02/2022 Unsolved Cases (v: 1)
UnsolvedCases.pdf download>
Description: Unsolved Cases
Type: Spreadsheet
Status: FINAL
Contact
06/02/2022 Planning Process Updates (v: 1)
...ting06_04_planning_Process.pdf download>
Description: Planning Process Updates
Type: Presentation
Status: FINAL
Contact
06/02/2022 Draft Planning Agenda (6.4.15) (v: 1)
...PlanningAgenda(6-4-15)_v1.docx download>
Description: Draft Planning Agenda (6.4.15)
Type: Agenda
Status: DRAFT
Contact
04/29/2015 Planning Meeting - EPS Presentation (4.30.15) Kevin (v: 1)
...eeting_EPS (04 30 15)Kevin.pdf download>
Description: Planning Meeting - EPS Presentation (4.30.15) Kevin
Type: Presentation
Status: FINAL
Contact
04/28/2015 CG CEII Request Presentation (Bo) (v: 1)
CG-CEIIrequest(Bo).pdf download>
Description: CG CEII Request Presentation (Bo)
Type: Presentation
Status: FINAL
Contact
04/28/2015 CG Planning Presentation (Paul) (v: 1)
...g4-30-15_Planning_v1(Paul).pdf download>
Description: CG Planning Presentation (Paul)
Type: Presentation
Status: FINAL
Contact
04/22/2015 Draft Planning Agenda (4.30.15) (v: 2)
...lanningAgenda(4-30-15)_v5.docx download>
Description: Draft Planning Agenda (4.30.15)
Type: Agenda
Status: DRAFT
Contact
04/06/2021 ColumbiaGrid 2015 System Assessment Study Plan (v: 1)
...stemAssessmentStudyPlan_v4.pdf download>
Description: ColumbiaGrid 2015 System Assessment Study Plan
Type: Report
Status: DRAFT
Contact
03/26/2015 Stakeholder Comments: February 26, 2022 Inter-regional Meeting (v: 1)
...tSummaryForm03.23.15_FINAL.pdf download>
Description: Stakeholder Comments: February 26, 2022 Inter-regional Meeting
Type: Comments
Status: FINAL
03/17/2015 Planning Meeting 3.12.15 Meeting Notes (v: 1)
...anning MeetingMeetingNotes.pdf download>
Description: Planning Meeting 3.12.15 Meeting Notes
Type: Notes
Status: FINAL
Contact
03/12/2021 Planning Meeting - Economic Planning Study Team Presentation (3.12.15) (v: 1)
...ning_Meeting_EPS(03.12.15).pdf download>
Description: Planning Meeting - Economic Planning Study Team Presentation (3.12.15)
Type: Presentation
Status: FINAL
Contact
03/11/2021 Planning Meeting Notes (2.5.15) (v: 1)
052015PlanningMeetingNotes.pdf download>
Description: Planning Meeting Notes (2.5.15)
Type: Notes
Status: FINAL
Contact
03/11/2021 Peak RC CIP014 Guidance Presentation (3.12.15) (v: 1)
...C_CIP014Guidance_10Mar2015.pdf download>
Description: Peak RC CIP014 Guidance Presentation (3.12.15)
Type: Presentation
Status: FINAL
Contact
03/11/2021 Planning Meeting - Sensitivity (3.12.15) (v: 1)
... Meeting 03_12_sensitivity.pdf download>
Description: Planning Meeting - Sensitivity (3.12.15)
Type: Presentation
Status: FINAL
Contact
03/11/2021 Planning Meeting - Planning Process (3.12.15) (v: 1)
...03_12_planning_Process (3).pdf download>
Description: Planning Meeting - Planning Process (3.12.15)
Type: Presentation
Status: FINAL
Contact
03/11/2021 Draft Planning Agenda (3.12.15) (v: 2)
...lanningAgenda(3-12-15)_v3.docx download>
Description: Draft Planning Agenda (3.12.15)
Type: Agenda
Status: DRAFT
Contact
02/23/2015 Final 2015 Biennial Transmission Expansion Plan (10MB) (v: 3)
2015BPFinalweb.pdf download>
Description: 2015 Biennial Transmission Expansion Plan Report
Type: Report
Status: FINAL
Contact
02/05/2021 Draft 2015 system Assessment Study Plan - Appendix (v: 2)
...sessment_StudyPlanDetails.xlsx download>
Description: Draft 2015 system Assessment Study Plan - Appendix
Type: Document (pdf)
Status: DRAFT
Contact
02/03/2022 Update on NERC & WECC Standards (v: 1)
Planning Meeting 02_05_LF2.pdf download>
Description: Update on NERC & WECC Standards
Type: Presentation
Status: FINAL
Contact
02/03/2022 Economic Planning Study Presentation (v: 1)
...PS Presentation_2015_0205a.pdf download>
Description: Economic Planning Study Presentation
Type: Presentation
Status: FINAL
Contact
02/03/2022 Draft 2015 System Assessment Study Plan (v: 1)
...ssment Study Plan_v1_Clean.pdf download>
Description: Draft 2015 System Assessment Study Plan
Type: Document (pdf)
Status: FINAL
Contact
02/03/2022 Order 1000 Potential Needs & Overview of Planning Process (v: 1)
4_Planning Meeting 02_05.pdf download>
Description: Order 1000 Potential Needs & Overview of Planning Process
Type: Presentation
Status: FINAL
02/03/2022 Order 1000 Potential Need Suggestion Form (v: 1)
_Order1000 Need suggestion.pdf download>
Description: Order 1000 Potential Need Suggestion Form
Type: Document (pdf)
Status: DRAFT
Contact
02/03/2022 Decisions & Action Items from Dec 4th Meeting (v: 1)
...042014PlanningMeetingNotes.pdf download>
Description: Planning Meeting Notes
Type: Notes
Status: DRAFT
Contact
02/03/2022 PNW DispGen W150106a (v: 1)
PNW_DispGen_W150106a.xlsx download>
Description: PNW DispGen W150106a;
Type: Spreadsheet
Status: DRAFT
Contact
02/03/2022 Losses by Area W150106a (v: 1)
Losses_by_Area_W150106a.xlsx download>
Description: Losses by Area W150106a
Type: Spreadsheet
Status: DRAFT
Contact
02/03/2022 LMP Charts B0-B3 W150106a (34MB file size) (v: 1)
LMP_Charts_B0-B3_W150106a.xlsx download>
Description: LMP Charts B0-B3 W150106a (34MB file size)
Type: Spreadsheet
Status: DRAFT
Contact
02/03/2022 Interface Flow Forecast B3-S3w W150106a (68MB file size) (v: 1)
..._Forecast_B3-S3w_W150106a.xlsx download>
Description: Interface Flow Forecast B3-S3w W150106a (68MB file size)
Type: Spreadsheet
Status: DRAFT
Contact
02/03/2022 Interface Flow Forecast B2-S2w W150106a (70MB file size (v: 1)
..._Forecast_B2-S2w_W150106a.xlsx download>
Description: Interface Flow Forecast B2-S2w W150106a (70MB file size
Type: Spreadsheet
Status: DRAFT
Contact
02/03/2022 Interface Flow Forecast B1-S1 W150106a (68MB file size) (v: 1)
...w_Forecast_B1-S1_W150106a.xlsx download>
Description: Interface Flow Forecast B1-S1 W150106a (68MB file size)
Type: Spreadsheet
Status: DRAFT
Contact
02/03/2022 Interface Flow Forecast B1 wo/Centralia CC W150106a (70MB file size) (v: 1)
...B1_woCentraliaCC_W150106a.xlsx download>
Description: Interface Flow Forecast B1 wo/Centralia CC W150106a
Type: Spreadsheet
Status: DRAFT
Contact
02/03/2022 Interface Flow Forecast BO-B3 W150106a (70MB file size) (v: 1)
...w_Forecast_B0-B3_W150106a.xlsx download>
Description: Interface Flow Forecast BO-B3 W150106a
Type: Spreadsheet
Status: DRAFT
Contact
02/03/2022 Interface Flow Backcast W141219a (65mb file size) (v: 1)
...ce_Flow_Backcast_W141219a.xlsx download>
Description: Interface Flow Backcast W141219a
Type: Spreadsheet
Status: DRAFT
Contact
02/03/2022 EPS Presentation (2.3.15) (v: 1)
S Presentation_2015_0203a.pptx download>
Description: EPS Presentation (2.3.15)
Type: Presentation
Status: DRAFT
Contact
02/03/2022 ENS W150106a (v: 1)
ENS_W150106a.xlsx download>
Description: ENS W150106a
Type: Spreadsheet
Status: DRAFT
Contact
01/21/2015 Draft Planning Agenda (2.5.15) (v: 1)
aftPlanningAgenda(2-5-15).docx download>
Description: Draft Planning Agenda (2.5.15)
Type: Agenda
Status: DRAFT
Contact
12/10/2021 Compare Monthly/Hourly Load Weighted LMP Price ($/MW) (v: 1)
W141119c_LMP.xlsx download>
Description: Compare Monthly/Hourly Load Weighted LMP Price ($/MW)
Type: Spreadsheet
Status: FINAL
Contact
12/10/2021 Working Modeling Notes/Assumptions (v: 1)
...es_Assumptions_2014_1119c.xlsx download>
Description: Working Modeling Notes/Assumptions
Type: Spreadsheet
Status: FINAL
Contact
12/10/2021 Compare Generation by Area and Generic Type (v: 1)
...en_by_Area_by_GType_1119c.xlsx download>
Description: Compare Generation by Area and Generic Type
Type: Spreadsheet
Status: FINAL
Contact
12/10/2021 Interface Forecast Comparison (65mb) (v: 1)
..._Interface_Flow_Forecast1.xlsx download>
Description: W141119c Interface Flow Forecast
Type: Spreadsheet
Status: FINAL
Contact
12/04/2021 Figure E-1 Slide (v: 1)
E1(2).pdf download>
Description: Figure E-1 Slide
Type: Presentation
Status: FINAL
Contact
12/04/2021 EPS Presentation (12.4.14) (v: 1)
EPS_Presentation(12.4.14).pdf download>
Description: EPS Presentation (12.4.14)
Type: Presentation
Status: FINAL
Contact
12/03/2021 2015 System Assessment Base Cases Slide (v: 1)
...5SystemAssessmentBaseCases.pdf download>
Description: 2015 System Assessment Base Cases Slide
Type: Presentation
Status: FINAL
Contact
12/03/2021 Outage Results Analysis (26mb zip file) (v: 1)
request access > login >
Description: Outage Results Analysis
Type: PowerWorld Auxiliary File
Status: FINAL
Contact
12/02/2022 2014 System Assessment Results Zone Gen Results (v: 1)
request access > login >
Description: 2014 System Assessment Results Zone Gen Results
Type: Spreadsheet
Status: DRAFT
Contact
12/02/2022 System Assessment Contingency Methodology Draft (v: 1)
...ngencyMethodology_Draft_r1.pdf download>
Description: System Assessment Contingency Methodology Draft;
Type: Document (pdf)
Status: DRAFT
Contact
12/02/2022 System Assessment Data Preparation Contingency Processing (v: 1)
...ationContingencyProcessing.pdf download>
Description: System Assessment Data Preparation Contingency Processing
Type: Document (pdf)
Status: DRAFT
Contact
11/05/2021 TPL Draft Agenda (11.6.14) (v: 1)
...ting_11_6_Agenda_Draft_v1.docx download>
Description: TPL Draft Agenda (11.6.14)
Type: Agenda
Status: DRAFT
Contact
11/05/2021 CG System Assessment Data Preparation Contingency Processing Process Draft (v: 1)
...cyProcessingProcess_Draft.docx download>
Description: CG System Assessment Data Preparation Contingency Processing Process Draft
Type: Report
Status: DRAFT
Contact
11/05/2021 Transmission System Planning Performance WECC Regional Criterion TPL-001-WECC-CRT-3 (v: 1)
...-CRT-3 - Posting 1 - Clean.doc download>
Description: Transmission System Planning Performance WECC Regional Criterion TPL-001-WECC-CRT-3
Type: Report
Status: DRAFT
11/05/2021 CG System Assessment Contingency Methodology Draft (v: 1)
...tingencyMethodology_Draft.docx download>
Description: CG System Assessment Contingency Methodology Draft
Type: Report
Status: DRAFT
Contact
10/27/2014 Central Ferry - LoMo Draft Agenda (10.28.14) (v: 1)
...rry-Lomo_Agenda(10-28-14).docx download>
Description: Central Ferry - LoMo Draft Agenda (10.28.14)
Type: Agenda
Status: DRAFT
Contact
10/23/2014 Draft Planning Agenda (12.4.14) (v: 1)
...ftPlanningAgenda(12-4-14).docx download>
Description: Draft Planning Agenda (12.4.14)
Type: Agenda
Status: DRAFT
Contact
10/16/2014 WOMR Phase 2 PRG 10.17.14 (v: 1)
request access > login >
Description: WOMR Phase 2 PRG 10.17.14
Type: Presentation
Status: FINAL
10/16/2014 CG Planning Meeting IROL 10.16.14 (DRAFT) (v: 1)
CG-PlgMtgIROL10-16-14.pdf download>
Description: CG Planning Meeting IROL 10.16.14
Type: Presentation
Status: DRAFT
Contact
10/16/2014 Action Items (from 9.16.14) (v: 1)
9_16_14_Action_Items.pdf download>
Description: Action Items (from 9.16.14)
Type: Minutes
Status: FINAL
Contact
10/16/2014 CG Planning Meeting Presentation (Paul D.) (v: 1)
Planning Meeting 10_16 (2).pdf download>
Description: CG Planning Meeting 10.16.14
Type: Presentation
Status: FINAL
Contact
10/15/2014 EPS Presentation 10.15.14 (v: 1)
EPS_2014_1015.pptx download>
Description: EPS Presentation 10.15.14
Type: Presentation
Status: FINAL
Contact
10/15/2014 CIP 014 Reviewer Role (v: 1)
CIP014ReviewerRole.docx download>
Description: CIP 014 Reviewer Role
Type: Report
Status: DRAFT
Contact
10/15/2014 W141014c2 Interface Flow Spreadsheet (63.5MB) (v: 1)
...c2_Interface_Flow_wGV9_v5.xlsx download>
Description: EPS Spreadsheet (63.5MB)
Type: Spreadsheet
Status: DRAFT
Contact
10/13/2014 Project WECC-0100 Update (v: 1)
RC.Oct.14.PCC.WECC.pdf download>
Description: Project WECC-0100 Update
Type: Presentation
Status: FINAL
10/13/2014 2014 System Assessment Results Zone Gen Results 10.9.14 (v: 1)
...ts_ZoneGenResults_10-9-14.xlsx download>
Description: 2014 System Assessment Results Zone Gen Results 10.9.14
Type: Spreadsheet
Status: FINAL
Contact
10/13/2014 Draft Planning Agenda (10.16.14) (v: 1)
...tPlanningAgenda(10-16-14).docx download>
Description: Draft Planning Agenda (10.16.14)
Type: Agenda
Status: DRAFT
Contact
09/25/2014 2014 System Assessment Results/BPA (CEII Protected) (v: 1)
request access > login >
Description: 2014 System Assessment Results/BPA (CEII Protected)
Type: Presentation
Status: FINAL
09/23/2014 NW WA Area Net Load NOPSG Presentation (v: 1)
request access > login >
Description: NW WA Area Net Load NOPSG Presentation
Type: Presentation
Status: FINAL
09/17/2014 CIP 014 Review Role (v: 1)
CIP014ReviewerRole.pdf download>
Description: CIP 014 Review Role
Type: Report
Status: DRAFT
Contact
09/15/2014 Planning Meeting Presentation (Paul) (v: 1)
PlanningMeeting09_16.pdf download>
Description: Planning Meeting Presentation (Paul)
Type: Presentation
Status: FINAL
Contact
09/15/2014 2015 System Assessment Contingency-RAS Files (v: 1)
...essment_Contingey-RASFiles.pdf download>
Description: 2015 System Assessment Contingency-RAS Files
Type: Presentation
Status: FINAL
Contact
09/15/2014 2014 Sensitivity Update Max Gen During Light Load (v: 1)
...date_MaxGenDuringLightLoad.pdf download>
Description: 2014 Sensitivity Update Max Gen During Light Load
Type: Presentation
Status: FINAL
Contact
09/15/2014 Draft Planning Agenda (9.16.14) (v: 1)
...l_9__Agenda_Draft_v2_clean.pdf download>
Description: Draft Planning Agenda (9.16.14)
Type: Agenda
Status: DRAFT
Contact
09/11/2021 Economic Planning Study Presentation (9.11.14) (v: 1)
...StudyPresentation(9.11.14).pdf download>
Description: Economic Planning Study Presentation (9.11.14)
Type:
Status: FINAL
Contact
09/10/2021 PEFA Screening Guidelines 6.4.14 (v: 1)
...omments060414ver7Clean (1).pdf download>
Description: PEFA Screening Guidelines 6.4.14
Type: Report
Status: DRAFT
Contact
09/10/2021 Post Contingency Voltage Angle Difference (v: 1)
...ltageAngleDifference_7_30.docx download>
Description: Post Contingency Voltage Angle Difference
Type: Report
Status: DRAFT
Contact
08/21/2014 EPS Meeting Presentation 8.21.14 (v: 1)
EPS-Meeting2014_0820.pdf download>
Description: EPS Meeting Presentation 8.21.14
Type: Presentation
Status: FINAL
Contact
08/06/2021 Central Ferry - LoMo Agenda 8.6.14 (v: 1)
CF-LM PCP Agenda_080614.pdf download>
Description: Central Ferry - LoMo Agenda 8.6.14
Type: Agenda
Status: DRAFT
Contact
08/06/2021 Central Ferry - LoMo Project Presentation (v: 1)
...roject_Coord_Process_Mtg-1.pdf download>
Description: Central Ferry - LoMo Project Presentation
Type: Presentation
Status: DRAFT
Contact
07/07/2021 EPS Presentation (Kevin Harris)7.7.14 (v: 1)
EPS_07_07_PD.pdf download>
Description: EPS Presentation (Kevin Harris)
Type: Presentation
Status: FINAL
Contact
07/03/2022 2014 System Assessment (v: 1)
2014SAweb.pdf download>
Description: 2014 System Assessment
Type: Report
Status: FINAL
06/05/2021 2013 Cluster Study Final CG Presentation (BPA) (v: 1)
...CG-Presentation5_June_2014.pdf download>
Description: 2013 Cluster Study Final CG Presentation (BPA)
Type: Presentation
Status: FINAL
06/05/2021 20140506 ColumbiaGrid Assignment CG Comments (PEFA) (v: 1)
...tCGcomments060414ver7Clean.pdf download>
Description: 20140506 ColumbiaGrid Assignment CG Comments (PEFA)
Type: Functional Agreement
Status: DRAFT
Contact
06/04/2021 Area Coordinator Changes due to MOD B (v: 1)
MOD32Slides(2).pdf download>
Description: Area Coordinator Changes due to MOD B
Type: Presentation
Status: DRAFT
Contact
06/04/2021 System Assessment 2014 Presentation (v: 1)
System_Assessment_2014_v4.pdf download>
Description: System Assessment 2014 Presentation
Type: Presentation
Status: DRAFT
Contact
06/03/2022 Draft Planning Agenda (6.5.14) (v: 1)
...nnial_6_5_Agenda_Draft_v1.docx download>
Description: Draft Planning Agenda (6.5.14)
Type: Agenda
Status: DRAFT
Contact
05/13/2014 Economic Planning Study Agenda (5.13.14) (v: 1)
DraftEPSAgenda(5-13-14).docx download>
Description: Economic Planning Study Agenda (5.13.14)
Type: Agenda
Status: DRAFT
Contact
05/13/2014 Economic Planning Study Presentation (5.13.14) (v: 1)
EPS_5_13_v2.pdf download>
Description: Economic Planning Study Presentation (5.13.14)
Type: Presentation
Status: DRAFT
Contact
04/24/2014 Attachment B - CG Transmission Planning Spreadsheet (v: 1)
...ansmissionPlanningDraftSA.xlsx download>
Description: Attachment B - CG Transmission Planning Spreadsheet
Type: Spreadsheet
Status: DRAFT
Contact
04/24/2014 Ten Year Plan (v: 1)
tenyearplan2014draft.xlsx download>
Description: Ten Year Plan
Type: Spreadsheet
Status: DRAFT
Contact
04/24/2014 2014 System Assessment Joint Assessments (v: 1)
...ystemAssessmentJointIssues.pdf download>
Description: 2014 System Assessment Joint Assessments
Type: Presentation
Status: FINAL
Contact
04/24/2014 Decisions & Action Items from March 13 (v: 1)
...onsActionItemsfromMarch 13.pdf download>
Description: Decisions & Action Items from March 13
Type: Minutes
Status: FINAL
Contact
04/24/2014 Reliability Standards Updates (v: 1)
...andards_Updates_4_24_14_v1.ppt download>
Description: Reliability Standards Updates
Type: Presentation
Status: FINAL
Contact
04/23/2014 Draft Planning Agenda (4.24.14) (v: 1)
PEFA_Biennial_4_24_Agenda.docx download>
Description: Draft Planning Agenda (4.24.14)
Type: Agenda
Status: DRAFT
Contact
04/23/2014 System Assessment Slides (v: 1)
...emAssessmentSlides_4-24-14.pdf download>
Description: System Assessment Slides
Type: Presentation
Status: FINAL
Contact
03/31/2014 Economic Planning Studies Presentation (4.01.14) v5 (v: 1)
EPS_4_1_v5.pdf download>
Description: Economic Planning Studies Presentation (4.01.14) v5
Type: Presentation
Status: FINAL
Contact
03/27/2014 Economic Planning Study Agenda (4.01.14) (v: 1)
DraftEPSAgenda4.01.14.pdf download>
Description: Economic Planning Study Draft Agenda (4.01.14)
Type: Agenda
Status: DRAFT
Contact
03/13/2014 FERC Order Physical Security (v: 1)
RC_Order_Physical_Security.pdf download>
Description: FERC Order Physical Security
Type: Presentation
Status: FINAL
03/13/2014 2013 NOS Cluster Studies Update (v: 1)
...dyStatusColumbiaGrid031314.pdf download>
Description: 2013 NOS Cluster Studies Update; Planning and Expansion; NOS
Type: Presentation
Status: FINAL
03/12/2021 Reliability Standards Updates (v: 1)
...andards_Updates_3_13_14_v1.pdf download>
Description: Reliability Standards Updates
Type: Presentation
Status: DRAFT
Contact
03/12/2021 TX Projects System Assessment 2014 Draft (v: 1)
Tx Proj SA 2014 draft.xlsx download>
Description: TX Projects System Assessment 2014 Draft
Type: Spreadsheet
Status: DRAFT
Contact
03/11/2021 EPS Presentation (3.11.14) (v: 1)
EPS_3_11_v3.pdf download>
Description: EPS Presentation
Type: Presentation
Status: DRAFT
Contact
03/11/2021 Interface Flow Spreadsheet (Large File 67MB) (v: 1)
...0307aV2_Interface_Flow_v3.xlsx download>
Description: Interface Flow Spreadsheet
Type: Spreadsheet
Status: DRAFT
Contact
03/10/2021 Economic Planning Study Agenda (3.11.14) (v: 1)
DraftEPSAgenda(3-11-14).pdf download>
Description: Economic Planning Study Draft Agenda (3.11.14)
Type: Agenda
Status: DRAFT
Contact
02/27/2014 WC Planning Overview Planning Region Coordinating Meeting (2.28.14) (v: 1)
...2814PlanningRegionCoordMtg.pdf download>
Description: WC Planning Overview Planning Region Coordinating Meeting (2.28.14)
Type: Presentation
Status: FINAL
02/13/2014 Planning Regions Coordination Meeting Agenda Final (02.28.14) (v: 1)
...etingAgendaFinal(02.28.14).pdf download>
Description: Planning Regions Coordination Meeting Agenda Final (02.28.14)
Type: Agenda
Status: FINAL
Contact
02/12/2021 NWPP MC Final Phase 2 Report - Public Distribution (v: 1)
...2Report-PublicDistribution.pdf download>
Description: NWPP MC Final Phase 2 Report - Public Distribution
Type: Report
Status: FINAL
02/12/2021 NWPP EIM Ph 1 Update (v: 1)
NWPP_EIMPh1Update.pdf download>
Description: NWPP EIM Ph 1 Update
Type: Presentation
Status: FINAL
02/11/2021 DTC TF Briefing CAISO EIM Initiative - J Price (v: 1)
....Initiative20140211-JPrice.pdf download>
Description: DTC TF Briefing CAISO EIM Initiative - J Price
Type: Presentation
Status: FINAL
02/11/2021 NWPP MCI - Ph2 Update & Ph 3 Goals (v: 1)
...pdate&Ph3Goals;(2022.02.11).pdf download>
Description: NWPP MCI - Ph2 Update & Ph 3 Goals
Type: Presentation
Status: FINAL
02/11/2021 Emerging Issues and Changes (v: 1)
EmergingIssuesandChanges.pdf download>
Description: Emerging Issues and Changes
Type: Presentation
Status: FINAL
02/11/2021 DTC Task Force Presentation (Ramu) (v: 1)
...kForcePresentation02112014.pdf download>
Description: DTC Task Force Presentation (Ramu)
Type: Presentation
Status: FINAL
02/06/2021 DTC Taskforce Draft Agenda (2.11.14) (v: 1)
...a2014.02.11.1330(Proposed).pdf download>
Description: DTC Taskforce Draft Agenda (2.11.14)
Type: Agenda
Status: DRAFT
02/04/2021 Planning Regions Coordination Meeting Notice 2.28.14 (v: 1)
...tionMeetingNotice_2.28.14.docx download>
Description: Planning Regions Coordination Meeting Notice 2.28.14
Type: Notice
Status: DRAFT
02/03/2022 Economic Planning Study v2. (v: 1)
EPS_2_3_v2.pdf download>
Description: Economic Planning Study v2 (02.03.14).
