Study Team: Northern Mid C Joint Operational Study Team

Northern Mid C Joint Operational Study Team Overview

The Northern Mid Columbia (NMC) Joint Project is intended to mitigate the impacts of the Douglas PUD and Grant PUD projects, however, the NMC Joint Project will not be energized until after the Douglas and Grant projects have been put into service. The Northern Mid Columbia Joint Operational Study Team has been formed to address the operational implications of this sequencing as well as other unanticipated operational issues, if any. The study team shall coordinate joint operational studies and recommend to the Parties interim operational limits or interim operational procedures. This study team will be guided by the following principles:

  1. Assure that the impact(s) of the completed project(s) on the interconnected systems are at levels acceptable to the Parties owning the affected asset(s) until the remaining project(s) are completed;
  2. Avoid exacerbating the interconnected system conditions that the preferred plan of service is intended to mitigate; and
  3. Assure that all recommendations are consistent with applicable regulatory requirements and standards and Good Utility Practices.

 

Timeframe:

Status: Active

Lead Staff:
Larry Furumasu   Contact

Documents
04/25/2014 N-1 JOPST Table (v: 1)   

confidentiality agreement required >

 

04/16/2014 NMCJOST Contingency Spreadsheet (v: 4_16)   

request access >  login >

 

03/17/2014 NMC_2014_StudyCase (v: 3_17)   

request access >  login >

 

03/07/2021 NMC_2014_AuxFiles (v: 3_7)   

request access >  login >

 

08/23/2013 BPA NOH Limit Study att 1 (v: 1)   

request access >  login >

 

08/23/2013 BPA NOH Limit Study att 2 (v: 1)   

request access >  login >

 

08/23/2013 BPA NOH Limit Study att 3 (v: 1)   

request access >  login >

 

08/23/2013 BPA NOH Limit Study att 4 (v: 1)   

request access >  login >

 

07/03/2022 NMCJOST 2018HS study cases (v: 7_3)   

request access >  login >

 

04/29/2013 NMCJOST Study Iteration (v: 4_29)   

request access >  login >

 

04/18/2013 NMCJOST Study Iteration Version 16 (v: 4_18)   

request access >  login >

 

02/08/2021 NMCJOST_StudyCases (v: 2_8)   

request access >  login >

 

02/05/2021 NMCJOST 13HS2 Change Files (v: 2_5)   

request access >  login >

 

02/05/2021 NMCJOST_ContingencyResultsWorstOutages (v: 2_5)   

request access >  login >

 

02/05/2021 NMCJOST_ContingencyResultsComplete (v: 2_5)   

request access >  login >

 

01/14/2013 NMCJOST 13HS2 Contingency Files (v: 2)   

request access >  login >

 

12/13/2012 Mid C Joint Operational Study Plan (v: 1)   

d C Operations Study Plan.docx   download>