Study Team: West of McNary Reinforcement (WOMR)

West of McNary Reinforcement (WOMR) Overview

The Bonneville Power Administration (BPA) is seeking an Accepted Rating for the West of McNary (WOM), West of Slatt (WOS) and West of John Day (WOJ) paths due to the West of McNary Reinforcement (WOMR) Project.  The WOMR Project will increase transfer capability across the WOM, WOS and WOJ paths which will enable BPA to provide transmission service for proposed renewable energy from the Lower Snake River, McNary and Lower Columbia Basin areas to the Northwest (NW) load centers west of the Cascade Mountains and to the California – Oregon AC Intertie (COI) and the Pacific DC Intertie (PDCI).  Based on historical data, the flows on these paths peak during heavy summer loading conditions.
 
The West of McNary project is currently going through the Phase 2 Rating process via the WECC Technical Study Coordination Group.

 

Timeframe: Phase 2

Status: Active

Lead Staff:
Jonathan Young   Contact

Documents
01/08/2021 WOMR Phase 2B Aux Files (v: 1)   

request access >  login >

 

12/18/2013 WOMR PRG Basecases PowerWorld (v: 12_17_13)   

request access >  login >

 

12/18/2013 WOMR PRG Basecases PSLF (v: 12_17_13)   

request access >  login >

 

12/18/2013 WOMR Phase 2 Final Study Plan (v: 12_16_13)   

request access >  login >

 

12/12/2021 WOMR Phase 2 PRG Agenda (12.13.13) (v: 12_13_2013)   

request access >  login >

 

11/27/2013 WOMR Study Plan and PowerWorld basecases (v: 11_27b)   

request access >  login >

 

11/27/2013 WOMR GE PSLF basecases (v: 11_27)   

request access >  login >

 

11/20/2013 WOMR Phase 2 Study Plan and Nov 21 Meeting Materials (v: 11_20)   

request access >  login >

 

09/16/2013 West of McNary Reinforcement PRG Base Case Files PowerWorld (v: 9_16)   

request access >  login >

 

09/16/2013 West of McNary Reinforcement PRG Base Case Files PSLF (v: 9_16)   

request access >  login >

 

09/16/2013 West of McNary Reinforcement (WOMR) Draft Study Plan (v: 9_13)   

request access >  login >

 

09/16/2013 WOMR Phase 2A Kickoff Meeting Notes (v: 8_2)   

request access >  login >