Type: Presentation
Status: DRAFT
Contact
01/31/2014 Economic Planning Study Agenda (02.03.14) (v: 1)
DraftEPSAgenda(02.03.14).pdf download>
Description: Draft Production Cost Study Agenda (02.03.14)
Type: Agenda
Status: DRAFT
Contact
01/30/2014 Action Items from 1.16.14 (v: 1)
ActionItemsfrom1-16-14CGPM.pdf download>
Description: Action Items from 1.16.14;
Type: Minutes
Status: FINAL
Contact
01/30/2014 Draft Planning Agenda (3.13.14) (v: 1)
...ftPlanningAgenda(3-13-14).docx download>
Description: Draft Planning Agenda (3.13.14)
Type: Agenda
Status: DRAFT
01/16/2014 Draft Planning Agenda (1.16.14) (v: 2)
PlanningAgenda(1-16-14).docx download>
Description: Draft Planning Agenda 1.16.14
Type: Agenda
Status: FINAL
01/16/2014 May 30 2013 Event Presentation (Stephanie Lu) (v: 1)
...Presentation_SGL 2014-1-16.pdf download>
Description: May 30 2013 Event Presentation (Stephanie Lu)
Type: Presentation
Status: FINAL
01/16/2014 Cluster Study Extension (v: 1)
Cluster Study Extension.pdf download>
Description: Cluster Study Extension
Type: Presentation
Status: FINAL
01/16/2014 2013 Cluster Study Status (v: 1)
...tus ColumbiaGrid 011614 v1.pdf download>
Description: 2013 Cluster Study Status
Type: Presentation
Status: FINAL
01/16/2014 Reduced Conservation Presentation (v: 1)
...tion 1_16 Planning Meeting.pdf download>
Description: Reduced Conservation Presentation
Type: Presentation
Status: FINAL
Contact
01/16/2014 2014 System Assessment Basecases Presentation (Jonathan) (v: 1)
...SystemAssessment_Basecases.pdf download>
Description: 2014 System Assessment Basecases Presentation (Jonathan)
Type: Presentation
Status: FINAL
Contact
01/15/2014 Interface Flow 1220b v3 TierWheel (LARGE 44mb file) (v: 1)
...e_Flow_1220b_v3_TierWheel.xlsx download>
Description: Interface Flow 1220b v3 TierWheel (LARGE 44mb file)
Type: Spreadsheet
Status: DRAFT
Contact
01/13/2014 TPL1-4 Presentation (1.15.14) (v: 1)
TPL1_4Presentation.pdf download>
Description: TPL1-4 Presentation (1.15.14)
Type: Presentation
Status: DRAFT
Contact
01/13/2014 TPL1-4 (v: 1)
TPL1_4.pdf download>
Description: TPL1-4
Type: Document (pdf)
Status: DRAFT
Contact
01/13/2014 TPL Table (v: 1)
TPL_Table.pdf download>
Description: TPL Table
Type: Document (pdf)
Status: FINAL
Contact
01/13/2014 Economic Planning Study Agenda (1.13.14) (v: 1)
DraftEPSAgenda(1-13-14).pdf download>
Description: Economic Planning Study Agenda (1.13.14)
Type: Agenda
Status: DRAFT
Contact
01/13/2014 Economic Planning Study (v: 1)
EPS_12_09_v2.pdf download>
Description: Economic Planning Study
Type: Presentation
Status: FINAL
Contact
12/23/2013 Order 1000 Functional Agreement 12.17.13 (v: 1)
...ctional Agreement 12-17-13.pdf download>
Description: Order 1000 Functional Agreement 12.17.13
Type: Functional Agreement
Status: FINAL
12/17/2013 Action Items from 12.5.13 (v: 1)
ctionItemsfrom12-5-13CGPM.docx download>
Description: Action Items from 12.5.13
Type: Minutes
Status: DRAFT
Contact
12/17/2013 TPL-001-4 (v: 1)
TPL-001-4.pdf download>
Description: TPL-001-4
Type: Document (pdf)
Status: DRAFT
12/17/2013 Mapping Guidelines for TPL-001-2 (v: 1)
...ingGuidelinesforTPL-001-2.xlsx download>
Description: Mapping Guidelines for TPL-001-2
Type: Spreadsheet
Status: DRAFT
12/17/2013 TPL-001-4 Workshop Agenda (1.15.14) (v: 1)
...001-4Workshop1-15-14-rev1.docx download>
Description: TPL-001-4 Workshop Agenda (1.15.14)
Type: Agenda
Status: DRAFT
12/16/2013 Smart Wire Grid Q&A; from CG meeting 10/17/13 (v: 2)
WG-FAQ_Q1-29_2013-12-05_v1.pdf download>
Description: Smart Wire Grid Q&A; from CG meeting 10/17/13
Type: Report
Status: DRAFT
12/09/2021 Planning Presentation (Marv) 12.5.13 (v: 1)
CG-PlgMtg12-5-13.pdf download>
Description: Planning Presentation (Marv) 12.5.13
Type: Presentation
Status: FINAL
Contact
12/09/2021 ColumbiaGrid VARS Presentation (v: 1)
lumbiaGridVAR-Presentation.pdf download>
Description: ColumbiaGrid VARS Presentation
Type: Presentation
Status: FINAL
12/09/2021 Compare Historic Path Flow Spreadsheet (v: 1)
Compare_Hist_Path_Flow.xlsx download>
Description: Compare Historic Path Flow Spreadsheet
Type: Spreadsheet
Status: DRAFT
Contact
12/09/2021 Interface Flow 1206 (30MB file) (v: 1)
nterface_Flow_1206a_NewNG.xlsx download>
Description: Interface Flow 1206 (30MB file)
Type: Spreadsheet
Status: DRAFT
Contact
12/09/2021 Production Cost Models Presentation 12.9.13 (v: 1)
CG_PCM_Meeting_2013_1209a.pdf download>
Description: Production Cost Models Presentation 12.9.13
Type: Presentation
Status: FINAL
Contact
12/09/2021 Economic Planning Study Presentation 12.913 (v: 1)
EPS_12_09_v2.pdf download>
Description: Economic Planning Study Presentation 12.913
Type: Presentation
Status: DRAFT
Contact
12/09/2021 Economic Planning Study Agenda (12.9.13) (v: 1)
raftEPSAgenda(12-9-13)_V1.docx download>
Description: Economic Planning Study Agenda (12.9.13)
Type: Agenda
Status: DRAFT
Contact
12/05/2021 2013 Cluster Study Status Presentation (v: 1)
...sterStudyStatusCG120513 v3.pdf download>
Description: 2013 Cluster Study Status Presentation
Type: Presentation
Status: FINAL
12/05/2021 NWPP - GMD-GIC Overview Presentation (v: 1)
...verview_RABecker(10-16-13).pdf download>
Description: NWPP - GMD-GIC Overview Presentation
Type: Presentation
Status: FINAL
12/04/2021 Reliability Standards Update 12.5.13 (v: 1)
...Standards_Updates_12_05_v1.pdf download>
Description: Reliability Standards Update 12.5.13
Type: Presentation
Status: FINAL
Contact
12/04/2021 Draft Planning Agenda (12.05.13) (v: 1)
...ftPlanningAgenda(12-5-13).docx download>
Description: Draft Planning Agenda (12.05.13)
Type: Agenda
Status: DRAFT
10/18/2013 PJM 20/20 Transmission Technologies - Geomagnetic Disturbances (v: 1)
...echnology-panel-4-bernabue.pdf download>
Description: PJM 20/20 Transmission Technologies - Geomagnetic Disturbances
Type: Presentation
Status: FINAL
10/17/2013 2013 NOS CG Planning Meeting Presentation (v: 1)
...dPlanningMeeting10-17-13v1.pdf download>
Description: 2013 NOS CG Planning Meeting Presentation
Type: Presentation
Status: FINAL
10/17/2013 2013 Cluster Study Project List (v: 1)
013ClusterStudyProjectList.pdf download>
Description: 2013 Cluster Study Project List
Type: Document (pdf)
Status: FINAL
10/17/2013 TPL-001-4 (v: 1)
TPL-001-4.pdf download>
Description: TPL-001
Type: Presentation
Status: FINAL
Contact
10/17/2013 SWG Presentation (v: 1)
...on_ColumbiaGrid_2013-10-17.pdf download>
Description: SWG Presentation
Type: Presentation
Status: FINAL
Contact
10/16/2013 Reliability Standards Updates (v: 1)
...Standards_Updates_10_13_v2.pdf download>
Description: Reliability Standards Updates
Type: Presentation
Status: FINAL
Contact
08/07/2021 Draft Planning Agenda (10.17.13) (v: 1)
...tPlanningAgenda(10-17-13).docx download>
Description: Draft Planning Agenda (10.17.13)
Type: Agenda
Status: DRAFT
Contact
08/07/2021 Action Items from 8.1.13 (v: 1)
ActionItemsfrom8-1-13CGPM.pdf download>
Description: Action Items from 8.1.13
Type: Minutes
Status: DRAFT
Contact
08/01/2022 WECC TEPPC Study Requests (v: 1)
130801_CG_2012Studies.pptx download>
Description: WECC TEPPC Study Requests
Type: Presentation
Status: DRAFT
08/01/2022 BPA Network Open Season 2013 Presentation (v: 1)
...G Meeting 08-01-13-rmj_krk.pdf download>
Description: BPA Network Open Season 2013 Presentation
Type: Presentation
Status: FINAL
08/01/2022 Grid Tracker (v: 1)
...ion-ColumbiaGrid_08-01-13.pptx download>
Description: Grid Tracker
Type: Presentation
Status: FINAL
07/31/2013 Draft PA PC TP Mandatory Standards (v: 1)
...PC_TP Mandatory Standards.xlsx download>
Description: Draft PA PC TP Mandatory Standards
Type: Spreadsheet
Status: DRAFT
Contact
07/31/2013 Reliability Standards Updates Presentation (v: 1)
...ndards_Updates_8_13_v1 (2).pdf download>
Description: Reliability Standards Updates Presentation
Type: Presentation
Status: FINAL
Contact
07/31/2013 Collaborative Study Efforts Presentation (v: 1)
CollaborativeStudyEfforts.pdf download>
Description: Collaborative Study Efforts Presentation
Type: Presentation
Status: FINAL
07/01/2022 2013 System Assessment FINAL (v: 3)
2013SAforweb(7.1.13)FINAL.pdf download>
Description: 2013 Public Draft System Assessment
Type: Report
Status: FINAL
06/19/2013 DeltaView Compare Final PEFA Fourth Restatement with Third (v: 1)
...FourthRestatementwithThird.pdf download>
Description: DeltaView Compare Final PEFA Fourth Restatement with Third
Type: Document (pdf)
Status: DRAFT
Contact
06/17/2013 PGE Announces Project Changes (v: 1)
OR_News_2013_6_3_Financial.pdf download>
Description: PGE Announces Project Changes
Type: Report
Status: DRAFT
06/07/2021 Draft Planning Agenda (8.1.13) (v: 1)
aftPlanningAgenda(8-1-13).docx download>
Description: Draft Planning Agenda (8.1.13)
Type: Agenda
Status: DRAFT
Contact
06/07/2021 Action Items from 6.6.13 (v: 1)
ActionItemsfrom6-6-13CGPM.pdf download>
Description: Action Items from 6.6.13
Type: Minutes
Status: DRAFT
Contact
06/06/2021 2013 NOS CG Meeting Presentation (v: 1)
13NOSCGMeeting06-06-13-rmj.pdf download>
Description: 2013 NOS CG Meeting Presentation
Type: Presentation
Status: DRAFT
06/06/2021 Seasonal Study Coordnation (v: 1)
SeasonalStudyCoordination.pdf download>
Description: Seasonal Study Coordnation
Type: Presentation
Status: DRAFT
06/06/2021 Joint Issues (Amy) (v: 1)
JointIssues.pdf download>
Description: Joint Issues (Amy)
Type: Presentation
Status: DRAFT
Contact
06/06/2021 CG Planning Meeting Presentation (Marv) (v: 1)
CGPlgMtg6-6-13.pdf download>
Description: CG Planning Meeting Presentation (Marv)
Type: Presentation
Status: DRAFT
Contact
06/05/2021 PowerWorld Complete Contingency Results Processor (6.6.13) (v: 2)
...yResultsProcessor_6_6_2013.pdf download>
Description: PowerWorld Complete Contingency Results Processor (6.6.13)
Type: Spreadsheet
Status: DRAFT
Contact
06/05/2021 Reliability Standards Updates (v: 1)
...ility_Standards_Updates_v1.pdf download>
Description: Reliability Standards Updates
Type: Presentation
Status: DRAFT
Contact
05/03/2022 Draft Planning Agenda (6.6.13) (v: 1)
aftPlanningAgenda(6-6-13).docx download>
Description: Draft Planning Agenda (6.6.13)
Type: Agenda
Status: DRAFT
05/03/2022 Action Items from 5.2.13 Planning Meeting (v: 1)
ActionItemsfrom5-2-13CGPM.pdf download>
Description: Action Items from 5.2.13 Planning Meeting
Type:
Status: DRAFT
Contact
05/02/2022 Attachment A: Resource Assumptions for Base Cases (MW Output (v: 1)
Resource Table.pdf download>
Description: Attachment A: Resource Assumptions for Base Cases (MW Output
Type: Document (pdf)
Status: DRAFT
Contact
05/02/2022 Ten Year Plan Projects Spreadsheet (SA2013) (v: 1)
...nCommittedProjectsSA20131.xlsx download>
Description: Ten Year Plan Projects Spreadsheet (SA2013)
Type: Spreadsheet
Status: DRAFT
Contact
05/02/2022 BPA Network Open Season 2013 Cluster Study (v: 1)
013NOS-CGMeeting05-02-13_C.ppt download>
Description: BPA Network Open Season 2013 Cluster Study
Type: Presentation
Status: DRAFT
05/01/2022 System Assessment 2013 Graphics and Tables (v: 1)
Attachments2013SA.pdf download>
Description: System Assessment 2013 Attachments
Type: Document (pdf)
Status: DRAFT
Contact
05/01/2022 WECC Update (v: 1)
WECC_Update_V2.pdf download>
Description: WECC Update
Type: Presentation
Status: DRAFT
Contact
05/01/2022 System Assessment Schedule 2013 (v: 1)
SystemAssessmentSchedule.pdf download>
Description: System Assessment Schedule 2013
Type: Presentation
Status: DRAFT
Contact
05/01/2022 BPA Grid Transformation Update (v: 1)
BPA-GTW-Summary.pdf download>
Description: BPA Grid Transformation Update
Type: Presentation
Status: DRAFT
04/29/2013 Attachment B - Transmission Planning Draft 2013 Spreadsheet (2013 System Assessment) (v: 1)
...nPlanningDraftSA(4-25-13).xlsx download>
Description: Attachment B - Transmission Planning Draft 2013 Spreadsheet (2013 System Assessment)
Type: Spreadsheet
Status: DRAFT
Contact
04/03/2022 Historical vs. Future Flow Presentation (v: 1)
...torical_vs_Future_Flow_sm1.pdf download>
Description: Historical vs. Future Flow Presentation
Type: Presentation
Status: DRAFT
Contact
04/01/2022 PDCI Upgrade Planning Coordination Meeting (BPA)4.2.13 (v: 2)
...CoordMeeting04-02-13(BPA)1.pdf download>
Description: PDCI Upgrade Planning Coordination Meeting (4.2.13)
Type: Presentation
Status: DRAFT
04/01/2022 PDCI Project Coordination Presentation (Jeff Miller) 4.2.13 (v: 1)
...nPresentation4-2-13(JeffM).pdf download>
Description: PDCI Project Coordination Presentation (Jeff Miller) 4.2.13
Type: Presentation
Status: DRAFT
Contact
03/27/2013 Project Coordination and Path Rating Processes (v: 1)
... and Path Rating Processes.pdf download>
Description: Project Coordination and Path Rating Processes
Type: Report
Status: FINAL
03/22/2013 PDCI Draft Agenda (4.2.13) (v: 1)
...genda-PDCIUpgrade4-2-2013.docx download>
Description: PDCI Draft Agenda 4.2.13
Type: Agenda
Status: DRAFT
03/12/2021 Draft Planning Agenda (5.2.13) (v: 1)
aftPlanningAgenda(5-2-13).docx download>
Description: Planning Agenda 5.2.13
Type: Agenda
Status: DRAFT
03/12/2021 Action Items from 3.7.13 (v: 1)
ActionItemsfrom3-7-13CGPM.pdf download>
Description: Action Items from 3.7.13
Type: Minutes
Status: DRAFT
Contact
03/06/2021 Ten Year Plan Committed Projects SA 2013 (v: 1)
...edProjectsSA2013_Comments.xlsx download>
Description: Ten Year Plan Committed Projects SA 2013
Type: Spreadsheet
Status: DRAFT
Contact
03/06/2021 System Assessment Assumptions (v: 1)
ystemAssessmentAssumptions.pdf download>
Description: System Assessment Assumptions
Type: Presentation
Status: DRAFT
Contact
03/04/2021 Summary of Feb 06 Stakeholder Comments-1 (03.11.13) (v: 1)
...fFeb06StakeholderComments1.pdf download>
Description: Summary of Feb 06 Stakeholder Comments-1 (03.11.13)
Type: Document (pdf)
Status: FINAL
Contact
03/04/2021 Proposed Interregional Coordination Approach Summary (03.11.13) (v: 1)
...oordinationApproachSummary.pdf download>
Description: Proposed Interregional Coordination Approach Summary
Type: Document (pdf)
Status: FINAL
Contact
03/04/2021 Common Interregional Tariff Language for Final TP Approval (03.11.13) (v: 1)
...LanguageforFinalTPApproval.pdf download>
Description: Common Interregional Tariff Language for Final TP Approval
Type: Document (pdf)
Status: FINAL
Contact
03/04/2021 Interregional O1K Stakeholder Call Notice (03.11.13) (v: 1)
...alO1K takeholderCallNotice.pdf download>
Description: Interregional O1K Stakeholder Call Notice (03.11.13)
Type: Notice
Status: FINAL
Contact
02/28/2013 Draft Planning Agenda (3.7.13) (v: 1)
aftPlanningAgenda(3-7-13).docx download>
Description: Draft Planning Agenda (3.7.13)
Type: Agenda
Status: DRAFT
Contact
02/27/2013 2013 Biennial Transmission Expansion Plan (v: 2)
BP2013-forWeb1.pdf download>
Description: 2013 Biennial Transmission Expansion Plan
Type: Report
Status: FINAL
02/21/2013 Gas-Electric I5 Gas Curtailment Study Fourth Draft (2.21.13) (v: 1)
...udy-Fourth Draft_2-21-2013.doc download>
Description: Gas-Electric I5 Gas Curtailment Study Fourth Draft (2.21.13)
Type: Report
Status: DRAFT
Contact
02/14/2013 Action Items from 1.31.13 (v: 1)
ActionItemsfrom1-31-13CGPM.pdf download>
Description: Action Items from 1.31.13
Type: Minutes
Status: DRAFT
Contact
02/11/2021 TransWest Comments on FERC Order 1000 (v: 1)
ansWest02-06-13ICTComments.pdf download>
Description: TransWest Comments on FERC Order 1000
Type: Comments
Status: DRAFT
02/07/2021 SWPG Comments on Order 1000 (v: 1)
...gionalCoordination2.6.2013.pdf download>
Description: Southwestern Power Group Comments on Order 1000
Type: Comments
Status: DRAFT
02/07/2021 WUTC Comments on Order 1000 (v: 1)
...gionalCoordinationApproach.pdf download>
Description: WUTC Comments on Order 1000
Type: Comments
Status: DRAFT
02/07/2021 Renewable Northwest Project Comments on Order 1000 (v: 1)
O1KICTStkhldrCmmntsFeb6.pdf download>
Description: Renewable Northwest Project Comments on Order 1000
Type: Comments
Status: DRAFT
02/07/2021 PG&E; Comments on FERC Order 1000 (v: 1)
...b2013PGECmmntsFO1KICTFINAL.pdf download>
Description: PG&E; Comments on FERC Order 1000
Type: Comments
Status: DRAFT
02/07/2021 SCE Comments on FERC Order 1000 (v: 1)
...erregionalSKHMtg(02-06-13).pdf download>
Description: SCE Comments on FERC Order 1000
Type: Comments
Status: DRAFT
02/06/2021 Interstate Renewable Energy Council Comments on FERC Order 1000 (v: 1)
...ICTStakeholderCommentsIREC.pdf download>
Description: Interstate Renewable Energy Council Comments on FERC Order 1000
Type: Comments
Status: DRAFT
02/04/2021 Gas Electric I5 Gas Curtailment Study Third Draft (v: 1)
...tStudy-ThirdDraft_1-3-2013.doc download>
Description: Gas Electric I5 Gas Curtailment Study Third Draft
Type: Document (pdf)
Status: DRAFT
Contact
01/31/2013 Promod Flow Gate Revised (v: 1)
...evised_color MJL SAW GC AJ.xls download>
Description: Promod Flow Gate Revised
Type: Spreadsheet
Status: DRAFT
Contact
01/31/2013 2013 System Assessment Basecases (v: 1)
...Assessment_Basecases_rev1.pptx download>
Description: 2013 System Assessment Basecases
Type: Presentation
Status: DRAFT
Contact
01/31/2013 Load and Resource Forecast 1.31.13 (v: 1)
...dResourceForecast1-31-2013.xls download>
Description: Load and Resource Forecast 1.31.13
Type: Spreadsheet
Status: DRAFT
Contact
01/31/2013 Ten Year Committed Projects SA 2013 (v: 1)
...anCommittedProjectsSA2013.xlsx download>
Description: Ten Year Committed Projects SA 2013
Type: Spreadsheet
Status: DRAFT
Contact
01/30/2013 2013 Study Requests (v: 1)
2013StudyRequests.doc download>
Description: 2013 Study Requests
Type: Letter
Status: DRAFT
Contact
01/28/2013 1.31.13 FO1K Stakeholder Meeting Presentation Final (v: 1)
...rMeetingPresentation_Final.pdf download>
Description: 1.31.13 FO1K Stakeholder Meeting Presentation Final
Type: Presentation
Status: FINAL
Contact
01/23/2013 1.30.13 Proposed Interregional Coordination Approach Summary (v: 1)
...ary(forStakeholderMeeting).pdf download>
Description: 1.30.13 Proposed Interregional Coordination Approach Summary
Type: Report
Status: DRAFT
Contact
01/23/2013 Order 1000 Interregional Stakeholder Meeting Agenda (01.30.13) (v: 1)
...nalO1KStakeholderMtgAgenda.pdf download>
Description: Order 1000 Interregional Stakeholder Meeting Agenda
Type: Agenda
Status: FINAL
01/15/2013 Draft Planning Agenda (1.31.13) (v: 2)
...anningAgenda(1-31-13) (2).docx download>
Description: Draft Planning Agenda (1.31.13)
Type: Agenda
Status: DRAFT
Contact
01/14/2013 Interregional Order 1000 Stakeholder Meeting Notice (01.30.13) (v: 2)
...ionalO1KStakeholderMtgNtc1.pdf download>
Description: Interregional Order 1000 Stakeholder Meeting Notice (01.30.13)
Type: Notice
Status: DRAFT
01/10/2021 Action Items from (12.6.12) (v: 1)
ActionItemsfrom12-6-12CGPM.pdf download>
Description: Action Items from (12.6.12)
Type: Minutes
Status: DRAFT
Contact
01/09/2021 (1.7.13) Galle Comments on FERC Order 1000 (v: 1)
...rder1000comments2013-01-07.pdf download>
Description: (1.7.13) Galle Comments on FERC Order 1000
Type: Comments
Status: DRAFT
01/09/2021 (1.7.13) TransWest Comments on FERC Order 1000 (v: 1)
...nsWest 1-7-13 ICT Comments.pdf download>
Description: (1.7.13) TransWest Comments on FERC Order 1000
Type: Comments
Status: DRAFT
01/09/2021 (1.7.13) Comments from SCE on FERC Order 1000 (v: 1)
...r1000Interregional1.7.2013.pdf download>
Description: (1.7.13) Comments from SCE on FERC Order 1000
Type: Comments
Status: DRAFT
01/09/2021 (1.7.13) Comments from Public Interest Organizations Interregional Coordination (v: 1)
...interregional-coordination.pdf download>
Description: (1.7.13) Comments from Public Interest Organizations Interregional Coordination
Type: Comments
Status: DRAFT
12/26/2012 Assignment Agreement Enbridge to MATL (v: 1)
...ignmentAgrmtEnbridgetoMATL.pdf download>
Description: Assignment Agreement Enbridge to MATL
Type: Functional Agreement
Status: FINAL
Contact
12/18/2012 Stakeholder Meeting Presentation v.2 (12.19.12) (v: 2)
...sentation_Final (12 18 12).pdf download>
Description: Stakeholder Meeting Presentation Final v.2(12.19.12)
Type: Presentation
Status: FINAL
12/17/2012 Agreed Upon Framework (12.19.12) (v: 1)
...d-Upon Framework(12.19.12).pdf download>
Description: Agreed Upon Framework
Type: Document (pdf)
Status: DRAFT
Contact
12/14/2012 Stakeholder Mtg Agenda (12.19.12) (v: 1)
...lder Mtg Agenda (12.19.12).pdf download>
Description: Stakeholder Mtg Agenda (12.19.12);
Type: Agenda
Status: FINAL
12/13/2012 ICT Master Calendar (v: 1)
121205ICTMasterCalendar.pdf download>
Description: ICT Master Calendar
Type: Timelines
Status: DRAFT
Contact
12/13/2012 I-5 Gas Curtailment Study - Third Draft (12.13.12) (v: 2)
...udy-ThirdDraft 12-13-20121.doc download>
Description: I-5 Gas Curtailment Study - Third Draft (12.13.12)
Type: Report
Status: DRAFT
Contact
12/13/2012 Gas Study Team Agenda (12.20.12) (v: 1)
asStudyTeamAgenda12-20-12.docx download>
Description: Gas Study Team Agenda (12.20.12)
Type: Agenda
Status: DRAFT
Contact
12/12/2021 Interregional Cost Allocation Draft Proposal (12.19.12) (v: 1)
...sal_12 12 12_ver 1 0_CLEAN.pdf download>
Description: Interregional Cost Allocation Draft Proposal
Type: Policy/Procedure
Status: DRAFT
12/12/2021 Interregional Transmission Planning Coordination Procedures (12.19.12) (v: 1)
...ng Coordination Procedures.pdf download>
Description: Interregional Transmission Planning Coordination Procedures
Type: Policy/Procedure
Status: DRAFT
12/11/2021 12.19.12 Order 1000 Interregional Stakeholder Meeting (12.19.12) (v: 1)
...derMeetingNotice(12.11.12).pdf download>
Description: 12.19.12 Order 1000 Interregional Stakeholder Meeting
Type: Notice
Status: FINAL
Contact
12/06/2021 MSRATF Scopework Draft (12.5.12) (v: 1)
...peofWork-Draft-12052012-3.docx download>
Description: MSRATF Scopework Draft (12.5.12)
Type: Report
Status: DRAFT
12/05/2021 ColumbiaGrid Relay Presentation (v: 1)
...d_Relay_Presentation_Final.pdf download>
Description: ColumbiaGrid Relay Presentation
Type: Presentation
Status: DRAFT
12/05/2021 Draft Planning Agenda (12.6.12) (v: 1)
...ftPlanningAgenda(12-6-12).docx download>
Description: Draft Planning Agenda (12.6.12)
Type: Agenda
Status: DRAFT
Contact
12/04/2021 Decisions and Action Items from October 25, 2021 (v: 1)
ctionItemsfrom10-25-12CGPM.pdf download>
Description: Decisions and Action Items from October 25, 2021
Type: Minutes
Status: DRAFT
Contact
12/04/2021 NOS Process Timing (v: 1)
nos_process_timing.pdf download>
Description: NOS Process Timing
Type: Presentation
Status: DRAFT
11/27/2012 LS Power Comments on FERC Order 1000 (v: 1)
LSPowerCommentsOrder1000.pdf download>
Description: LS Power Comments on FERC Order 1000
Type: Comments
Status: DRAFT
11/27/2012 Cities of Anaheim, Azusa, Banning, Colton, Pasadena & Riverside Comments on FERC Order 1000 (v: 1)
...ingColtonPasadenaRiverside.pdf download>
Description: Cities of Anaheim, Azusa, Banning, Colton, Pasadena & Riverside Comments on FERC Order 1000
Type: Comments
Status: DRAFT
11/27/2012 NWEC Comments on FERC Order 1000 (v: 1)
...000-interregional-comments.pdf download>
Description: NWEC Comments on FERC Order 1000
Type: Comments
Status: DRAFT
11/27/2012 UTC Comments on FERC Order 1000 (v: 1)
UTC_Comments_Nov_21_12.pdf download>
Description: UTC Comments on FERC Order 1000
Type: Comments
Status: DRAFT
11/27/2012 Siemens PTI McElvain Comments on FERC Order 1000 (v: 1)
iemensPTI-McElvainComments.pdf download>
Description: Siemens PTI McElvain Comments on FERC Order 1000
Type: Comments
Status: DRAFT
11/27/2012 TransWest Comments on FERC Order 1000 (v: 1)
...West_11-21-12_ICT_comments.pdf download>
Description: TransWest Comments on Ferc Order 1000
Type: Comments
Status: DRAFT
11/21/2012 Draft 2013 Biennial Plan Graphics, Tables & Attachment A (v: 1)
2013BP-Attachments.pdf download>
Description: Draft 2013 Biennial Plan Attachments and Tables
Type: Document (pdf)
Status: DRAFT
Contact
11/21/2012 Draft 2013 Biennial Transmission Expansion Plan Attachment B (v: 1)
...nPlanningDraftBP(11-7-12).xlsx download>
Description: 2013 Biennial Transmission Expansion Plan Attachment B
Type: Spreadsheet
Status: DRAFT
Contact
11/21/2012 Southern Cal Edison Comments on FERC Order 1000 (v: 1)
SCE CommentsOrder1000.pdf download>
Description: ICT Stakeholder Comments - Southern California Edison
Type: Comments
Status: FINAL
11/21/2012 PG&E; and SDG&E; Joint Comments on FERC Order 1000 (v: 1)
...GE_JointComments Order1000.pdf download>
Description: PG&E; and SDG&E; Joint Comments on FERC Order 1000
Type: Comments
Status: FINAL
11/16/2012 I-5 Gas Curtailment Study - Stakeholder Review Draft (11.16.12) (v: 1)
...er Review Draft (11.16.12).pdf download>
Description: I-5 Gas Curtailment Study - Stakeholder Review Draft (11.16.12)
Type: Document (pdf)
Status: DRAFT
Contact
11/16/2012 Gas Study Team Agenda (11.20.12) (v: 1)
...dy Team Agenda 11-20-20121.pdf download>
Description: Gas Study Team Agenda (11.20.12)
Type: Agenda
Status: DRAFT
Contact
11/16/2012 Order 1000 Interregional Stakeholder Presentation Final (11.16.12) (v: 1)
...resentationFinal(11.16.12).pdf download>
Description: Order 1000 Interregional Stakeholder Presentation Final (11.16.12)
Type: Presentation
Status: FINAL
11/16/2012 Order 1000 Stakeholder Comments RNP NRDC WRA VS(11.16.12) (v: 1)
...ts RNP NRDC WRA VS(111612).pdf download>
Description: Order 1000 Interregional StakeholderComments from RNP NRDC WRA VS (111612)
Type: Comments
Status: FINAL
11/14/2012 Order 1000 Interregional Stakeholder Meeting Notice (11.16.12) (v: 1)
...holderMtgNtcFINAL.11 16 12.pdf download>
Description: Order 1000 Interregional Stakeholder Meeting Notice -Web and Phone Conference Meeting
Type: Notice
Status: FINAL
Contact
11/13/2012 ICT Master Calendar (v: 1)
121112ICTMasterCalendar.pdf download>
Description: ICT Master Calendar
Type: Timelines
Status: FINAL
11/07/2021 PEFA Third Amendment and Restatement (10.21.12) (v: 1)
...ndmentRestatement(10-1-12).pdf download>
Description: PEFA Third Amendment and Restatement (10.21.12)
Type: Functional Agreement
Status: FINAL
11/06/2021 Inter-regional Stakeholder Agenda (11.7.12) (v: 1)
...older Meeting Agenda FINAL.pdf download>
Description: 11.7.12 Inter-regional Stakeholder Meeting Agenda
Type: Agenda
Status: FINAL
11/05/2021 ICT Stakeholder Comments Template (11.2.12) (v: 1)
...akeholderCommentsTemplate.docx download>
Description: ICT Stakeholder Comments Template (11.2.12)
Type: Report
Status: DRAFT
11/05/2021 ICT Master Calendar (11.02.12) (v: 1)
121102ICTMasterCalendar.docx download>
Description: ICT Master Calendar (11.02.12)
Type: Report
Status: DRAFT
11/05/2021 ICT Milestone Schedule (11.02.12) (v: 1)
21102ICTMilestoneSchedule.docx download>
Description: ICT Milestone Schedule (11.02.12)
Type: Document (pdf)
Status: DRAFT
10/25/2012 Northwest Power Conservation Council Presentation(10.25.12) (v: 1)
NWPCC-CG121025.pdf download>
Description: Northwest Power Conservation Council Presentation(10.25.12)
Type: Presentation
Status: DRAFT
10/25/2012 Draft Planning Agenda (10.25.12) (v: 1)
...tPlanningAgenda(10-25-12).docx download>
Description: Draft Planning Agenda (10.25.12)
Type: Agenda
Status: DRAFT
10/22/2012 Gas Study Team Agenda (10.29.12) (v: 1)
sStudyTeamAgenda10-29-2012.pdf download>
Description: Gas - Electric Interdependencies Agenda (10.29.12)
Type: Agenda
Status: DRAFT
10/10/2021 Interregional Stakeholder Meeting Announcement (v: 1)
...holder MeetingAnnouncement.pdf download>
Description: Interregional Stakeholder Meeting Announcement
Type:
Status: DRAFT
Contact
09/07/2021 Gas Study Study Plan - Stakeholder Review Draft (v: 1)
...lan-StakeholderReviewDraft.doc download>
Description: Gas Study Study Plan - Stakeholder Review Draft
Type: Report
Status: DRAFT
Contact
09/06/2021 Gas Study Team Agenda (9.18.12) (v: 1)
asStudyTeamAgenda9-18-2012.pdf download>
Description: Gas Study Team Agenda 9.18.12
Type: Agenda
Status: DRAFT
08/27/2012 Draft Planning Agenda (10.25.12) (v: 1)
...ftPlanningAgenda(10-25-12).pdf download>
Description: Draft Planning Agenda (10.25.12)
Type: Agenda
Status: DRAFT
Contact
07/31/2012 NERC letter to WECC dated July 26, 2021 (v: 1)
WECC72612.pdf download>
Description: NERC letter to WECC
Type: Letter
Status: DRAFT
Contact
07/11/2021 Draft Planning Agenda (8.2.12) (v: 1)
raftPlanningAgenda(8-2-12).pdf download>
Description: Draft Planning Agenda (8-2-12)
Type: Agenda
Status: DRAFT
07/11/2021 Action Items from 6-7-12 CGPM (v: 1)
ActionItemsfrom6-7-12CGPM.pdf download>
Description: Action Items from 6-7-12 CGPM
Type: Document (pdf)
Status: FINAL
Contact
07/03/2022 2012 System Assessment (v: 2)
2012SA-webversion.pdf download>
Description: 2012 System Assessment
Type: Report
Status: FINAL
06/14/2012 Draft PEFA With Possible Order 1000 Amendments (Work in Progress)(6,12.12) (v: 1)
... (WorkinProgress)(6,12.12).pdf download>
Description: Draft PEFA With Possible Order 1000 Amendments (Work in Progress)(6,12.12)
Type: Document (pdf)
Status: DRAFT
Contact
06/11/2021 Order 1000 Meeting Agenda (6.12.12) (v: 1)
6.12.12 Proposed Agenda.pdf download>
Description: Proposed Agenda (6.12.12)
Type: Agenda
Status: FINAL
Contact
06/11/2021 CG Planning Process Enhanced for Order 1000 (6.12.12) with slides (v: 1)
...der1000(6.12.12)withslides.pdf download>
Description: CG Planning Process Enhanced for Order 1000 (6.12.12) with slides
Type: Presentation
Status: FINAL
Contact
06/11/2021 Order 1000 Presentation (6.12.12) (v: 1)
...r1000Presentation(6.12.12).pdf download>
Description: Order 1000 Presentation(6.12.12)
Type: Presentation
Status: FINAL
Contact
06/04/2021 ColumbiaGrid 2012 Transmission Planning Draft System Assessment (v: 1)
...ansmissionPlanningDraftSA.xlsx download>
Description: ColumbiaGrid 2012 Transmission Planning Draft System Assessment
Type: Spreadsheet
Status: DRAFT
03/15/2012 Draft Order 1000 Process Outline (3.5.12) (v: 1)
...1000ProcessOutline(3.5.12).pdf download>
Description: Draft Order 1000 Process Outline (3.5.12)
Type: Document (pdf)
Status: DRAFT
Contact
03/15/2012 Order 1000 Stakeholder Meeting Draft Agenda (3.19.12) (v: 1)
...derMtgDraftAgenda(3.19.12).pdf download>
Description: Order 1000 Stakeholder Meeting Draft Agenda
Type:
Status: FINAL
03/14/2012 Transmission Projects in Base Cases (v: 2)
TxProjinbasecases.pdf download>
Description: Transmission Projects in Base Cases
Type: Spreadsheet
Status: DRAFT
Contact
02/23/2012 Process Proposal for a Dynamic Issues Commercial Forum (v: 1)
...ommercialForum(2022.02.21).pdf download>
Description: Process Proposal for a Dynamic Issues Commercial Forum
Type: Report
Status: DRAFT
Contact
02/17/2012 2012 Update to the 2011 Biennial Transmission Expansion Plan (v: 4)
BP2012webdocument.pdf download>
Description: 2012 Update to the 2011 Biennial Transmission Expansion Plan
Type: Report
Status: DRAFT
02/17/2012 RNP-NWEC Transmission Planning Framework Draft (2.13.12) (v: 1)
...missionPlanningFramework-2.pdf download>
Description: RNP-NWEC Transmission Planning Framework Draft (2.13.12)
Type: Report
Status: DRAFT
02/16/2012 v6 WCEA CEV Intro Slides (2.17.12) (v: 1)
v6WCEACEVintroslides.pdf download>
Description: v6 WCEA CEV Intro Slides (2.17.12)
Type: Presentation
Status: DRAFT
Contact
02/15/2012 Action Items from 2.9.12 (v: 1)
ActionItemsfrom2-9-12CGPM.pdf download>
Description: Action Items from 2.9.12
Type: Minutes
Status: DRAFT
Contact
02/15/2012 Draft Planning Agenda (3.15.12) (v: 1)
aftPlanningAgenda(3-15-12).pdf download>
Description: Planning Agenda 3.15.12
Type: Agenda
Status: DRAFT
02/15/2012 Planning Presentation (2.15.12) (v: 1)
CGBoardPlanning(2.15.12).pdf download>
Description: Planning Presentation (2.15.12)
Type: Presentation
Status: DRAFT
Contact
02/09/2021 Planning Meeting Presentation (v: 1)
PlanningMeeting.pptx download>
Description: Planning Meeting Presentation
Type: Presentation
Status: DRAFT
Contact
02/09/2021 NTTG to CG Presentation (2.9.12) (v: 1)
NTTGtoCG2-9-2012.ppt download>
Description: NTTG to CG Presentation (2.9.12)
Type: Presentation
Status: DRAFT
02/08/2021 Adjacent Circuit Exemptions Disc Paper (v: 1)
...tionsDiscPaper(2021.11.21).doc download>
Description: Adjacent Circuit Exemptions Disc Paper
Type: Document (pdf)
Status: DRAFT
02/08/2021 2012 Study Requests (v: 1)
2012StudyRequests.doc download>
Description: 2012 Study Requests
Type: Document (pdf)
Status: DRAFT
02/06/2021 Table J1: Base Case Summary (v: 1)
Tablej1.pdf download>
Description: Table J1: Base Case Summary
Type: Document (pdf)
Status: DRAFT
Contact
02/06/2021 Mapping Guideline of Table W-1 (1.9.12) (v: 1)
...uidelineofTableW-1_1-9-12.xlsx download>
Description: Mapping Guideline of Table W-1 (1.9.12)
Type: Spreadsheet
Status: DRAFT
01/20/2012 Order 1000 Meeting Agenda (01.23.12) (v: 1)
...000MeetingAgenda(01.23.12).pdf download>
Description: Order 1000 Meeting Agenda (01.23.12)
Type: Agenda
Status: FINAL
Contact
01/19/2012 Public Meeting Notice (1.23.12) (v: 1)
blicMeetingNotice(1.23.12).pdf download>
Description: CG Order 1000 Stakeholder Public Meeting Notice (1.23.12)
Type: Notice
Status: FINAL
Contact
12/09/2021 WIST Agenda( 12.11.11) (v: 1)
DraftAgenda(12.11.11).pdf download>
Description: Draft Agenda( 12.11.11)
Type: Agenda
Status: FINAL
07/27/2011 PEFA (Integrated Agreement) (v: 1)
EFA (Integrated Agreement).pdf download>
Description: The PEFA restated to include the Agreement itself as updated to include corrections, edits, and additions provided for in the First and Second Amendments.
Type: Functional Agreement
Status: FINAL
07/08/2021 2011 System Assessment (10MB file) (v: 1)
2011SAsmall.pdf download>
Description: System Assessment 2011
Type: Report
Status: FINAL
05/31/2011 PNW-CA Feasibility Study (06.02.11) (v: 1)
pnw-ca_feasibility_study.pdf download>
Description: PNW-CA Feasibility Study (06.02.11)
Type: Report
Status: FINAL
05/31/2011 BPA NW-CA Slides TUG BOG (06.02.11) (v: 1)
...TUGBOG_CGPlanMtg2011-06-02.pdf download>
Description: BPA NW-CA Slides TUG BOG (06.02.11)
Type: Report
Status: FINAL
05/31/2011 Brattle WIRES Jobs Study May2011 (06.02.11) (v: 1)
...e-WIRES_Jobs_Study_May2011.pdf download>
Description: Brattle WIRES Jobs Study May2011 (06.02.11)
Type: Report
Status: FINAL
05/31/2011 Draft Planning Agenda (6.2.2022) (v: 1)
raftPlanningAgenda(6-2-11).pdf download>
Description: Planning Agenda 6.2.2022
Type: Agenda
Status: DRAFT
05/27/2011 WECC DRAFT 10-Year Plan Summary (06.03.11) (v: 1)
...DRAFT_10-Year_Plan_Summary.pdf download>
Description: WECC DRAFT 10-Year Plan Summary (06.03.11)
Type: Report
Status: FINAL
Contact
05/27/2011 SCG Update June 2011 (06.03.11) (v: 1)
SCG_Update_June_2011.pdf download>
Description: SCG Update June 2011
Type: Report
Status: FINAL
Contact
05/27/2011 COI Utilization Report (06.02.11) (v: 1)
coi_utilization_report.pdf download>
Description: COI Utilization Report (06.02.11)
Type: Report
Status: FINAL
Contact
05/06/2021 Action Items from 5.5.2021 (v: 1)
ActionItemsfrom5-5-11CGPM.pdf download>
Description: Action Items from 5.5.2021
Type: Minutes
Status: DRAFT
Contact
05/05/2021 ColumbiaGrid 2012 Transmission Plan Draft (v: 1)
...012TransmissionPlanDraft1.xlsx download>
Description: ColumbiaGrid 2012 Transmission Plan Draft
Type: Spreadsheet
Status: DRAFT
Contact
05/05/2021 CG Planning Meeting 5.5.2021 Presentation (v: 1)
CGPlgMtg5-5-11.pdf download>
Type: Presentation
Status: DRAFT
Contact
05/05/2021 Updated PSAST Transmission Expansion Plan Results (presentation) (v: 1)
...TTransExpPlanResults5-4-11.pdf download>
Description: Updated PSAST Transmission Expansion Plan Results (presentation)
Type: Presentation
Status: DRAFT
Contact
05/04/2021 WECC New Transmission (v: 1)
WECCNewTransmission.docx download>
Description: WECC New Transmission
Type: Report
Status: DRAFT
05/04/2021 Table 1 CG 10 Year Plan (v: 1)
Table1CG10YearPlan.xlsx download>
Description: Table 1 CG 10 Year Plan
Type: Spreadsheet
Status: DRAFT
Contact
05/02/2022 Draft Planning Agenda (5.5.11) (v: 2)
raftPlanningAgenda(5-5-11).pdf download>
Description: Draft Planning Agenda (5.5.11)
Type: Agenda
Status: DRAFT
04/19/2011 Transmission Planning Update (4.20.11) (v: 1)
...TransmissionPlanningUpdate.pdf download>
Description: 4-20-2011 Transmission Planning Update
Type: Presentation
Status: DRAFT
Contact
03/28/2011 DTC TF (29Mar2011) (v: 1)
DTCTF.WIST(29Mar2011).pdf download>
Description: DTC TF WIST Call (29 Mar 2021)
Type: Presentation
Status: FINAL
03/28/2011 WIST Agenda (3.29.11) (v: 1)
WISTDraftAgenda(3.29.11).pdf download>
Description: WIST Draft Agenda (3.29.11)
Type: Agenda
Status: FINAL
03/16/2011 DTC TF Phase 1 Report (3.16.11) (v: 1)
DTCTFPhaseFullReport031611.pdf download>
Description: The Dynamic Transfer Capability Task Force has completed a report documenting Phase 1 of its work to develop a methodology for determining dynamic transfer capability limits. If you have any questions or comments, please refer them to Marv Landauer (email).
Type: Report
Status: DRAFT
Contact
03/16/2011 Wind Sheds (v: 1)
wind_sheds.pdf download>
Description: Wind Sheds
Type: Map
Status: DRAFT
Contact
03/16/2011 CG Planning Mtg WRS1-1 (3.17.11) (v: 1)
CGPlgMtgWRS1-1 17Mar11.pdf download>
Description: 2011 WECC Reliability Subcommittee Report
Type: Presentation
Status: DRAFT
Contact
03/16/2011 2011 Study Requests (v: 1)
2011StudyRequests1.doc download>
Description: 2011 Study Requests
Type: Document (pdf)
Status: DRAFT
Contact
03/16/2011 Table 5 Projects in System Assessment (v: 1)
Table5ProjinSA.xlsx download>
Description: Table 5 Projects in System Assessment
Type: Spreadsheet
Status: DRAFT
Contact
03/16/2011 Table 1 Ten Year Plan (v: 1)
Table1TenYearPlan.xlsx download>
Description: Table 1 Ten Year Plan
Type: Spreadsheet
Status: DRAFT
Contact
03/16/2011 Centralia Study Status 3.18.11 (v: 1)
...traliaStudyStatus3-18-2011.pdf download>
Description: Centralia Study Status 3.18.11
Type: Presentation
Status: DRAFT
Contact
03/09/2021 Draft Planning Agenda (3.17.11) (v: 1)
aftPlanningAgenda(3-17-11).pdf download>
Description: Planning Agenda (3.17.11)
Type: Agenda
Status: DRAFT
03/09/2021 Action Items 1.27.11 (v: 1)
ActionItemsfrom1-27-11CGPM.pdf download>
Description: Action Items 1.27.11
Type: Minutes
Status: DRAFT
Contact
03/07/2021 TCRM Tables (v: 1)
request access > login >
Description: TCRM Tables
Type: Spreadsheet
Status: DRAFT
Contact
02/07/2021 PSAST Action Items (v: 1)
PSAST2-3-11ActionItems.pdf download>
Description: PSAST Action Items
Type: Minutes
Status: DRAFT
Contact
02/07/2021 PSAST Agenda (2.18.11) (v: 1)
PSAST_Feb18_Agenda.pdf download>
Description: PSAST Agenda (2.18.11)
Type: Agenda
Status: DRAFT
Contact
01/11/2021 NWE Wind Profile 2009 (v: 1)
NWEWindProfile2009.xls download>
Description: NWE Wind Profile 2009
Type: Spreadsheet
Status: DRAFT
01/10/2021 PSAST Agenda (2.3.11) (v: 1)
PSAST_Feb3_Agenda.doc download>
Description: PSAST Agenda (2.3.11)
Type: Agenda
Status: DRAFT
Contact
12/08/2021 PSE Attachment K PSAST Mtg 2010 (v: 1)
PSEAttKPSATMtg(12-9-10).pdf download>
Description: PSE Attachment K PSAST Mtg 2010
Type: Presentation
Status: DRAFT
12/06/2021 WIST Agenda (12.8.10) (v: 1)
WIST12-8-10DraftAgenda.pdf download>
Description: WIST Agenda 12.8.10
Type: Agenda
Status: DRAFT
12/03/2021 Action Items from 12.2.10 (v: 1)
ActionItemsfrom12-2-10CGPM.pdf download>
Description: Action Items from 12.2.10
Type: Minutes
Status: DRAFT
Contact
12/03/2021 2011 Study Requests (v: 1)
2011StudyRequests.doc download>
Description: 2011 Study Requests
Type: Document (pdf)
Status: DRAFT
Contact
12/03/2021 Draft Planning Agenda (1.27.11) (v: 1)
aftPlanningAgenda(1-27-11).pdf download>
Description: Planning Agenda (1.27.11)
Type: Agenda
Status: DRAFT
12/02/2022 Future work recommendations Local vs Remote from WIST report (v: 1)
...nsLocalvsremoteWISTReport.docx download>
Description: Future work recommendations Local vs Remote from WIST report
Type: Report
Status: DRAFT
Contact
12/01/2022 Adjacent Circuit Criteria (v: 1)
AdjCir12-9-10.pdf download>
Description: Adjacent Circuit Criteria
Type: Presentation
Status: DRAFT
Contact
12/01/2022 Centralia Shutdown Study Plan (v: 1)
CentraliaShutdownStudyPlan.pdf download>
Description: Centralia Shutdown Study Plan
Type: Report
Status: DRAFT
Contact
12/01/2022 WECC 10-Year Plan Update (v: 1)
WECC10yearPlanUpdate.pdf download>
Description: WECC 10-Year Plan Update
Type: Report
Status: DRAFT
Contact
12/01/2022 CAISO Wind Ramp Plots 2009 spreadsheet (v: 1)
CAISO.WindRampPlots2009.xls download>
Description: CAISO Wind Ramp Plots 2009 spreadsheet
Type: Spreadsheet
Status: DRAFT
12/01/2022 PSAST Agenda (12.9.10) (v: 1)
PSAST_Dec9_Agenda.pdf download>
Description: PSAST Agenda 12.9.10
Type: Agenda
Status: DRAFT
Contact
11/17/2010 CIRED Flicker Objectives (v: 1)
CIRED2009_0755_Paper.pdf download>
Description: CIRED Flicker Objectives
Type: Document (pdf)
Status: DRAFT
11/15/2010 2009 BPA Wind Ramp Plots (v: 1)
RAFT-2009BPA-WindRampPlots.xls download>
Description: 2009 BPA Wind Ramp Plots
Type: Spreadsheet
Status: DRAFT
11/15/2010 PacifiCorp Wind Variability Graph for 2010 (v: 1)
..._Wind_Variability_PAC_2010.pdf download>
Description: PacifiCorp Wind Variability Graph for 2010
Type: Charts
Status: DRAFT
11/15/2010 CAISO Wind Profile 2009 (v: 1)
CAISOWindProfile2009.xls download>
Description: CAISO Wind Profile 2009
Type: Spreadsheet
Status: DRAFT
11/12/2021 Action Items from CG Planning Mtg 11.4.10 (v: 1)
ActionItemsfrom11-4-10CGPM.pdf download>
Description: Action Items from CG Planning Mtg 11.4.10
Type: Minutes
Status: DRAFT
Contact
11/11/2021 PSE Transmission Customer Meeting Invitation (12.9.10) (v: 1)
...erMeetingInvitation12-9-10.pdf download>
Description: PSE Transmission Customer Meeting Invitation (12.9.10)
Type: Notice
Status: DRAFT
11/10/2021 BPA Wind Profile 2009 (32MB file) (v: 1)
BPAWindProfile2009.xls download>
Description: BPA Wind Profile 2009
Type: Spreadsheet
Status: DRAFT
11/09/2021 Draft Planning Agenda (12.2.10) (v: 1)
aftPlanningAgenda(12-2-10).pdf download>
Description: Planning Mtg Agenda (12.2.10
Type: Agenda
Status: DRAFT
11/04/2021 Planning Meeting presentation (Marv) (v: 1)
G Plg Mtg Exp Plg 11-4-10.pptx download>
Description: Planning Meeting presentation (Marv)
Type: Presentation
Status: DRAFT
Contact
11/04/2021 Ten Year Plan (v: 1)
TenYearPlan.xlsx download>
Description: Ten Year Plan
Type: Spreadsheet
Status: DRAFT
Contact
11/03/2022 WECC 10 Year Plan Update (v: 1)
WECC10yearPlanUpdate.pdf download>
Description: WECC 10 Year Plan Update
Type: Presentation
Status: DRAFT
11/03/2022 Puget Sound Transmission Expansion Plan Status 11.4.10 (v: 1)
...ExpansionPlanStatus11-4-10.pdf download>
Description: Puget Sound Transmission Expansion Plan Status 11.4.10
Type: Presentation
Status: DRAFT
Contact
11/03/2022 Sammamish-Lakeside-Talbot Sensitivity (PSAST) (v: 1)
...e-TalbotSensitivity(PSAST).pdf download>
Description: Sammamish-Lakeside-Talbot Sensitivity (PSAST)
Type: Presentation
Status: DRAFT
Contact
11/03/2022 Puget Sound Generation Levels (v: 1)
PugetSoundGenerationLevels.pdf download>
Description: Puget Sound Generation Levels
Type: Presentation
Status: DRAFT
Contact
11/03/2022 Draft Planning Agenda (10.19.10) (v: 3)
...ftPlanningAgenda(11-4-10)1.pdf download>
Description: Draft Planning Agenda (10.19.10)
Type: Agenda
Status: DRAFT
Contact
11/03/2022 Walla Walla Area Wind Generation 10.29.10 (v: 1)
...AreaWindGeneration10-29-10.pdf download>
Description: Walla Walla Area Wind Generation 10.29.10
Type: Map
Status: DRAFT
11/03/2022 CAISO Technical Appendices for Renewable Integration Studies (v: 1)
TechnicalAppendixfor20%.pdf download>
Description: CAISO Technical Appendices for Renewable Integration Studies
Type: Presentation
Status: DRAFT
11/03/2022 CAISOIntegration of Renewable Resources (v: 1)
ISOstudyofthe20%renewables.pdf download>
Description: CAISOIntegration of Renewable Resources
Type: Presentation
Status: DRAFT
11/03/2022 Presentation on CAISO intermittent dynamic transfer capability (v: 1)
CAISO-DTS-COI-WOR.pdf download>
Description: Presentation on CAISO intermittent dynamic transfer capability
Type: Presentation
Status: DRAFT
10/29/2010 BPA Dynamic Transfer Limit Study Methodology (v: 1)
DTLS_methodology_F.pdf download>
Description: DTLS Methodology F Presentation
Type: Presentation
Status: DRAFT
10/29/2010 Idaho DTC Study Slides (v: 1)
IPCO-DTLStudy-Background.pdf download>
Description: Idaho DTC Study Slides
Type: Presentation
Status: DRAFT
10/26/2010 BPA CG WIST Review of Dynamic Transfer Capability Studies (v: 1)
WIST100520.pdf download>
Description: WIST 5.20.10 Presentation
Type: Presentation
Status: DRAFT
10/12/2021 Ca DTL Final Proposal (10.14.10) (v: 1)
Ca DTL Final Proposal.pdf download>
Description: Ca DTL Final Proposal
Type: Presentation
Status: FINAL
10/12/2021 CaISO DTL(10.14.10) (v: 1)
CaISO DTL.pdf download>
Description: CaISO DTL
Type: Presentation
Status: FINAL
09/27/2010 Action Items - Nomo Strat Session (8.23.10) (v: 1)
...tratSession(v23August2010).zip download>
Description: Action Items - Nomo Strat Session (8.23.10)
Type: Spreadsheet
Status: DRAFT
Contact
09/27/2010 Nomogram Strategy Session Agenda (10.01.10) (v: 1)
Agenda(1October2010).doc download>
Description: Nomogram Strategy Session Agenda (10.01.10)
Type: Agenda
Status: DRAFT
Contact
09/22/2010 PSAST Rerun TCRM Results (Zip file 6MB) (v: 1)
request access > login >
Description: PSAST Rerun TCRM Results
Type: Spreadsheet
Status: DRAFT
Contact
09/09/2021 BPA ATC Results 9.9.10 Tier 1 (v: 1)
request access > login >
Description: BPA ATC Results 9.9.10 Tier 1
Type: Spreadsheet
Status: DRAFT
08/27/2010 PSAST Agenda (9.28.10) (v: 1)
PSAST_Sept28_Agenda.pdf download>
Description: PSAST Agenda 9.28.10
Type: Agenda
Status: DRAFT
Contact
07/29/2010 Combined Winter 2010 S2N Heavy and Light EL-MO oos (v: 1)
request access > login >
Description: Combined Winter 2010 S2N Heavy and Light EL-MO oos
Type: Spreadsheet
Status: DRAFT
Contact
07/29/2010 PSA Net Load Definitions (v: 1)
request access > login >
Description: PSA Net Load Definitions
Type: Spreadsheet
Status: DRAFT
Contact
07/29/2010 PSE Gen vs Net Area Load (v: 1)
request access > login >
Description: PSE Gen vs Net Area Load
Type: Spreadsheet
Status: DRAFT
Contact
07/29/2010 Action Items & Points of Information from Nomo Strategy Session (7.20.10) (v: 1)
request access > login >
Description: Action Items & Points of Information from Nomo Strategy Session (7.20.10)
Type:
Status: DRAFT
Contact
07/29/2010 PSAST Action Items (v: 1)
PSAST8-24-10ActionItems.pdf download>
Description: PSAST Action Items
Type: Minutes
Status: DRAFT
Contact
07/29/2010 PSAST Agenda (8.24.10) (v: 1)
PSAST_Aug24_Agenda.pdf download>
Description: PSAST Agenda 08.24.10
Type: Agenda
Status: DRAFT
Contact
07/29/2010 WIST Notes from 7.7.201 Mtg (v: 1)
raftNotesWISTMeeting7-7-10.doc download>
Description: WIST Notes from 7.7.201 Mtg
Type: Minutes
Status: DRAFT
07/23/2010 Puget Sound Area Generation Modeling Guideline 6.23.10 (v: 2)
request access > login >
Description: Puget Sound Area Generation Modeling Guideline 6.23.10
Type: Report
Status: DRAFT
Contact
07/19/2010 White Paper ST Nomogram Improvement v19 (7.20.10) (v: 1)
confidentiality agreement required >
Description: White Paper ST Nomogram Improvement v19 (7.20.10)
Type: Document (pdf)
Status: DRAFT
Contact
07/19/2010 Ordered Discussion Cases v19 (7.20.10) (v: 1)
confidentiality agreement required >
Description: Ordered Discussion Cases v19 (7.20.10)
Type: Document (pdf)
Status: FINAL
Contact
07/19/2010 Puget Sound Nomogram Strategy Session Draft Agenda (7.20.10) (v: 1)
...undNomogramStrategySession.pdf download>
Description: Puget Sound Nomogram Strategy Session Draft Agenda (7.20.10)
Type: Agenda
Status: FINAL
Contact
07/14/2010 PSAST Agenda (7.28.10) (v: 1)
PSAST_July28_Agenda.pdf download>
Description: PSAST Agenda 7.28.10
Type: Agenda
Status: DRAFT
Contact
07/08/2021 CEC Wind Impact on California (v: 1)
..._Wind_Impact_on_California.pdf download>
Description: CEC Wind Impact on California
Type: Report
Status: DRAFT
07/08/2021 NERC Dynamic Transfer Guidelines (v: 1)
...ynamic_Transfer_Guidelines.doc download>
Description: NERC Dynamic Transfer Guidelines
Type: Report
Status: DRAFT
07/08/2021 WIST Agenda (9.2.10) (v: 1)
WIST9-2-10DraftAgenda.pdf download>
Description: WIST 9.2.10 Agenda
Type: Agenda
Status: DRAFT
07/06/2021 WIST Report Presentation (v: 1)
WISTReport6-7-10.pdf download>
Description: WIST Report Presentation
Type: Presentation
Status: DRAFT
Contact
07/06/2021 KEMA sees opportunites for storage applications in high-penetration renewables (v: 1)
...23 KEMA CA ISO study FINAL.pdf download>
Description: KEMA sees opportunites for storage applications in high-penetration renewables
Type: Report
Status: DRAFT
07/06/2021 Research Evaluation of Wind Generation, Solar & Storage Impact on CA Grid (v: 1)
CEC-500-2010-010.pdf download>
Description: Research Evaluation of Wind Generation, Solar & Storage Impact on CA Grid
Type: Report
Status: DRAFT
07/06/2021 Challenges of Wind Integration (v: 1)
...ind_Integration_6.15.10[1].doc download>
Description: Challenges of Wind Integration
Type: Report
Status: DRAFT
07/06/2021 IS Dynamic Transfer Guidelines (v: 1)
...c_Transfer_Guidelines_0526.doc download>
Description: IS Dynamic Transfer Guidelines
Type: Report
Status: DRAFT
07/01/2022 Dynamic Scheduling Final Report (v: 1)
namicSchedulingFinalReport.pdf download>
Description: Dynamic Scheduling Final Report
Type: Report
Status: DRAFT
06/29/2010 PSAST 6.23.10 Action Items (v: 1)
PSAST6-23-10ActionItems.doc download>
Description: PSAST 6.23.10 Action Items
Type: Minutes
Status: DRAFT
Contact
06/29/2010 Powerex Comments on Dynamic Transfer Limits Methodology (v: 1)
PWX-BPAreDSS28June2010.pdf download>
Description: Powerex Comments on Dynamic Transfer Limits Methodology
Type: Comments
Status: DRAFT
06/29/2010 WIST Agenda (7.7.10) (v: 1)
WIST5-20-10DraftAgenda1.pdf download>
Description: WIST Agenda 7.7.10
Type: Agenda
Status: DRAFT
06/25/2010 Action Items from 6.24.10 (v: 1)
ctionItemsfrom6-24-10CGPM.docx download>
Description: Action Items from 6.24.10
Type: Minutes
Status: DRAFT
Contact
06/22/2010 Morgan Lewis - Energy LF FERC Proposed Rule on Transmission Planning & Cost Allocation (v: 1)
...issionPlanning_18jun10 (2).pdf download>
Description: Morgan Lewis - Energy LF FERC Proposed Rule on Transmission Planning & Cost Allocation
Type: Letter
Status: DRAFT
06/22/2010 Draft SCG Committed Potential Map (v: 1)
...mmitted_PotentialMap-ver41.pdf download>
Description: Draft SCG Committed Potential Map
Type: Map
Status: DRAFT
06/22/2010 Footnote B (v: 1)
Footnoteb.pdf download>
Description: Footnote B
Type: Document (pdf)
Status: DRAFT
Contact
06/21/2010 PSAST Agenda (6.23.10) (v: 1)
PSAST_June23_Agenda.doc download>
Description: PSAST Agenda
Type: Agenda
Status: DRAFT
Contact
06/21/2010 Action Items from 5.14.10 (v: 1)
PSAST5-14-10ActionItems(2).pdf download>
Description: Action Items from 5.14.10
Type: Minutes
Status: DRAFT
Contact
06/18/2010 Draft Planning Agenda (6.24.10) (v: 2)
...ftPlanningAgenda(6-24-10)1.pdf download>
Description: Draft Planning Agenda (6.24.10)
Type: Agenda
Status: DRAFT
Contact
06/18/2010 Generation Modeling Guidelines (v: 1)
...onModelingGuideline6-18-10.doc download>
Type: Report
Status: DRAFT
Contact
06/16/2010 Planning Presentation (v: 1)
PlanningUpdate (06.16.10).pdf download>
Description: Planning Presentation 6.16.10
Type: Presentation
Status: DRAFT
Contact
06/09/2021 WIST Notes from 5.20.10 Mtg (v: 1)
...Draft-NotesWISTMeeting5.20.doc download>
Description: WIST Notes from 5.20.10 Mtg
Type: Minutes
Status: DRAFT
05/27/2010 Power System Paradigm Shift (v: 1)
WIST5-20-10.ppt download>
Description: WIST Presentation (5.20.10)
Type: Presentation
Status: DRAFT
05/20/2010 Wind Initiatives Matrix (v: 1)
WindInitiativesMatrix1.xls download>
Description: Wind Initiatives Matrix
Type: Spreadsheet
Status: DRAFT
05/19/2010 Path 3 Northwest to BC Thermal Upgrade Project Phase 1 Path Rating Report (v: 1)
request access > login >
Description: Path 3 Northwest to BC Thermal Upgrade Project Phase 1 Path Rating Report
Type: Report
Status: DRAFT
05/19/2010 Comprehensive Progress Report for Path 3 NW - BC (v: 1)
request access > login >
Description: Comprehensive Progress Report for Path 3 NW - BC
Type: Report
Status: DRAFT
05/18/2010 WIST Agenda (5.20.10) (v: 1)
WIST5-20-10DraftAgenda.pdf download>
Description: Agenda WIST; WIST Agenda (5.20.10);
Type: Agenda
Status: DRAFT
05/17/2010 18hw1-s SeedCase (v: 1)
request access > login >
Description: 18hw1-s SeedCase
Type: Base Case
Status: DRAFT
05/14/2010 Study Results Review (v: 1)
tudyResultsReview_5-14-10.pptx download>
Description: Study Results Review
Type: Presentation
Status: DRAFT
Contact
05/13/2010 Powerex Comments on PSAST Plan (v: 1)
...fMiller)rePSAExpPln5.12.10.doc download>
Description: Powerex Comments on PSAST Plan
Type: Comments
Status: DRAFT
05/13/2010 PSAST Agenda (5.14.10) (v: 2)
PSAST_May14_Agenda_r1.pdf download>
Description: PSAST Agenda (5.14.10)
Type: Agenda
Status: DRAFT
Contact
05/12/2021 BPA/CG Meeting Minutes 4.23.10 (v: 1)
...ingMinutes_04-23-10_v5 (2).doc download>
Description: BPA/CG Meeting Minutes 4.23.10
Type: Minutes
Status: DRAFT
05/11/2021 BPA Cost Estimate Request (v: 1)
BPACostEstimateRequest.pdf download>
Description: BPA Cost Estimate Request
Type: Document (pdf)
Status: DRAFT
Contact
05/11/2021 PSE Cost Estimate Request (v: 1)
PSECostEstimateRequest.pdf download>
Description: PSE Cost Estimate Request
Type: Document (pdf)
Status: DRAFT
Contact
05/11/2021 SCL Cost Estimate Request (v: 1)
SCLCostEstimateRequest.pdf download>
Description: SCL Cost Estimate Request
Type: Document (pdf)
Status: DRAFT
Contact
05/11/2021 2010 Biennial Expansion Plan Update (v: 1)
2010BiennialPlan2.pdf download>
Description: 2010 Biennial Expansion Plan Update
Type: Report
Status: FINAL
05/04/2021 PSAST Action Items (5.14.10) (v: 1)
...ea Study Team Action Items.doc download>
Description: PSAST Action Items (5.14.10)
Type: Minutes
Status: DRAFT
Contact
05/04/2021 PSAST Agenda (5.19.10) (v: 1)
PSAST_May19_Agenda.pdf download>
Description: PSAST Agenda (5.19.10)
Type: Agenda
Status: FINAL
Contact
04/22/2010 Action Items from 4.20.10 Planning Mtg (v: 1)
ActionItemsfrom4-20-10.pdf download>
Description: Action Items from 4.20.10 Planning Mtg
Type: Notes
Status: DRAFT
Contact
04/19/2010 Comments on 5 & 10 Year Cases (v: 1)
CommentsMade.pdf download>
Description: Comments on 5 & 10 Year Cases
Type: Comments
Status: DRAFT
Contact
04/09/2021 WIST Update February 2010 (v: 1)
WIT_Update_Feb_2010.pdf download>
Description: WIST Update February 2010
Type: Notes
Status: DRAFT
04/09/2021 WIST 2.18.10 Notes (v: 1)
WIST2-18-10Notes.doc download>
Description: WIST 2.18.10 Notes
Type: Notes
Status: DRAFT
04/09/2021 Dynamic Transfer Limits Map (v: 1)
dyn_transfer_limits map.pdf download>
Description: Dynamic Transfer Limits Map
Type: Report
Status: DRAFT
04/09/2021 DTLS Results (v: 1)
DTLS_results.pdf download>
Description: DTLS Results
Type: Report
Status: DRAFT
04/09/2021 DTLS Methodology F (v: 1)
DTLS_methodology_F1.pdf download>
Description: DTLS Methodology F
Type: Report
Status: DRAFT
04/07/2021 TEPPC Northwest Additional Wind Cases (4.6.10) (v: 1)
PPCNWAddWindCases(4.6.10).docx download>
Description: TEPPC Northwest Additional Wind Cases (4.6.10)
Type: Report
Status: DRAFT
04/07/2021 Summary of 2009 WIST Wind Analysis (4.6.10) (v: 1)
...9WISTWindAnalysis(4.6.10).docx download>
Description: Summary of 2009 WIST Wind Analysis (4.6.10)
Type: Report
Status: DRAFT
04/07/2021 Summary Western Wind Solar Integration Study RH (v: 1)
...indSolarIntegrationStudyRH.doc download>
Description: Summary Western Wind Solar Integration Study RH
Type: Report
Status: DRAFT
04/07/2021 WIST Report Gibson Sections (4.6.10) (v: 1)
STreptGibsonsections6Apr10.doc download>
Description: WIST Report Gibson Sections (4.6.10)
Type: Report
Status: DRAFT
04/06/2021 BPA comments on Puget Sound Area Transmission Expansion Plan (v: 1)
...3-23-2010_reviewShortTPPv1.pdf download>
Description: BPA comments on Puget Sound Area Transmission Expansion Plan
Type: Comments
Status: DRAFT
04/05/2021 PSAST Agenda (4.8.10) (v: 1)
PSAST_April8_Agenda_r1.pdf download>
Description: PSAST Agenda (4.8.10)
Type: Agenda
Status: DRAFT
Contact
04/02/2022 Puget Sound Area Transmission Plan Schedule & Cost Estimate 4.2.10 (v: 1)
...nSceduleCostEstimate4-2-10.doc download>
Description: Puget Sound Area Transmission Plan Schedule & Cost Estimate 4.2.10
Type: Report
Status: DRAFT
Contact
04/02/2022 Puget Sound Area Study Team Action Items (v: 1)
...ndAreaStudyTeamActionItems.doc download>
Description: Puget Sound Area Study Team Action Items
Type: Minutes
Status: DRAFT
Contact
04/02/2022 Addendum to NMC Report (v: 1)
request access > login >
Description: Addendum to NMC Report
Type: Report
Status: DRAFT
Contact
04/02/2022 Wind Integration Study Team 2021-09-10 (v: 1)
...rationStudyTeam2009-09-101.doc download>
Description: Wind Integration Study Team 2021-09-10
Type:
Status: DRAFT
04/02/2022 Simple Integration Model Studies (v: 1)
...pleIntegrationModelStudies.pdf download>
Description: Simple Integration Model Studies
Type:
Status: DRAFT
04/02/2022 Latest LBNL-WREZ Work (v: 1)
LatestLBNL-WREZwork.docx download>
Description: Latest LBNL-WREZ Work
Type: Report
Status: DRAFT
03/31/2010 Figures 4-10 (v: 1)
Figures 4-10.ppt download>
Description: Figures 4-10
Type: Presentation
Status: DRAFT
03/31/2010 WREZ Report (v: 1)
WREZReport.doc download>
Description: WREZ Report
Type: Report
Status: DRAFT
03/31/2010 WIST Report Gibson Sections (3.24.10) (v: 1)
...TreptGibsonsections24Mar10.doc download>
Description: WIST Report Gibson Sections (3.24.10)
Type: Report
Status: DRAFT
03/31/2010 WIST Report Outline (v: 1)
WISTReportOutline1.pdf download>
Description: WIST Report Outline
Type: Report
Status: DRAFT
03/31/2010 Summary Western Wind Solar Integration Study (v: 1)
...indSolarIntegrationStudyRH.doc download>
Description: Summary Western Wind Solar Integration Study
Type: Report
Status: DRAFT
03/23/2010 Puget Sound Area Expansion Plan Supporting Doc (Zipped File) (v: 1)
request access > login >
Description: Puget Sound Area Expansion Plan Supporting Doc (Zipped File)
Type: Spreadsheet
Status: DRAFT
Contact
03/23/2010 Puget Sound Area Expansion Plan 3.23.10 (v: 1)
request access > login >
Description: Puget Sound Area Expansion Plan 3.23.10
Type: Report
Status: DRAFT
Contact
03/18/2010 Action Items (3.2.10) (v: 1)
ActionItemsfrom3-2-10CGPM.pdf download>
Description: Action Items (3.2.10)
Type: Minutes
Status: DRAFT
Contact
03/04/2021 Draft Planning Agenda (4.20.10) (v: 1)
aftPlanningAgenda(4-20-10).pdf download>
Description: Planning Agenda (4.20.10)
Type: Agenda
Status: DRAFT
03/03/2022 WIST Report Outline (v: 1)
WISTReportOutline.pdf download>
Description: WIST Report Outline
Type: Report
Status: DRAFT
Contact
03/03/2022 Wind Analysis Report - Draft (v: 1)
WINDANALYSISREPORTDRAFT(2).pdf download>
Description: Wind Analysis Report - Draft
Type: Report
Status: DRAFT
Contact
03/02/2022 Lancaster Loop - Avista Presentation (v: 1)
Lancaster_Loop_in.ppt download>
Description: Lancaster Loop - Avista Presentation
Type: Presentation
Status: DRAFT
03/02/2022 Draft Planning Agenda (1.25.10) (v: 1)
StudyPlan25Jan10(2).pdf download>
Description: Study Plan 1.25.10
Type: Agenda
Status: DRAFT
02/26/2010 WIST Agenda (3.3.10) (v: 1)
...eport Team Agenda (3-3-10).pdf download>
Description: WIST Report Team Agenda (3-3-10)
Type: Agenda
Status: FINAL
02/26/2010 SPSC Miller Presentation - SCG (1.29.10) (v: 1)
...rPresentationonSCG-1-29-10.pdf download>
Description: SPSC Miller Presentation - SCG (1.29.10)
Type: Presentation
Status: DRAFT
Contact
02/26/2010 Puget Sound Reinforcements (2.17.10) (v: 1)
...SoundReinforcements2-17-10.pdf download>
Description: Puget Sound Reinforcements (2.17.10)
Type: Presentation
Status: DRAFT
Contact
02/22/2010 NREL Wind Presentation (v: 1)
Wind-NREL_presentation.pdf download>
Description: NREL Wind Presentation
Type: Presentation
Status: DRAFT
02/19/2010 Resolution for Adoption of Plan Update (020910) (v: 1)
...AdoptionofPlanUpdate020910.doc download>
Description: Resolution for Adoption of Plan Update (020910)
Type: Corporate Doc
Status: FINAL
Contact
02/17/2010 TEPPC 2009 Study Program Results Report (v: 1)
...udy-Program-Results-Report.pdf download>
Description: TEPPC 2009 Study Program Results Report
Type: Report
Status: DRAFT
02/12/2021 Dynamic Transfer Study (v: 1)
Ppt0000005.pdf download>
Description: Dynamic Transfer Study
Type: Presentation
Status: FINAL
02/11/2021 WIST Agenda (2.18.10) (v: 1)
WIST2-18-10DraftAgenda.pdf download>
Description: WIST Agenda (2.18.10)
Type: Agenda
Status: DRAFT
Contact
02/10/2021 Powertech Summary of 2008 DS Lim Study (v: 1)
...echsummaryof2008DSLimStudy.pdf download>
Description: Powertech Summary of 2008 DS Lim Study
Type: Presentation
Status: DRAFT
02/09/2021 WIST Meeting Notes (12.17.09) (v: 1)
WIST12-17-09Notes.pdf download>
Description: WIST Meeting Notes (12.17.09)
Type: Minutes
Status: DRAFT
02/03/2022 Puget Soung Area Expansion Plan (v: 1)
...ansionPlan1-2010-Version3a.doc download>
Type: Report
Status: DRAFT
Contact
01/27/2010 Draft Action Items from 1.26.10 (v: 1)
ActionItemsfrom1-26-10CGPM.pdf download>
Description: Draft Action Items from 1.26.10
Type: Minutes
Status: DRAFT
Contact
01/27/2010 Draft Planning Agenda (v: 1)
raftPlanningAgenda(3-2-10).pdf download>
Description: Draft Planning Agenda
Type: Agenda
Status: DRAFT
Contact
01/26/2010 PSAST Agenda (2.04.10) (v: 1)
PSAST_Feb4th_2010_Agenda.pdf download>
Description: PSAST Agenda Feb. 4th, 2010
Type: Agenda
Status: FINAL
Contact
01/25/2010 Draft Planning Agenda (v: 1)
aftPlanningAgenda(1-26-10).pdf download>
Description: Draft Planning Agenda;
Type: Agenda
Status: DRAFT
Contact
12/23/2009 PSAST TCRM Phase 1 Report (v: 1)
...RM_Phase1Report_FinalDraft.pdf download>
Description: Puget Sound Area Study Team Report
Type: Report
Status: FINAL
Contact
12/22/2009 Puget Sound Area StudyTeam Action Items (12.15.09)(2) (v: 1)
...amActionItems(12.15.09)(2).pdf download>
Description: Puget Sound Area Study Team Action Items(12.15.09)(2)
Type: Minutes
Status: FINAL
Contact
12/17/2009 Dynamic Transfer Limits Study Presentation (v: 1)
...Limits Study WIST 12-17-09.ppt download>
Description: Dynamic Transfer Limits Study Presentation
Type: Presentation
Status: DRAFT
12/16/2009 PEFASecond Amendment (12.16.09) (v: 1)
...ndAmendment_sign(12.16.09).pdf download>
Description: PEFA Second Amendment, signed copy (12.16.09)
Type: Functional Agreement
Status: FINAL
Contact
12/14/2009 Cal ISO Dyn WP (v: 1)
CaISO Dyn WP.pdf download>
Description: Cal ISO Dyn WP
Type: Document (pdf)
Status: DRAFT
12/14/2009 Cal ISO Dyn Present (v: 1)
CaISO Dyn Present.pdf download>
Description: Cal ISO Dyn Present
Type: Document (pdf)
Status: DRAFT
12/14/2009 Cal ISO Dyn Agenda Abstract (v: 1)
CaISO Dyn Agenda Abstract.pdf download>
Description: Cal ISO Dyn Agenda Abstract
Type: Agenda
Status: DRAFT
12/11/2021 PSAST_TCRM_Phase1Report_Draft 5 (11.24.09) (v: Draft 5)
request access > login >
Description: PSAST TCRM Phase1 Report Draft 5
Type: Report
Status: DRAFT
Contact
12/11/2021 Phase 2 Primary Outage (v: 1)
Phase2PrimaryOutageList.xls download>
Description: Phase 2 Primary Outage
Type: Spreadsheet
Status: DRAFT
Contact
12/11/2021 PSAST Agenda (12.15.09) (v: 1)
PSAST_Dec15th_2009_Agenda.pdf download>
Description: PSAST Agenda (12.15.09)
Type: Agenda
Status: DRAFT
Contact
12/11/2021 Action Items 12.9.09 (v: 1)
ActionItemsfrom12-9-09CGPM.pdf download>
Description: Action Items 12.9.09
Type: Minutes
Status: DRAFT
Contact
12/11/2021 Cross Cascades ST Notes (12.10.09) (v: 1)
...sCascadesSTnotes(12-10-09).pdf download>
Description: Cross Cascades ST Notes (12.10.09)
Type: Notes
Status: DRAFT
Contact
12/10/2021 WIST Agenda (12.10.09) (v: 1)
WIST12-17-09DraftAgenda.pdf download>
Description: WIST Agenda (12.10.09);
Type: Agenda
Status: DRAFT
12/09/2021 PSE Attachment K Presentation (v: 1)
Att K PSAT Meeting 2009.pdf download>
Description: PSE Attachment K Presentation
Type: Presentation
Status: DRAFT
12/08/2021 TEPPC Study Update ColumbiaGrid (12.09.09) (v: 1)
... Update ColumbiaGrid Dec 9.pdf download>
Description: TEPPC Study Update ColumbiaGrid Dec 9
Type: Presentation
Status: FINAL
12/08/2021 Ten Year Plan Cutout from Biennial Plan Update (v: 1)
TenYearPlan.pdf download>
Description: Ten Year Plan Cutout from Biennial Plan Update
Type: Document (pdf)
Status: DRAFT
Contact
12/07/2021 Cross Cascades Agenda (12.10.09) (v: 1)
AgendaWoCST(12.10.09).pdf download>
Description: Cross Cascades Study Team Agenda
Type: Agenda
Status: DRAFT
12/07/2021 Cross Cascades Agenda (12.09.09) (v: 1)
AgendaWoCST(12.10.09).pdf download>
Description: Cross Cascades Agenda
Type: Agenda
Status: DRAFT
11/25/2009 PSE Attachment K (v: 1)
PSE-AttKmtg.pdf download>
Description: PSE Attachment K
Type: Notice
Status: DRAFT
11/24/2009 FERC 890 ColumbiaGrid Comments Planning (11-23-09) (v: 1)
...omments_Planning(11-23-09).pdf download>
Description: FERC 890 Filing - ColumbiaGrid Comments Planning (11-23-09)
Type: Filing
Status: FINAL
Contact
11/12/2021 WIST Meeting Minutes (10.15.09) (v: 1)
WISTminutes(2021-10-15).pdf download>
Description: WIST Meeting Minutes (10.15.09)
Type: Minutes
Status: DRAFT
11/09/2021 PSAST Agenda (11.12.09) (v: 1)
PSASTAgenda(11.12.09).pdf download>
Description: PSAST Agenda (11.12.09)
Type: Agenda
Status: DRAFT
Contact
10/29/2009 Action Items from CG Planning Mtg (10.27.09) (v: 1)
ctionItemsfrom10-27-09CGPM.pdf download>
Description: Action Items from CG Planning Mtg (10.27.09)
Type: Minutes
Status: DRAFT
Contact
10/29/2009 Draft Planning Agenda (12.9.09) (v: 1)
PlanningAgenda(12-9-09).pdf download>
Description: Planning Mtg Agenda
Type: Agenda
Status: DRAFT
10/29/2009 Gen Weight Factors HL Directional (v: 1)
...ightFactors_HL_Directional.pdf download>
Description: Gen Weight Factors HL Directional
Type: Spreadsheet
Status: DRAFT
Contact
10/27/2009 Miller - TCWG - WECC Wide Planning and the SCG (v: 1)
...r-TCWG-WECCWidePlanningSCG.pdf download>
Description: Miller - TCWG - WECC Wide Planning and the SCG
Type: Presentation
Status: DRAFT
Contact
10/26/2009 Utility Project Summary (v: 1)
UtilityProjectsummary.xls download>
Description: Utility Project Summary
Type: Spreadsheet
Status: DRAFT
Contact
10/26/2009 NTTG Economic Study 2009 (v: 1)
NTTG-EconomicStudy-2009.pdf download>
Description: NTTG Economic Study 2009
Type: Presentation
Status: DRAFT
10/26/2009 CG 2010 Transmission Plan Draft (v: 1)
...d2010TransmissionPlanDraft.xls download>
Description: CG 2010 Transmission Plan Draft
Type: Spreadsheet
Status: DRAFT
Contact
10/21/2009 PSAST TCRM Report Draft (v: 1)
confidentiality agreement required >
Description: PSAST TCRM Report Draft
Type: Report
Status: DRAFT
Contact
10/15/2009 WREZ Demonstration (v: 1)
WREZDemonstration.ppt download>
Description: WREZ Demonstration
Type: Presentation
Status: DRAFT
10/15/2009 Solar 1 (v: 1)
SOLAR1.xlsx download>
Description: Solar 1
Type: Spreadsheet
Status: DRAFT
10/15/2009 Hourly Wind Integration Model (v: 1)
...ly Wind Integration Model.xlsm download>
Description: Hourly Wind Integration Model
Type: Spreadsheet
Status: DRAFT
10/06/2021 PSAST Agenda (10.22.09) (v: 1)
PSAST_Oct22nd_Agenda (2).pdf download>
Description: PSAST Agenda
Type: Agenda
Status: DRAFT
Contact
10/06/2021 WIST Agenda (10.6.09) (v: 1)
WIST10-15-09Agenda.pdf download>
Description: WIST Agenda
Type: Agenda
Status: DRAFT
10/06/2021 WIST Notes and Action Items (9.10.09) (v: 1)
...s and Action Items 9-10-09.doc download>
Description: WIST Notes and Action Items (9.10.09)
Type:
Status: DRAFT
10/06/2021 Simple Integration Model Studies (v: 1)
... Integration Model Studies.pdf download>
Description: Simple Integration Model Studies
Type: Document (pdf)
Status: DRAFT
10/06/2021 NWIF TWG Mtg (10.29.09) Agenda (v: 1)
IF TWG Mtg 10-29-09 Agenda.doc download>
Description: NWIF TWG Mtg (10.29.09) Agenda
Type: Agenda
Status: DRAFT
10/06/2021 DSL Schedule Request (v: 1)
DSL Schedule Request.doc download>
Description: DSL Schedule Request
Type: Document (pdf)
Status: DRAFT
10/06/2021 Solar Performance (v: 1)
Solar Performance.pdf download>
Description: Solar Performance
Type:
Status: DRAFT
09/28/2009 ColumbiaGrid Presentation (PSE) (v: 1)
...idPresentation(9.23.09)R01.pdf download>
Description: ColumbiaGrid Presentation (PSE)
Type: Presentation
Status: DRAFT
09/25/2009 PSAST TCRM Report Draft2 (v: 1)
request access > login >
Description: PSAST_TCRM_Report_Draft2
Type: Report
Status: DRAFT
Contact
09/23/2009 Action Items from 9.22.09 Mtg (v: 1)
ActionItemsfrom9-22-09CGPM.pdf download>
Description: Action Items from 9.22.09 Mtg
Type: Minutes
Status: DRAFT
Contact
09/23/2009 Draft Planning Agenda (v: 1)
PlanningAgenda(10.27.09).pdf download>
Description: Draft Planning Agenda
Type: Agenda
Status: DRAFT
Contact
09/22/2009 SPG Coordination Group (v: 1)
SCG-Report.pdf download>
Description: SPG Coordination Group
Type: Presentation
Status: DRAFT
Contact
09/21/2009 10 Year Comparison (v: 1)
request access > login >
Description: 10 Year Comparison
Type: Spreadsheet
Status: DRAFT
Contact
09/21/2009 Summer Wind Overload Comparison (v: 1)
request access > login >
Description: Summer Wind Overload Comparison
Type: Spreadsheet
Status: DRAFT
Contact
09/21/2009 Narrative of Wind Generation Sensitivity Study with New 10 Year Cases (v: 1)
request access > login >
Description: Narrative of Wind Generation Sensitivity Study with New 10 Year Cases
Type: Report
Status: DRAFT
Contact
09/21/2009 Narrative of 10 Year System Assessment Update Methodology (v: 1)
request access > login >
Description: Narrative of 10 Year System Assessment
Type: Report
Status: DRAFT
Contact
09/16/2009 Restack Cluster Study (v: 1)
...ack_Cluster_Study_09-19-09.pdf download>
Description: Restack Cluster Study
Type: Report
Status: DRAFT
09/16/2009 2009 NOS Update (v: 1)
2009_NOS_Update_09-15-09.pdf download>
Description: 2009 NOS Update
Type: Report
Status: DRAFT
09/16/2009 2008 NOS Summary Timeline Map (v: 1)
...8_NOS_Summary_Timeline_Map.pdf download>
Description: 2008 NOS Summary Timeline Map
Type: Report
Status: DRAFT
09/16/2009 NOS PTSA Update (v: 1)
08_NOS_PTSA_Update.pdf download>
Description: NOS PTSA Update
Type: Report
Status: DRAFT
09/15/2009 PSAST Agenda (09.23.09) (v: 1)
PSAST_Sept23rd_Agenda.pdf download>
Description: PSAST Agenda
Type: Agenda
Status: FINAL
Contact
09/15/2009 Standard TPL-001-1 - Transmission System Planning Performance Requirements (v: 1)
...1-1_Draft3_Clean_2009May26.pdf download>
Description: Standard TPL-001-1 - Transmission System Planning Performance Requirements
Type: Report
Status: DRAFT
09/15/2009 Standard PRC-006-01 Automatic Underfrequency Load Shedding (v: 1)
...UFLS_PRC-006-1_2009April20.pdf download>
Description: Standard PRC-006-01 Automatic Underfrequency Load Shedding
Type: Report
Status: DRAFT
09/15/2009 Reliability Functional Model Technical Document V.5 (v: 1)
...cument_V5_Clean_2009July21.pdf download>
Description: Reliability Functional Model Technical Document V.5
Type: Report
Status: DRAFT
09/14/2009 Tabbed Applicability Matrix (v: 1)
...-TabbedApplicabilityMatrix.xls download>
Description: Tabbed Applicability Matrix
Type: Spreadsheet
Status: DRAFT
Contact
09/14/2009 Wind Integration Model (v: 1)
2WindIntegrationModel.pdf download>
Description: Wind Integration Model
Type: Document (pdf)
Status: DRAFT
09/14/2009 Wind Integration Study Team 2021-09-10 (meeting minutes) (v: 1)
...grationStudyTeam2009-09-10.doc download>
Description: Wind Integration Study Team 2021-09-10 (meeting minutes)
Type: Minutes
Status: DRAFT
09/10/2021 WIST CAES Presentation (v: 1)
WIST CAES Sept 2009.ppt download>
Description: WIST CAES Presentation
Type: Presentation
Status: DRAFT
09/10/2021 Detailed Technical Studies Path 3 (v: 1)
technicalstudiesPath3.ppt download>
Description: Detailed Technical Studies Path 3
Type: Presentation
Status: DRAFT
09/10/2021 BPA 8-09 Wind Load (v: 1)
BPA 8-09 wind-load.JPG download>
Description: BPA 8-09 Wind Load
Type:
Status: DRAFT
09/10/2021 BPA Wind & Load System Peak 2008 (v: 1)
... and Load System Peak 2008.JPG download>
Description: BPA Wind & Load System Peak 2008
Type:
Status: DRAFT
09/10/2021 WIST 2012EC6A Update (v: 1)
WIST Sep10_2012EC6A Update.pdf download>
Description: WIST 2012EC6A Update
Type: Presentation
Status: DRAFT
09/04/2021 BPA-Adjacents listing+NERC status (v: 1)
...djacentslisting+NERCstatus.pdf download>
Description: BPA-Adjacents listing+NERC status
Type:
Status: FINAL
09/04/2021 Planning Authority Meeting Agenda 9-21-09 (v: 1)
...ity Meeting Agenda 9-21-09.pdf download>
Description: Planning Authority Meeting Agenda 9-21-09
Type: Agenda
Status: FINAL
Contact
09/04/2021 NERC Function Types (v: 1)
NERC Function Types.pdf download>
Description: NERC Function Types
Type: Report
Status: FINAL
Contact
09/04/2021 NERC Compliance Registry for ColumbiaGrid parties (v: 1)
...y for ColumbiaGrid parties.pdf download>
Description: NERC Compliance Registry for ColumbiaGrid parties
Type: Report
Status: FINAL
Contact
09/04/2021 Excerpt-NERC Rules of Procedures-Section 507 (v: 1)
...RCRulesofProcedures-Sec507.pdf download>
Description: Excerpt-NERC Rules of Procedures-Section 507
Type: Report
Status: FINAL
Contact
09/01/2022 WIST Mtg Notes & Action Items (v: 1)
...072109MtgNotes&ActionItems.pdf; download>
Description: WIST Mtg Notes & Action Items
Type: Notes
Status: DRAFT
Contact
09/01/2022 DSS & WIST Integrated Draft Timeline (v: 1)
...egratedDraftTimeline081909.pdf download>
Description: DSS & WIST Integrated Draft Timeline
Type: Document (pdf)
Status: DRAFT
09/01/2022 WIST Agenda (9.1.09) (v: 1)
WISTAgenda(9.10.09).pdf download>
Description: WIST Agenda (9.1.09)
Type: Agenda
Status: DRAFT
08/31/2009 Final Language re MultiParty Open Season (8.27.09) (v: 1)
...arty Open Season (8.27.09).doc download>
Description: Final Language re MultiParty Open Season (8.27.09)
Type: Report
Status: DRAFT
Contact
08/31/2009 Proposed Comparability Revisions 8.10.09 (v: 1)
...rability Revisions 8.10.09.doc download>
Description: Proposed Comparability Revisions 8.10.09
Type: Report
Status: DRAFT
Contact
08/31/2009 Proposed Comparability Revisions 8 10 09-1 (v: 1)
...8 10 09-1 (Landauer edits).doc download>
Description: Proposed Comparability Revisions 8 10 09-1
Type: Report
Status: DRAFT
Contact
08/31/2009 Proposed CG Cost Allocation Revisions 8.10.09 (v: 1)
...location Revisions 8.10.09.doc download>
Description: Proposed CG Cost Allocation Revisions 8.10.09
Type: Report
Status: DRAFT
Contact
08/26/2009 Draft Language re:Multi-Party Open Season (v: 1)
...ge_reMulti-PartyOpenSeason.doc download>
Description: Draft Language re:Multi-Party Open Season
Type: Report
Status: DRAFT
Contact
08/18/2009 Proposed CG Cost Allocation Revisions (8.10. 09) (v: 1)
...ocationRevisions(8.10. 09).pdf download>
Description: Proposed CG Cost Allocation Revisions (8.10. 09)
Type: Document (pdf)
Status: FINAL
Contact
08/18/2009 Proposed Comparability Revisions (8.10.09) (v: 1)
...rabilityRevisions(8.10.09).pdf download>
Description: Proposed Comparability Revisions (8.10.09)
Type: Document (pdf)
Status: FINAL
Contact
08/18/2009 Joint Intervention PEFA (v: 1)
Joint Intervention PEFA.pdf download>
Description: Joint Intervention PEFA
Type: Filing
Status: FINAL
Contact
08/18/2009 ColumbiaGrid Rehearing Request (FINAL) (v: 1)
...umbiaGridReh'gRequestFINAL.pdf download>
Description: ColumbiaGrid Rehearing Request FERC filing (FINAL)
Type: Filing
Status: FINAL
Contact
08/18/2009 Action Items from 8.6.09 Mtg (v: 1)
ActionItemsfrom8-6-09CGPM.pdf download>
Description: Action Items from 8.6.09 Mtg
Type: Document (pdf)
Status: DRAFT
Contact
08/12/2021 PPL Energy Plus Comments (v: 1)
PPL_Energy_Plus_Comments.pdf download>
Description: PPL Energy Plus Comments of draft Garrison Pumped Storage study results
Type: Comments
Status: DRAFT
08/11/2021 Draft Planning Agenda (9.22.09) (v: 1)
PlanningAgenda(9.22.09).pdf download>
Description: Planning Agenda (9.22.09)
Type: Agenda
Status: DRAFT
08/10/2021 Meeting Notes & Action Items (v: 1)
...072109MtgNotes&ActionItems.pdf; download>
Description: Meeting Notes & Action Items
Type: Notes
Status: DRAFT
08/10/2021 WECC TEPPC 2012 Update (v: 1)
...PPC 2012 Update_21July (2).pdf download>
Description: WECC TEPPC 2012 Update
Type: Report
Status: FINAL
08/10/2021 Wind Model (v: 1)
Wind Model.pdf download>
Description: Wind Model
Type: Presentation
Status: FINAL
08/06/2021 Pages from Transmission Conference Agenda (v: 1)
...omTrans.ConfAgenda(8.6.09).pdf download>
Description: Pages from Transmission Conference Agenda
Type: Report
Status: DRAFT
08/06/2021 Cost Comp (v: 1)
CostComp(8.7.09).pdf download>
Description: Cost Comp
Type: Spreadsheet
Status: DRAFT
Contact
08/06/2021 Trojan-Horizon Presentation (v: 1)
...orizonPresentation(8-6-09).pdf download>
Description: Trojan-Horizon Presentation
Type: Presentation
Status: DRAFT
08/05/2021 NOS Update (v: 1)
...anningMtgNOSUpdate(8.6.09).pdf download>
Description: NOS Update
Type: Presentation
Status: DRAFT
08/05/2021 System Assessment Presentation (v: 1)
...ssmentPresentation(8.6.09).pdf download>
Description: System Assessment Presentation
Type: Presentation
Status: DRAFT
Contact
08/05/2021 Canada - Pacific NW - N. California Transmission Project (v: 1)
CNC-BEM(8.06.2021).pdf download>
Description: Canada - Pacific NW - N. California Transmission Project
Type: Presentation
Status: DRAFT
08/03/2022 Draft Planning Agenda (8.6.09) (v: 1)
PlanningAgenda(8.6.09).pdf download>
Description: Draft Planning Agenda (8.6.09)
Type: Agenda
Status: DRAFT
07/21/2009 Plexo Wind Integration Presentation (Toulson) (v: 1)
Wind_Integration(Toolson).pdf download>
Description: Wind Integration Presentation
Type: Presentation
Status: DRAFT
07/21/2009 PSAST Agenda (08.04.09) (v: 1)
PSASTAgenda 08.04.09.pdf download>
Description: PSAST Agenda for 08.04.09
Type: Agenda
Status: FINAL
Contact
07/21/2009 Wind Analysis Presentation (v: 1)
...lysisPresentation(7.21.09).pdf download>
Description: Wind Analysis Presentation
Type: Presentation
Status: DRAFT
Contact
07/15/2009 Northern Mid C Agenda (8.7.09) (v: 1)
NMCSTAgenda(8.7.09).pdf download>
Description: N. Mid C Agenda
Type: Agenda
Status: DRAFT
07/15/2009 Action Items from 6.09 Mtg (v: 1)
ActionItems(6-10-09)CGPM.pdf download>
Description: Action Items from 6.09 Mtg
Type: Minutes
Status: DRAFT
Contact
07/15/2009 WIST Agenda (7.21.09) (v: 1)
WISTAgenda(7.21.09).pdf download>
Description: WIST Agenda (7.21.09)
Type: Agenda
Status: DRAFT
Contact
06/15/2009 Summer '09 Nomogram Analysis for PSAST (v: 1: this is a .zipped file)
request access > login >
Description: Summer '09 Nomogram Analysis for PSAST
Type: Spreadsheet
Status: DRAFT
Contact
06/11/2021 Planning Assumptions (June 10, 2021) (v: 1)
...ssumptions for 10Jun09 Mtg.doc download>
Description: Planning Assumptions (June 10, 2021)
Type: Document (pdf)
Status: DRAFT
Contact
06/10/2021 Overload Comparison Table (v: 2)
request access > login >
Description: Overload Comparison Table
Type: Spreadsheet
Status: DRAFT
Contact
06/10/2021 Basecase/Wind Diagrams (v: 1)
basecasediagrams.pdf download>
Description: Basecase/Wind Diagrams
Type: Presentation
Status: DRAFT
Contact
06/09/2021 Weighted TCRM Generation Heavy Loading (v: 1)
WgtdTCRM _ GenHvyLoading.pdf download>
Description: Weighted TCRM Generation Heavy Loading
Type: Spreadsheet
Status: DRAFT
Contact
06/08/2021 Draft Planning Agenda (6-10-09) (v: 2)
DraftAgenda(6-10-09)1.pdf download>
Description: Draft Planning Agenda (6-10-09)
Type:
Status: FINAL
Contact
06/08/2021 Col Grid 2009 Transmission Plan Draft (2) (v: 2)
...09TransmissionPlanDraft(2).xls download>
Description: Col Grid 2009 Transmission Plan Draft (2)
Type: Spreadsheet
Status: DRAFT
Contact
06/08/2021 2009 System Assessment 6-8-09 draft (v: 1)
...ystemAssessment6-8-09draft.doc download>
Description: 2009 System Assessment 6-8-09 draft
Type: Report
Status: DRAFT
Contact
06/08/2021 PSAST Agenda (6.16.09) (v: 1)
PSASTAgenda(06.16.09).pdf download>
Description: PSAST Agenda (06.16.09)
Type: Agenda
Status: DRAFT
Contact
06/05/2021 Cost Comparison (v: 1)
CostComp.pdf download>
Description: Cost Comparison for N. Mid C
Type: Spreadsheet
Status: DRAFT
Contact
06/05/2021 Northern Mid C Agenda (6.9.09) (v: 1)
Agenda(5.28.09).pdf download>
Description: NMC Agenda
Type: Agenda
Status: DRAFT
05/21/2009 Wind Analysis (v: 1)
WindAnalysis(2)5.21.09.pdf download>
Description: Wind Analysis
Type: Presentation
Status: DRAFT
Contact
05/20/2009 WIST Work Plan (v: 1)
WISTWorkPlan.pdf download>
Description: WIST Work Plan
Type: Document (pdf)
Status: DRAFT
05/20/2009 WIST (v: 1)
WIST.pdf download>
Description: WIST
Type: Spreadsheet
Status: DRAFT
05/19/2009 Planning Wind Analysis (v: 1)
...nningWindAnalysis(5.20.09).pdf download>
Description: Planning Wind Analysis
Type: Presentation
Status: DRAFT
Contact
05/15/2009 WIST Agenda(5.21.09) (v: 1)
Agenda(5.21.09).pdf download>
Description: WIST Agenda(5.21.09)
Type: Agenda
Status: FINAL
05/13/2009 April 2009 PSANI Events & OCTAG Study Plan Update (v: 1)
request access > login >
Description: April 2009 PSANI Events & OCTAG Study Plan Update
Type: Report
Status: FINAL
Contact
05/13/2009 Contingency Analysis Summary (5.11.09) (v: 2)
request access > login >
Description: Contingency Analysis Summary
Type: Spreadsheet
Status: DRAFT
Contact
05/11/2021 Action Items From 5.07.09 Meeting (v: 1)
ActionItemsfrom5-7-09CGPM.pdf download>
Description: Action Items From 5.07.09 Meeting
Type: Report
Status: FINAL
Contact
05/07/2021 Contingency Aux Files - Optional Download (v: 2: Aux files to modify WECC cases and contingency definitions)
request access > login >
Description: Contingency Aux Files
Type: PowerWorld Auxiliary File
Status: DRAFT
Contact
05/07/2021 2006 Wind Correlation Profiles (v: 1)
2006WindProfiles.pdf download>
Description: 2006 Wind Correlation
Type: Spreadsheet
Status: DRAFT
Contact
05/07/2021 Results Template (v: 1)
ResultsTemplate.pdf download>
Description: Results Template
Type: Spreadsheet
Status: DRAFT
Contact
05/07/2021 NTTG Study Matrix (v: 1)
TTGStudyMatrix(2021-05-07).pdf download>
Description: NTTG Study Matrix
Type: Document (pdf)
Status: DRAFT
05/07/2021 Requested Service Projects (v: 1)
...tedServiceProjects(5-7-09).pdf download>
Description: Requested Service Projects
Type: Presentation
Status: DRAFT
Contact
05/07/2021 DHM to WECC Board (04.29.09) fin (2) (v: 1)
...-WECCBoard(04.29.09)fin(2).pdf download>
Description: DHM to WECC Board (04.29.09) fin (2)
Type:
Status: DRAFT
05/07/2021 Excerpts from the NWPCC Load Forecast (v: 1)
...ptsNWPCCLoadForecast(5-09).pdf download>
Description: Excerpts from the NWPCC Load Forecast
Type: Presentation
Status: DRAFT
05/06/2021 I5 CG Update (v: 1)
I5_CG_Update_5_09.pdf download>
Description: I5 CG Update
Type: Presentation
Status: DRAFT
05/04/2021 N. Mid C Agenda (v: 1)
NMCSTAgenda(5.6.09).pdf download>
Description: N. Mid C Agenda
Type: Agenda
Status: DRAFT
Contact
04/28/2009 Grant's Kilroy Bldg (v: 1)
rant'sKilroyBldgDirections.pdf download>
Description: Grant's Kilroy Building location and directions
Type: Document (pdf)
Status: FINAL
Contact
04/28/2009 PSAST Agenda (5.05.09) (v: 1)
PSASTMay5thAgenda.pdf download>
Description: PSAST May5th Agenda
Type: Agenda
Status: FINAL
Contact
04/15/2009 Transmission Planning Update (v: 1)
Txn Planning (04.15.09).pdf download>
Description: Transmission Planning Update
Type: Presentation
Status: DRAFT
Contact
04/08/2021 Action Items from Planning Mtg 3.30.09 (v: 1)
risk of use agreement required >>
Description: Action Items from Planning Mtg 3.30.09
Type: Document (pdf)
Status: DRAFT
Contact
04/07/2021 Northern Mid-C Study Team Report (4.10.09) (v: 1)
...rn Mid-C Study Team Report.pdf download>
Description: Northern Mid-C Study Team Report
Type: Report
Status: DRAFT
Contact
04/07/2021 Wenatchee Area Map - Proposed (v: 1)
risk of use agreement required >>
Description: Wenatchee Area Map - Proposed
Type: Map
Status: DRAFT
Contact
04/07/2021 NMC Plan Summary (v: 1)
risk of use agreement required >>
Description: NMC Plan Summary
Type: Spreadsheet
Status: DRAFT
Contact
04/07/2021 Draft Planning Agenda (5.7.09) (v: 1)
PlanningAgenda(5.7.09).pdf download>
Description: Planning Meeting Agenda (Draft)
Type: Agenda
Status: DRAFT
03/31/2009 Dynamic Scheduling (v: 1)
risk of use agreement required >>
Description: Dynamic Scheduling for WIST meeting
Type: Report
Status: DRAFT
03/30/2009 TEPPC Regional Planning White Paper (v: 1)
...regionalplanningwhitepaper.pdf download>
Description: TEPPC regional planning white paper
Type: Report
Status: DRAFT
03/25/2009 WIST Agenda (4.3.09) (v: 1)
Agenda(4.3.09).pdf download>
Description: WIST Agenda (4.3.09)
Type: Agenda
Status: DRAFT
Contact
03/23/2009 Action Items from 2.25.09 Mtg (v: 1)
ActionItemsfrom2-25-09CGPM.pdf download>
Description: Action Items from 2.25.09 Mtg
Type: Notes
Status: DRAFT
Contact
03/23/2009 Draft Planning Agenda (3.31.09) (v: 1)
PlanningAgenda(3-31-09).pdf download>
Description: Draft Planning Agenda (3.31.09)
Type: Agenda
Status: DRAFT
Contact
03/18/2009 Northern Mid C Agenda (4.3.09) (v: 1)
NMCST Agenda 4-3-09.pdf download>
Description: NMCST Agenda 4-3-09
Type: Agenda
Status: FINAL
03/11/2021 Approved - 2009 Biennial Transmission Expansion Plan (v: 2)
transmissionplan2.pdf download>
Description: Approved 2009 Biennial Transmission Expansion Plan
Type: Report
Status: FINAL
Contact
03/09/2021 Northern Mid C Agenda (3.10.09) (v: 1)
NMCSTAgenda(3.10.09).pdf download>
Description: Northern Mid C Agenda (3.10.09)
Type: Agenda
Status: DRAFT
03/05/2021 NI DS Study for CG WIST(3.5.09) (v: 1)
NIDSstudyCGWIST.pdf download>
Description: Powerex presentation: NI DS Study for CG WIST(3.5.09)
Type: Presentation
Status: DRAFT
Contact
03/04/2021 Northwest Wind Integration Forum Work Items Final Draft (v: 1)
...grationForumWorkItemsFinal.pdf download>
Description: Northwest Wind Integration Forum Work Items Final Draft
Type: Document (pdf)
Status: FINAL
Contact
03/02/2022 Excerpt from Draft NERC IVGTF Report (v: 1)
ExcerptDraftIVGTFreport.pdf download>
Description: Excerpt from Draft NERC IVGTF Report
Type: Report
Status: DRAFT
03/02/2022 Draft Issues List - WECC Variable Generation Subcommittee (v: 1)
...ableGenerationSubcommittee.pdf download>
Description: Draft Issues List - WECC Variable Generation Subcommittee
Type: Report
Status: DRAFT
03/02/2022 WIST Agenda (3.2.09) (v: 1)
WISTagenda(3.5.09).pdf download>
Description: Wind Integration Study Team Agenda
Type: Agenda
Status: DRAFT
02/26/2009 Contingency Analysis Agenda (02.25.09) (v: 1)
14HW1CG.doc download>
Description: 14HW1CG & 13HS1CG Contingency Analysis Meeting
Type: Agenda
Status: DRAFT
02/26/2009 Case Development Supporting Data (v: 1)
request access > login >
Description: Case Development Supporting Data
Type: PowerWorld Auxiliary File
Status: DRAFT
Contact
02/26/2009 ATNI Energy Conf Agenda_Registration (v: 1)
...y Conf Agenda_Registration.pdf download>
Description: ATNI Energy Conf Agenda_Registration
Type: Agenda
Status: FINAL
02/25/2009 2009 Study Plan Agenda Item 7 (2.25.09) (v: 1)
2009 Study Plan.pdf download>
Description: 2009 Study Plan for agenda item 7
Type: Report
Status: DRAFT
Contact
02/25/2009 NERC Planning Authority Agenda Igem 12 (2.25.09) (v: 1)
...abbed Applicability Matrix.pdf download>
Description: NERC Planning Authority for agenda item 12
Type: Spreadsheet
Status: FINAL
Contact
02/24/2009 Draft Planning Agenda (2.25.09) (v: 1)
...Planning Agenda (2-25-09)1.pdf download>
Description: Draft Planning Agenda (2-25-09)
Type: Agenda
Status: FINAL
02/23/2009 Agenda Item 13d - EAC Report on Keeping the Lights On (v: 1)
EACReport-KeepingLightson.pdf download>
Description: Agenda Item 13d - EAC Report on Keeping the Lights On
Type: Report
Status: DRAFT
02/23/2009 Agenda Item 13b - Draft comments from WECC Seminar on Long Term Planning (v: 1)
...tsWECCSeminar-LongTermPlan.doc download>
Description: Agenda Item 13b - Draft comments from WECC Seminar on Long Term Planning
Type: Comments
Status: DRAFT
02/23/2009 Agenda Item 13a - WREZ Transmission Segment Map (v: 1)
WREZTransSegmentMap.ppt download>
Description: Agenda Item 13a - WREZ Transmission Segment Map
Type: Presentation
Status: DRAFT
02/23/2009 Agenda Item 13a - WREZ Transmission Assumptions (v: 1)
WREZTransAssumptions.ppt download>
Description: Agenda Item 13a - WREZ Transmission Assumptions
Type: Presentation
Status: DRAFT
02/23/2009 Agenda Item 13c - Green Power Superhighways Report (v: 1)
GreenPowerSuperhwysRept.pdf download>
Description: Agenda Item 13c - Green Power Superhighways Report
Type: Report
Status: DRAFT
02/18/2009 Resolution to adopt 2009 Txn Exp Plan (02.18.09) (v: 1)
...09 Txn Exp Plan (02.18.09).pdf download>
Description: Resolution to adopt 2009 Transmission Expansion Plan (02.18.09)
Type: Corporate Doc
Status: FINAL
Contact
02/10/2021 PSAST Feb 19th Agenda (2.19.09) (v: 1)
PSAST Feb19th Agenda.pdf download>
Description: PSAST Feb1 9th Agenda
Type:
Status: FINAL
01/30/2009 ContingencyAnalysisAuxFiles (v: 1)
request access > login >
Description: ContingencyAnalysisAuxFiles
Type: Base Case
Status: DRAFT
Contact
01/29/2009 Study Request to TEPPC 2009 (v: 1)
tudy Request to TEPPC 2009.pdf download>
Description: Study Request to TEPPC 2009
Type: Letter
Status: DRAFT
Contact
01/28/2009 2008 NOS Reg Eco Benefit_CG Briefing (v: 1)
...eg Eco Benefit_CG Briefing.pdf download>
Description: 2008 NOS Reg Eco Benefit_CG Briefing
Type: Presentation
Status: FINAL
01/28/2009 2008 NOS Recommendation_CG Briefing v1 (v: 1)
...ommendation_CG Briefing v1.pdf download>
Description: 2008 NOS Recommendation_CG Briefing v1
Type: Presentation
Status: FINAL
01/28/2009 Base Case Quality Assurance (v: 1)
BaseCaseQualityAssurance.pdf download>
Description: Base Case Quality Assurance
Type: Presentation
Status: DRAFT
Contact
01/26/2009 Draft Planning Agenda (1.29.09) (v: 2)
...nning Agenda (1-29-09) (2).pdf download>
Description: Draft Planning Agenda (1.29.09)
Type: Agenda
Status: DRAFT
Contact
01/14/2009 PSAST Agenda (1.27.09) (v: 1)
PSAST Agenda (1.27.09).pdf download>
Description: PSAST Agenda (1.27.09)
Type: Agenda
Status: FINAL
Contact
12/29/2008 Load Growth Est. By Owner (v: 1)
confidentiality agreement required >
Description: Load Growth Est. By Owner
Type: Spreadsheet
Status: FINAL
Contact
12/29/2008 Load Growth Est. By Zone (v: 1)
confidentiality agreement required >
Description: Load Growth Estimates By Zone
Type: Base Case
Status: FINAL
Contact
12/15/2008 Draft Planning Agenda (12.16.08) (v: 1)
...Planning Agenda (12-16-08).pdf download>
Description: Draft Planning Agenda (12-16-08)
Type: Agenda
Status: FINAL
12/15/2008 2009-2019 Transmission Expansion Plan Draft Presentation (v: 1)
TxExpPlan(12.16.08).pdf download>
Description: 2009-2019 Transmission Expansion Plan Draft Presentation
Type: Presentation
Status: DRAFT
Contact
12/15/2008 NWPP Voluntary Northwest Transmission Adequacy Guidelines (v: 1)
TAG_V0_final.doc download>
Description: NWPP Voluntary Northwest Transmission Adequacy Guidelines
Type: Report
Status: DRAFT
Contact
12/15/2008 PEFA Primer (v: 1)
PEFA PrimerRev2.pdf download>
Description: PEFA Primer
Type: Presentation
Status: DRAFT
Contact
12/12/2021 2009 System Assessment Preparation Supporting Data (v: 1)
request access > login >
Description: 16dec08, 2009 System Assessment Preparation Supporting Data
Type: Base Case
Status: FINAL
Contact
12/12/2021 2009 CG System Assessment (v: 1)
...9 CG System Assessment (2).pdf download>
Description: 2009 CG System Assessment Presentation
Type: Presentation
Status: FINAL
Contact
12/11/2021 NL Phase 1 Covering Letter Final 20081210 (v: 1)
...ring Letter Final 20081210.pdf download>
Description: NL Phase 1 Covering Letter Final 20081210
Type: Letter
Status: FINAL
12/08/2021 TAG_V0_final (12.09.08) (v: 1)
TAG_V0_final.pdf download>
Description: TAG_V0_final
Type: Report
Status: FINAL
Contact
12/03/2021 WECC Letter 11.14.08 (v: 1)
WECC ltr 11.14.08.pdf download>
Description: WECC Letter dated 11.14.08 regarding TEPPC study requests window open Dec 12 to Jan. 31
Type: Letter
Status: FINAL
12/03/2021 Study Request to TEPPC 2008 (v: 1)
tudy Request to TEPPC 2008.pdf download>
Description: Study Request to TEPPC 2008
Type: Letter
Status: FINAL
Contact
12/03/2021 2009-2019 Draft Transmission Expansion Plan (v: 1)
transmissionplan(12.3.08).pdf download>
Description: 2009-2019 Draft Transmission Expansion Plan
Type: Report
Status: DRAFT
Contact
12/02/2022 PSE Attachment K Meeting Notice & Agenda (11.09.08) (v: 1)
...Att K_PSAST Mtg Ntc&Agenda.pdf; download>
Description: PSE Attachment K Meeting Notice & Agenda (11.09.08)
Type: Agenda
Status: FINAL
12/01/2022 PSAST Agenda (12.09.08) (v: 1)
...T Draft Agenda (12.09.08).pdf download>
Description: PSAST Agenda (12.09.08)
Type: Agenda
Status: DRAFT
Contact
11/18/2008 CG Planning Meeting Presentation (v: 1)
Planningmtg(11.18.08).pdf download>
Description: CG Planning Meeting Presentation
Type: Presentation
Status: DRAFT
Contact
11/17/2008 Draft Planning Agenda (11.18.08) (v: 1)
Agenda (11-18-08.pdf).pdf download>
Description: Biennial Plan Group Agenda (11.18.08)
Type: Agenda
Status: FINAL
11/14/2008 Northern Mid C Agenda (11-19-08) (v: 1)
NMCST Agenda 11-19-08.doc download>
Description: Agenda for November 19th North Mid Columbia study team meeting
Type: Agenda
Status: DRAFT
11/12/2021 PSAST Agenda (11.17.08) (v: 1)
PSASTAgenda(11.17.08).pdf download>
Description: PSAST Agenda (11.17.08)
Type: Agenda
Status: DRAFT
Contact
10/31/2008 Preliminary Draft 2008-2018 Transmission Expansion Plan (v: 1)
prelimDRAFTtx_exp_Plan.doc download>
Description: Preliminary Draft 2008-2018 Transmission Expansion Plan
Type: Report
Status: DRAFT
Contact
10/31/2008 ColGrid 2008 Transmission Plan (10.30.08) (v: 1)
...ransmissionPlan(10.30.08)1.xls download>
Description: ColGrid 2008 Transmission Plan (10.30.08)
Type: Spreadsheet
Status: DRAFT
Contact
10/31/2008 2008 Biennial Plan Attachments (v: 1)
attachments1.pdf download>
Description: Biennial Plan Attachments
Type: Document (pdf)
Status: DRAFT
Contact
10/20/2008 PSAST Agenda (10.22.08) (v: 1)
draftAgenda(10.22.08)2.pdf download>
Description: PSAST Draft Agenda (10.22.08)
Type: Agenda
Status: FINAL
10/17/2008 PSAST_NODO_Results.zip (v: 1)
request access > login >
Description: PSAST_NODO_Results
Type: Spreadsheet
Status: FINAL
Contact
10/10/2021 NOS Update from BPA (v: 1)
NOSUpdate(10.09.08).pdf download>
Description: NOS Update from BPA
Type: Presentation
Status: DRAFT
10/08/2021 Regional Economic Analysis CG Final (v: 1)
Reg.Eco.Ana._CG.pdf download>
Description: Regional Economic Analysis CG Final
Type: Presentation
Status: DRAFT
10/07/2021 Biennial Plan Process & Schedule (v: 1)
Bien.Pro.Sched.(10.9.08).pdf download>
Description: Biennial Plan Process & Schedule
Type: Presentation
Status: DRAFT
Contact
10/07/2021 Regional Coordination Activities (v: 1)
Reg.Coor.Act.(10.9.08).pdf download>
Description: Regional Coordination Activities
Type: Presentation
Status: DRAFT
Contact
10/07/2021 Draft Planning Agenda (10.9.08) (v: 2)
DraftAgenda(10.9.08)2.pdf download>
Description: Draft Planning Agenda(10.9.08)
Type: Agenda
Status: FINAL
10/03/2022 CG Planning Policy Statement (10.03.07) (v: 2)
G Policy Statement_10308v2.pdf download>
Description: CG Planning Policy Statement (10.03.08)
Type: Policy/Procedure
Status: FINAL
Contact
09/23/2008 PSAST Agenda (09.25.08) (v: 1)
PSAST.Agenda(09.25.08)1.pdf download>
Description: PSAST Agenda
Type: Agenda
Status: DRAFT
Contact
09/18/2008 Northern Mid C Agenda (9-22-08) (v: 1)
Agenda (9-22-08).pdf download>
Description: Northern Mid C Agenda (9-22-08); Agenda (9-22-08)
Type: Agenda
Status: FINAL
09/15/2008 CG 2008 Transmission Plan Combined Changes (v: 1)
...ion Plan(8 29 08)_combined.pdf download>
Description: CG 2008 Transmission Plan with combined comments
Type: Spreadsheet
Status: DRAFT
Contact
09/15/2008 NTTG MT-MidC Line at CG Draft (v: 1)
NTTGMT-MidC(9.16.08).pdf download>
Description: NTTG MT-MidC Line at CG Draft
Type: Presentation
Status: DRAFT
09/15/2008 Draft Planning Agenda (9.16.08) (v: 1)
Agenda(9.16.08).pdf download>
Description: Draft Planning Agenda (9.16.08)
Type: Agenda
Status: DRAFT
09/12/2021 Attachment B - Resources used in Base Cases (v: 1)
...ources-basecases(9.12.08)2.doc download>
Description: Attachment B - Resources used in Base Cases
Type: Report
Status: DRAFT
Contact
09/12/2021 Summary of Sensitivity Studies - Draft (v: 1)
mSensitivityStudy(9.12.08).pdf download>
Description: Summary of Sensitivity Studies - Draft
Type: Report
Status: DRAFT
Contact
09/03/2022 CostAllocPrinciElPasoDiff (v: 1)
...here El Paso is different).pdf download>
Description: Allocation Principles (with notes where El Paso is different)
Type: Document (pdf)
Status: DRAFT
09/03/2022 DraftCGPresentation9.9.08FERC ConfCall (v: 1)
....9.08 FERC Conference Call.pdf download>
Description: DraftCGPresentation9.9.08FERC ConfCall
Type: Presentation
Status: DRAFT
Contact
09/02/2022 Involvement in Reg and Subreg Planning Proposed Strawman Language (v: 1)
...Proposed Strawman Language.pdf download>
Description: Involvement in Regional and Subregional Planning Proposed Strawman Language
Type: Presentation
Status: DRAFT
Contact
09/02/2022 CG Draft Confidential Information and CEII Proposed (v: 1)
...Proposed Strawman Language.pdf download>
Description: CG Draft Confidential Information and CEII Proposed
Type: Document (pdf)
Status: DRAFT
08/14/2008 NOS Update (v: 1)
...ing NOS Update 8-14-08 (2).pdf download>
Description: NOS Update
Type: Presentation
Status: FINAL
08/14/2008 NMC Map (v: 1)
NMC Map (2).pdf download>
Description: NMC Map
Type: Map
Status: FINAL
Contact
08/08/2021 Action Items 25 June 2021 (v: 1)
tion Items from 25June2008.pdf download>
Description: Action Items from 25 June 2021
Type:
Status: FINAL
Contact
08/08/2021 Mid-C Study Plan (v: 1)
Mid-C_Study Plan1.pdf download>
Description: Mid-C-Study Plan
Type:
Status: FINAL
Contact
08/08/2021 Northern Mid C Agenda (08.15.08) (v: 1)
NMCST Agenda 8-15-08.pdf download>
Description: Northern Mid C Agenda (08.15.08)
Type: Agenda
Status: FINAL
08/04/2021 PSAST Agenda (8.5.08) (v: 1)
PSAST_Agenda_080508_2.pdf download>
Description: PSAST Agenda
Type: Agenda
Status: DRAFT
07/21/2008 Planning Activities NMCST (v: 1)
... Activities NMCST(7.22.08).pdf download>
Description: Planning Activities Northern M-Columbia Study Team
Type: Presentation
Status: FINAL
Contact
07/09/2021 SubRegional Planning Grp Agenda (v: 1)
SPGagenda.pdf download>
Description: Agenda, Sub-Regional Planning Group
Type: Agenda
Status: DRAFT
Contact
07/02/2022 Draft Planning Agenda (7.10.08) (v: 1)
... Plan Group Agenda 7.10.08.pdf download>
Description: Draft Planning Agenda (7.10.08)
Type: Agenda
Status: DRAFT
06/24/2008 Northern Mid C Agenda (6.25.08) (v: 2)
NMCST Agenda 6-25-08f.pdf download>
Description: Northern Mid C Agenda (6.25.08)
Type: Agenda
Status: FINAL
06/17/2008 Planning Activities Report (v: 1)
planning(06.18.08).pdf download>
Description: Planning Activities Report
Type: Presentation
Status: DRAFT
Contact
05/21/2008 IP Impact (5.21.08) (v: 1)
IP_Impact.pdf download>
Type: Spreadsheet
Status: FINAL
Contact
05/21/2008 Northern Mid C Agenda (5.21.08) (v: 1)
Agenda052108.pdf download>
Description: Agenda
Type: Agenda
Status: FINAL
05/21/2008 Mid-C Study Plan (v: 1)
Mid-C_Study Plan.pdf download>
Description: Mid-C Study Plan
Type: Document (pdf)
Status: DRAFT
Contact
05/21/2008 Action Items from April 2008 Mtg (v: 1)
ActionItems22April2008.pdf download>
Description: Action Items fron April 22, 2021 Meeting
Type: Document (pdf)
Status: DRAFT
Contact
05/20/2008 Planning Report (v: 1)
Planning(05.21.08).pdf download>
Description: Planning Report
Type: Presentation
Status: DRAFT
Contact
05/20/2008 N I Summer 2008 Operating Nomograms (FINAL) (v: final)
... Operating Nomograms_FINAL.pdf download>
Description: Northern Intertie Summer 2008 Operating Nomograms (FINAL)
Type:
Status: FINAL
05/20/2008 DCPUD_T-Line Overview (v: 1)
DCPUD_T-Line Overview.pdf download>
Description: DCPUD_T-Line Overview
Type: Document (pdf)
Status: DRAFT
Contact
05/19/2008 PSAST Agenda (5.20.08) (v: 1)
Agenda 5-20-08r1.pdf download>
Description: PSAST Agenda (5.20.08)
Type: Agenda
Status: FINAL
05/19/2008 NI Nomogram Analysis (v: 1)
NI Nomogram Analysis.pdf download>
Description: NI Nomogram Analysis
Type: Spreadsheet
Status: FINAL
05/19/2008 TCRM Nomograms Comparison (v: 1)
TCRM Nomograms Summary.pdf download>
Description: TCRM Nomograms Comparison for 2003-2008
Type: Presentation
Status: FINAL
05/19/2008 Rating Study Plan (v: 1)
Rating Study Plan 09may08.pdf download>
Description: NW - BC (Path3) Phase 1 Path Rating Study Plan presented to PSAST Ma6 20, 2008 meeting
Type: Presentation
Status: FINAL
05/15/2008 Draft PSAST TCRA Study Plan V6 (v: draft)
...t PSAST TCRA Study Plan V6.pdf download>
Description: Draft PSAST TCRA Study Plan version 6
Type: Document (pdf)
Status: DRAFT
Contact
05/14/2008 BCTC System Operating Order 7T -64 (v: 1)
SOO7T-64_12jul07.pdf download>
Description: BCTC System Operating Order 7T -64 12jul07
Type: Spreadsheet
Status: FINAL
Contact
05/14/2008 Summer 07 Nomograms for NI-Heavy Load (v: 1)
...(100) All Lines In Service.pdf download>
Description: Summer Nomograms for NI for Ingledow-Custer, heavy load
Type: Spreadsheet
Status: FINAL
Contact
05/14/2008 Winter 08 Nomograms for NI Light Load (v: 1)
...of 436Winter08_SNL_results.pdf download>
Description: Winter Nomograms for NI Ingledow-Custer, Light Load
Type: Spreadsheet
Status: FINAL
Contact
05/14/2008 Summer 07 Nomograms for NI-Light Load (v: 1)
...(100) All Lines In Service.pdf download>
Description: Summer 07 Nomograms for NI-Ingledow-Custer, Light Load
Type: Spreadsheet
Status: FINAL
Contact
05/13/2008 Winter 08 Nomograms for NI-Heavy Load (v: 1)
...of 436Winter08_SNH_results.PDF download>
Description: Winter 08 Nomograms for NI-Ingledow-Custer, Heavy Load
Type: Spreadsheet
Status: FINAL
Contact
05/09/2021 Path 3 Phase 1 Study Plan 23apr08 (2) (v: draft)
...e 1 study plan 23apr08 (2).pdf download>
Description: Path 3 Phase 1 Study Plan 23apr08 (2)
Type: Document (pdf)
Status: DRAFT
Contact
04/29/2008 NOS Future Needs (04.30.08) (v: 1)
OS FutureNeeds(04.30.2008).pdf download>
Description: NOS Future Needs(04.30.08) - BPA report
Type: Report
Status: FINAL
Contact
04/29/2008 BPA WOCS Status (4.30.08) (v: 1)
BPA WOCS STATUS (4.30.08).pdf download>
Description: BPA West Of Cascades South Status Report
Type: Report
Status: FINAL
Contact
04/28/2008 Study Plans for Sensitivity Studies (v: 1)
SensitivityStudyPlans.pdf download>
Description: Study Plans for Sensitivity Studies
Type: Document (pdf)
Status: DRAFT
Contact
04/28/2008 Draft Planning Agenda (10.9.08) (v: 1)
Draft Agenda.pdf download>
Description: Draft Agenda for April 30, 2021 Meeting
Type: Agenda
Status: DRAFT
04/21/2008 Northern Mid C Agenda (4.22.08) (v: 2)
NMCST Agenda 4-22-08.pdf download>
Description: Draft Agenda for Initial Northern Mid-Columbia Transmission Meeting
Type: Agenda
Status: DRAFT
04/17/2008 Wanapum/Vantage-Midway Area 230 kV Tecnnical Report (v: 1)
request access > login >
Description: Wanapum/Vantage-Midway Area 230 kV Tecnnical Report - final version
Type: Report
Status: FINAL
Contact
04/17/2008 Mid C Needs Statement from System Assessmentt (v: 1)
request access > login >
Description: Mid-Columbia Needs Statement from 2008 System Assessment
Type: Document (pdf)
Status: DRAFT
Contact
04/17/2008 North of Wanapum/Vantage Kickoff (v: 1)
NorthWanVant_kickoff.pdf download>
Description: North of Wanapum/Vantage 230 kV Studies from BPA/Chelan/Grant Meeting - October 3, 2021
Type: Document (pdf)
Status: DRAFT
Contact
04/15/2008 Planning Report for Board 4.16.08 (v: 1)
PlanningReport(04.16.08).pdf download>
Description: Planning report includes system assessment report
Type: Presentation
Status: DRAFT
Contact
04/04/2021 PSAST Agenda (4.14.08) (v: 1)
PSASTAgenda041408.pdf download>
Description: Agenda
Type: Agenda
Status: DRAFT
Contact
04/04/2021 CG 2018 EHW Contingencies Consolidated_Comments (v: 7)
request access > login >
Description: CG 2018 EHW Contingencies Consolidated Comments
Type: Spreadsheet
Status: DRAFT
Contact
04/04/2021 CG 2018 HS Contingencies Consolidated Comments (v: 3)
request access > login >
Description: CG 2018 HS Contingencies Consolidated Comments
Type: Spreadsheet
Status: DRAFT
Contact
04/04/2021 CG 2018 HW Contingencies Consolidated_Comments (v: 12)
request access > login >
Description: CG 2018 HW Contingencies Consolidated Comments
Type: Spreadsheet
Status: DRAFT
Contact
03/19/2008 CG Planning Presentation (v: 1)
...ard Presentation(03.19.08).pdf download>
Description: CG Planning Presentation for Board Meeting
Type: Presentation
Status: FINAL
Contact
03/13/2008 Draft Planning Agenda (3.18.08) (v: 1)
BiennialMtgAgenda(3.18.08).pdf download>
Description: Meeting Agenda (3.18.08)
Type: Agenda
Status: DRAFT
03/13/2008 Issues to Address in Future Studies (3.14.08) (v: 1)
suesFutureStudies(3.18.08).pdf download>
Description: Issues to Address in Future Studies
Type:
Status: DRAFT
03/04/2021 CG 2018 HS Contingencies-AVA-Sno-Grant-BPA (v: 1)
request access > login >
Description: CG 2018 HS Contingencies AVA-Sno-Grant-BPA
Type: Spreadsheet
Status: DRAFT
Contact
03/03/2022 Report Schedule (v: 1)
Report Schedule.pdf download>
Description: Report Schedule
Type: Document (pdf)
Status: DRAFT
Contact
02/28/2008 Draft Planning Agenda (3.4.08) (v: 1)
BiennialPlanAgenda30408.pdf download>
Description: Draft Planning Agenda (3.4.08)
Type: Agenda
Status: FINAL
02/26/2008 WECC Acceptance Letter - Final (v: 1)
WOMGIP_RPR_final.pdf download>
Description: WECC accepts West of McNary Generation Integration Project Regional Planning Report
Type: Letter
Status: FINAL
Contact
02/26/2008 CG 2018 HW Contingencies (v: 10)
request access > login >
Description: CG 2018 HW Contingencies with comments
Type: Spreadsheet
Status: DRAFT
Contact
02/19/2008 BiennialPlanPlanningAssumptions (v: 1)
...nningAssumptions(02.20.08).pdf download>
Description: Biennial Plan Planning Assumptions
Type: Report
Status: FINAL
Contact
02/19/2008 Planning Report (v: 1)
Planningreport(2.20.08).pdf download>
Description: Planning Report for February 20, 2022
Type: Report
Status: FINAL
Contact
02/11/2021 Obligations Policy (v: 2)
...ations Policy (v2) 1-23-08.pdf download>
Description: Obligations Policy (v.2)
Type: Report
Status: DRAFT
Contact
02/11/2021 Draft Planning Agenda (2.14.08) (v: 1)
... Plan Group Agenda 2-14-08.pdf download>
Description: Draft Planning Agenda (2.14.08)
Type: Agenda
Status: FINAL
02/05/2021 WECC - STP Roles In Planning Presentation (v: 1)
CC - STP Roles in Planning.pdf download>
Description: WECC - STP Roles In Planning PDF
Type: Document (pdf)
Status: FINAL
Contact
01/28/2008 Draft Need Statement-Outline for Olympia Peninsula (v: Draft)
...tatement Olympia Peninsula.pdf download>
Description: Draft Need Statement Outline for the Olympia Peninsula
Type:
Status: DRAFT
Contact
01/28/2008 Draft Planning Agenda (1.30.08) (v: 1)
... Plan Group Agenda 1-30-08.pdf download>
Description: Draft Planning Agenda (1.30.08)
Type: Agenda
Status: FINAL
01/23/2008 1-5 Draft Report - Doc version (v: draft)
1-5 rptdraftdoc.doc download>
Description: 1-5 Draft Report without attachments - word document version for comment
Type: Report
Status: DRAFT
Contact
01/17/2008 PEFA First Amendment (v: signed)
PEFA Amendment(12.19.07).pdf download>
Description: Amendment to the PEFA
Type: Functional Agreement
Status: FINAL
Contact
01/15/2008 PlanningPresentation(01.16.08) (v: 1)
...ningPresentation(01.16.08).pdf download>
Description: Planning Presentation for Jan. 16, 2008 Board of Directors' Meeting (01.16.08).
Type: Presentation
Status: FINAL
Contact
01/08/2021 WECC Coordinated Planning and Technical Studies(Final) (v: 1)
...d Technical Studies(Final).pdf download>
Description: WECC Coordinated Plan and Technical Studies
Type: Report
Status: FINAL
Contact
01/08/2021 Combined Wind Projects - Draft (v: 1)
combinedwindprojects.pdf download>
Description: Wind projects, construction, pending, operating
Type: Document (pdf)
Status: DRAFT
Contact
01/08/2021 Upcoming ColumbiaGrid Studies (v: 1)
...oming ColumbiaGrid Studies.doc download>
Description: Upcoming ColumbiaGrid Studies
Type: Report
Status: DRAFT
Contact
01/08/2021 System Assessment Study Plan (v.4) 12-12 edits (v: 4)
...udy Plan (v.4) 12-12 edits.doc download>
Description: System Assessment Study Plan
Type: Report
Status: DRAFT
Contact
01/08/2021 Draft Planning Agenda (1.09.08) (v: 1)
... Plan Group Agenda 1-09-08.doc download>
Description: Draft Planning Agenda (1.09.08)
Type: Agenda
Status: FINAL
01/04/2021 PSAST Agenda (01.10.08) (v: draft)
11008_Draft_PSAST_Agenda.pdf download>
Description: Draft PSAST Agenda
Type: Agenda
Status: DRAFT
Contact
01/02/2022 WOMGIP Regional Planning Report 12.31.07 (v: v2)
...nning Report v2 (12.31.07).pdf download>
Description: West of McNary Generation Integration Project Regional Planning Compliance Report
to WECC
Type: Report
Status: FINAL
Contact
12/31/2007 WOMGIP Regional Planning Report - Letter to WECC (v: 2)
...rt Cover Letter (12.31.07).pdf download>
Description: WOMGIP Regional Planning Report - Letter to WECC -
Type:
Status: FINAL
Contact
12/18/2007 DRAFT WOM Regional Planning Review Group Report to WECC (12.18.07) (v: draft)
..._121807 to RPRG for review.doc download>
Description: DRAFT WOM Regional Planning Review Group Report to WECC
Type: Report
Status: DRAFT
Contact
12/18/2007 Sea Breeze Slide Presentation (12.12.07) (v: 1)
...r CG Biennial Planning Mtg.pdf download>
Description: Sea Breeze Slide Presentation for Biennial Planning Meeting (12.12.07)
Type: Presentation
Status: FINAL
Contact
12/14/2007 Biennial Planning Meeting-Action Items (12.12.07) (v: 1)
...ng-Action Items (12.12.07).pdf download>
Description: Act6ion Items from December 12, 2021 Meeting
Type:
Status: FINAL
Contact
12/12/2021 Tieline Flows (12.12.07) (v: 1)
Tieline Flows (12.12.07).xls download>
Description: Tieline Flows
Type: Spreadsheet
Status: DRAFT
Contact
12/12/2021 NW Gen Summary (12.12.07) (v: 1)
NW Gen Summary (12.12.07).xls download>
Description: NW Generation Summary - Participation Groups
Type: Spreadsheet
Status: DRAFT
Contact
12/12/2021 Contingency Results Comparions Summary (12.12.07) (v: 1)
...parions Summary (12.12.07).xls download>
Description: Contingency Results Comparions Summary
Type: Spreadsheet
Status: DRAFT
Contact
12/11/2021 Biennial Plan Report Outline (12.12.07) (v: 1)
... Report Outline (12.12.07).pdf download>
Description: Biennial Plan Report Outline
Type:
Status: DRAFT
Contact
12/11/2021 System Assessment Study Plan (v 3) 11.20.07 edits (v: 3)
...udy Plan (v 3) 11-20 edits.pdf download>
Description: System Assessment Study Plan 11-20-07 edits
Type: Report
Status: DRAFT
Contact
12/11/2021 120407 Winter_2008_Nomo_Analysis (v: 1)
... Winter_2008_Nomo_Analysis.zip download>
Description: Winter 2008 Nomogram Analysis for TRCM Discussion
Type: Spreadsheet
Status: FINAL
Contact
12/11/2021 Draft Planning Agenda (12.12.07) (v: 2)
... Group Agenda 12-12-07 (2).pdf download>
Description: Draft Planning Agenda (12.12.07)
Type: Agenda
Status: FINAL
12/07/2021 GIANT Projects Study Plan (12.7.07 Draft) (v: 1)
...rojects Study Plan 12-7-07.pdf download>
Description: GIANT Projects Study Plan 12-7-07
Type: Presentation
Status: DRAFT
Contact
12/07/2021 Wind Integration Study Plan (12.7.07 draft) (v: 1)
...gration Study Plan 12-7-07.pdf download>
Description: Wind Integration Study Plan 12-7-07
Type: Presentation
Status: DRAFT
Contact
12/07/2021 Upcoming ColumbiaGrid Studies (12.7.07) (v: 2 )
...lumbiaGrid Studies 12-7-07.pdf download>
Description: Upcoming ColumbiaGrid Studies 12-7-07 draft
Type: Report
Status: DRAFT
Contact
11/28/2007 Draft Study Plan (12.04.07) (v: 2)
...Draft_Study_Plan_version_2.pdf download>
Description: Draft Study Plan v.2
Type: Report
Status: DRAFT
Contact
11/19/2007 Draft Planning Agenda (11.20.07) (v: final)
... Group Agenda 11-20-07 (2).pdf download>
Description: Draft Planning Agenda (11.20.07)
Type: Agenda
Status: FINAL
11/19/2007 PSASG Update Report (Final 11.16.07) (v: final)
...Report_2007 Nov 16 _Final_.pdf download>
Description: PSASG Update Report November 16, 2021 (Final)
Type: Report
Status: FINAL
Contact
11/19/2007 System Assessment Study Plan (11-15-07) (v: 1)
...sment Proposal 11-15 edits.pdf download>
Description: System Assessment Study Plan 11-15
Type: Report
Status: DRAFT
Contact
11/19/2007 Upcoming ColumbiaGrid Studies (v: 1)
...oming ColumbiaGrid Studies.pdf download>
Description: Upcoming ColumbiaGrid Studies
Type: Spreadsheet
Status: FINAL
Contact
11/14/2007 Treasurer's Report - PEFA Monthly Report (v: 1)
...A Monthly Report 11.14.07).pdf download>
Description: PEFA Monthly Report
Type: Financial
Status: FINAL
Contact
11/14/2007 Planning Activites Report (v: 1)
...ctivites Report (11.14.07).pdf download>
Description: Planning Activites Report
Type: Report
Status: FINAL
Contact
11/14/2007 Regional Projects with Impacts on ColGrid Facilities (v: 3)
...olumbiaGrid Facilities (3).pdf download>
Description: This list and analysis was developed from information available to ColumbiaGrid as of Oct 2007
Type: Report
Status: FINAL
Contact
11/06/2021 Base Case Load Levels (v: 1)
basecase load levels.pdf download>
Description: Base Case Load Levels
Type: Spreadsheet
Status: FINAL
Contact
11/06/2021 System Assessment Proposal (10.16.07 edits) (v: 2)
...t Proposal 10-16 edits (2).pdf download>
Description: System Assessment Proposal 10-16-07 edits
Type: Report
Status: DRAFT
Contact
10/29/2007 Attachment K Tech Conf Presentation - ColumbiaGrid (10.24.07) (v: final)
...tion - CG final (10 24 07).pdf download>
Description: Attachment K Technical Conference Presentation for ColumbiaGrid
Type: Presentation
Status: FINAL
Contact
10/22/2007 Attachment K Presentation - BPA final (10.22.07) (v: 2)
...ent K Presentation BPA (2).ppt download>
Description: Attachment K Presentation - BPA final(10.22.07)
Type: Presentation
Status: FINAL
10/22/2007 Attachment K Presentation Final - Avista (10.22.07) (v: Final)
... - Avista (10.22.07 final).pdf download>
Description: Attachment K
Type: Presentation
Status: FINAL
10/22/2007 Attachment K Presentation Final - TPWR (10.22.07) (v: Final)
...n - TPWR (10.22.07 final).pdf download>
Description: Attachment K presentation by Tacoma Power
Type: Presentation
Status: FINAL
10/22/2007 Attachment K Presentation Final - PSE (10.22.07) (v: 2)
...n - Puget (10.22.07 final).pdf download>
Description: Attachment K
Type: Presentation
Status: FINAL
10/19/2007 Puget Sound Energy PS Projects (10.18.07) (v: 1)
...rgy PS Projects (10.18.07).pdf download>
Description: Puget Sound Energy PS Projects (10.18.07).
Type: Presentation
Status: FINAL
10/16/2007 PEFA Quarterly Report (v: 1)
PEFA Quarterly Report.pdf download>
Description: Planning and Expansion Funding Agreement (PEFA) Quarterly Report
Type: Financial
Status: FINAL
Contact
10/16/2007 PSAST Agenda (10.18.07) (v: 2)
101807_Draft_Agenda_rev. 4.doc download>
Description: PSAST Agenda (10.18.07)
Type: Agenda
Status: FINAL
Contact
10/16/2007 BPA's Puget Sound Area Studies (v: 1)
... CG_PSASG101807_bkt wo map.ppt download>
Description: Overview and purpose of studies
Type: Presentation
Status: FINAL
10/16/2007 PSANI Re-Dispatch Agreement (v: 1)
...SANI_Re-Dispatch_Agreement.ppt download>
Description: Overview of the PSA Generation Redispatch Agreement
Type: Report
Status: DRAFT
10/16/2007 Risk Assessment for PSA (v: 1)
... 4 _Conger_Risk_Assessment.ppt download>
Description: Presentation/discussion of alternative RA methods that might be applicable to the PSA studies (probabilistic methods, TCRM, etc.)
Type: Presentation
Status: FINAL
10/16/2007 Transmission Adequacy Guidelines (v: 1)
...delines_-_2007_10_18_(GDM).ppt download>
Description: Presentation/discussion of the application of the NTAC TA Guidelines to the PSA. Identify and begin discussion of the issues.
Type: Presentation
Status: FINAL
10/16/2007 Draft PSASG Update Report (v: zipped)
...ate Report_11 Oct 2007.zap.zip download>
Description: Draft PSASG Update Report zipped (for ease of viewing and printing)
Type: Report
Status: FINAL
10/12/2021 Draft PSASG Update Report (v: 1)
..._Update_Report_2007_Oct_11.pdf download>
Description: Draft update to the 2004 Puget Sound Area Study Group Report: Assessment of Puget Sound Area/Northern Intertie Curtailment Risk
Type: Report
Status: FINAL
Contact
10/12/2021 Beverly Study July 2007 (v: 1)
...dyJuly_2007_final_draft JM.pdf download>
Description: Final draft of the Beverly Park project identified in the TPC Reliability Assessment of the NW Transmission System ("RANTS") report. This study reviews facility options to address future District load growth issues. One of the projects includes a 115-230kV transformer installation at the District Beverly Park switching station.
Type: Report
Status: FINAL
10/11/2021 PSAST Agenda (10.18.07) (v: 1)
101807_Draft_Agenda_rev 3.doc download>
Description: PSAST Agenda (10.18.07)7
Type: Agenda
Status: FINAL
Contact
10/05/2021 Draft Planning Agenda (10.09.07) (v: 1)
... Plan Group Agenda 10-9-07.doc download>
Description: Draft Planning Agenda (10.09.07)
Type: Agenda
Status: FINAL
10/05/2021 Report Outlines (v: 1)
Report Outlines.doc download>
Description: System Assessment Report Outline
Type: Report
Status: FINAL
Contact
10/05/2021 System Assessment Proposal (v: 1)
... Study Plan 9-26 edits v.1.doc download>
Description: System Assessment Proposal
Type: Report
Status: DRAFT
Contact
10/04/2021 ColumbiaGrid Initial Transmission Plan (10.04.07) (v: 2)
...ssion Plan 10-4-2021 (v.2).xls download>
Description: Regional projects with a high level assessment of their impact to ColumbiaGrid facilities are summarized in (link). This summary includes projects proposed by others that might have impact on ColumbiaGrid facilities. This list was collected by ColumbiaGrid from available information. Comments are welcome.
Type: Spreadsheet
Status: DRAFT
Contact
09/27/2007 WOM 4500 Path Flows Comparison( 9.27.07) (v: 1)
...Flows Comparison( 9.27.07).pdf download>
Description: WOM 4500 Path Flows Comparison( 9.27.07) BPA
Type: Spreadsheet
Status: FINAL
Contact
09/25/2007 ColumbiaGrid Planning Areas Diagram (9.26.07) (v: 1)
...rid Planning Areas Diagram.pdf download>
Description: ColumbiaGrid Planning Areas Diagram
Type: Map
Status: FINAL
Contact
09/25/2007 2007 System Assessment Proposal (v: 1)
stem Assessment Study Plan.pdf download>
Description: 2007 System Assessment Proposal
Type:
Status: DRAFT
Contact
09/24/2007 Draft PSASG Update Report (v: 1)
...G_Update_Report_2007-09-19.pdf download>
Description: Draft PSASG Update Report, PSAST 9-24-2007 Mtg - Dobson-Mack
Type: Report
Status: DRAFT
Contact
09/24/2007 Nomogram Challenges (v: 1)
..._Combined_Nomogram_Example.ppt download>
Description: Winter 2007 Nomogram PSAST 9-24-2007 Agenda Item 3 - Dobson-Mack
Type: Presentation
Status: FINAL
Contact
09/24/2007 PSASG Project Update Report (v: 1)
... P. - PSASG_Project_Update.ppt download>
Description: Puget Sound Area Projects Update - PSAST 9-24-2007 Agenda Item 3 - Phillips
Type: Report
Status: FINAL
Contact
09/24/2007 PSAST Agenda (9.24.07) (v: 2)
...SA Study Team 083007 final.doc download>
Description: Final Agenda
Type: Agenda
Status: FINAL
Contact
09/24/2007 BPA TBL Operating Concerns - (v: 1)
...y Jackson presentation_07.ppt download>
Description: BPA TBL Operating Concerns
9-24-2007 PSAST Mtg Agenda Item 2 - Phillips
Type: Presentation
Status: FINAL
Contact
09/24/2007 NI OTC Uncertainty Challenges (v: 1)
...__OTC_Uncertainty_Examples.xls download>
Description: NI OTC uncertainty challenges PSA Mtg 9-24-2007 Agenda Item 2 - Gordon
Type: Presentation
Status: FINAL
Contact
09/24/2007 Puget Sound Area Northern Intertie Transmission History (v: 1)
...nd_Area_Northern_Intertie2.ppt download>
Description: Puget Sound Area Northern Intertie Transmission History PSA Mtg 9-24-07 Agenda Item 3 - Martinsen
Type: Presentation
Status: FINAL
Contact
09/24/2007 Outage Scheduling Challenges - Summer 2007 & Beyond (v: 1)
..._Outage_Presentation ver 2.ppt download>
Description: Outage Challenges Summer 2006 & Beyond - PSAST Mtg 9-24-2007 Agenda Item 2-Conger -
Type: Presentation
Status: FINAL
Contact
09/23/2007 NI Curtailment Risk Assessment (v: 1)
...ssessment_-_GDM_2007-09-24.ppt download>
Description: PEFA/Puget Sound/092407 Agenda Item 3 - Dobson-Mack NI_Curtailment_Risk_Assessment_-_GDM_2007-09-24.ppt
Type: Presentation
Status: FINAL
Contact
09/20/2007 CG Planning Report (9.19.07) (v: 1)
g-planning-report-19sept07.pdf download>
Description: CG Planning Report (9.19.07)
Type: Presentation
Status: FINAL
Contact
09/20/2007 Draft Planning Agenda (9.26.07) (v: 1)
...nning Group Agenda 9-26-07.pdf download>
Description: Draft Planning Agenda (9.26.07)
Type: Agenda
Status: FINAL
09/20/2007 2007 System Assessment Proposal (v: 1)
...System Assessment Proposal.pdf download>
Type: Document (pdf)
Status: DRAFT
Contact
09/14/2007 PSAST Agenda (9.24.07) (v: 1)
...ff Meeting 09242007 Agenda.pdf download>
Description: Proposed Agenda for Puget Sound Area Study Team Kick Off Meeting on 9/24/2007 at Puget Sound Energy Offices
Type: Agenda
Status: DRAFT
Contact
09/05/2021 General Planning Areas Description (v: 1)
...Planning Areas Description.pdf download>
Description: General Planning Areas Description
Type: Report
Status: FINAL
Contact
02/02/2022 Planning and Expansion Functional Agreement FERC Filing (v: Accepted for filing by FERC)
...onal Agreement FERC Filing.pdf download>
Description: Includes the filing letter to the FERC
Type: Functional Agreement
Status: FINAL