Search Documents

Please note - this section requires that you ALLOW pop-ups and cookies. Please turn your pop-up blocker OFF, and ensure that your browser allows cookies.

 

SEARCH DOCUMENTS

Keyword:
Start Date:  
End Date:  
Type:
Working or Final:
Open For Comment:
Event:
Program:
Project:
Workgroup/Study Team:
Records Per Page
  Show All Versions for each Document



2801 - 2820 out of 3916.
More Results: 1   2   3   4   5   6   7   8   9   10   11   12   13   14   15   16   17   18   19   20  
21   22   23   24   25   26   27   28   29   30   31   32   33   34   35   36   37   38   39   40  
41   42   43   44   45   46   47   48   49   50   51   52   53   54   55   56   57   58   59   60  
61   62   63   64   65   66   67   68   69   70   71   72   73   74   75   76   77   78   79   80  
81   82   83   84   85   86   87   88   89   90   91   92   93   94   95   96   97   98   99   100  
101   102   103   104   105   106   107   108   109   110   111   112   113   114   115   116   117   118   119   120  
121   122   123   124   125   126   127   128   129   130   131   132   133   134   135   136   137   138   139   140  
141   142   143   144   145   146   147   148   149   150   151   152   153   154   155   156   157   158   159   160  
161   162   163   164   165   166   167   168   169   170   171   172   173   174   175   176   177   178   179   180  
181   182   183   184   185   186   187   188   189   190   191   192   193   194   195   196  

08/31/2010 Board Minutes (06.16.10) (v: 1)   

BoardMinutes(06.16.10).doc   download>
Description: Board Minutes (06.16.10)
Type: Minutes
Status: FINAL
Contact

 

08/31/2010 Attendence Sheet (8.18.10) (v: 1)   

Attendence Sheet (8.18.10).pdf   download>
Description: Attendence Sheet (8.18.10)
Type: Attendence Sheets
Status: FINAL
Contact

 

08/27/2010 PSAST Agenda (9.28.10) (v: 1)   

PSAST_Sept28_Agenda.pdf   download>
Description: PSAST Agenda 9.28.10
Type: Agenda
Status: DRAFT
Contact

 

08/26/2010 Failed Powerflow Solution Investigation (v: 1)   

request access >  login >
Type: Report
Status: DRAFT
Contact

 

08/25/2010 Invitation to webDynamic Scheduling System Demo (8.25.10) (v: 1)   

...bDynamiSchedulinSystemDemo.pdf   download>
Description: Invitation to webDynamic Scheduling System Demo
Type: Notice
Status: FINAL

 

08/25/2010 GE Display Settings (v: 1)   

GE Display Settings.aux   download>
Description: PowerWorld Auxiliary file that sets display settings for viewing GE data
Type: PowerWorld Auxiliary File
Status: DRAFT
Contact

 

08/25/2010 Delete GE Flagged Aux File (v: 1)   

DeleteGEflagged.aux   download>
Description: This PowerWorld Auxiliary file deletes all records tagged with a status of -4.
Type: PowerWorld Auxiliary File
Status: DRAFT
Contact

 

08/25/2010 Automatic Area Coordinator Aux File (v: 1)   

... Area Coordinator Aux File.aux   download>
Description: File to be automatically loaded by PowerWorld Simulator whenever a case is opened. Specify this file in PowerWorld under PowerWorld Simulator Options\File Management\PowerWorld Files
Type: PowerWorld Auxiliary File
Status: DRAFT
Contact

 

08/24/2010 PSAST Traditional Power Flow Files (5.1 MB .zip file) (v: 1)   

request access >  login >
Description: Traditional power flow files for Puget Sound Area Study Team
Type: Base Case
Status: DRAFT
Contact

 

08/19/2010 Fourth Funding Agreement (8.18.10) (v: 1)   

Fourth Funding Agreement.pdf   download>
Description: Fourth Funding Agreement (8.18.10);
Type: Funding Agreement
Status: FINAL
Contact

 

08/18/2010 Open Season Presentation (v: 1)   

Open Season (08.18.10).pdf   download>
Description: Open Season Presentation
Type: Presentation
Status: DRAFT
Contact

 

08/17/2010 Joint Initiative (08.18.10) (v: 1)   

oint Initiative (08.18.10).pdf   download>
Description: Joint Initiative (08.18.10)
Type: Presentation
Status: FINAL
Contact

 

08/17/2010 Transmission Planning Update (08.18.10) (v: 1)   

...Planning Update (08.18.10).pdf   download>
Description: Transmission Planning Update (08.18.10)
Type: Presentation
Status: FINAL
Contact

 

08/17/2010 Treasurer's Report - August 18. 2010 (v: 1)   

Treasurer's Report.pdf   download>
Description: Treasurer's Report (8.18.10)
Type: Financial
Status: FINAL

 

08/16/2010 SCG Foundational Txn Project List (08.18.10) (v: 1)   

...xn Project List (08.18.10).pdf   download>
Description: SPG Coordination Group (SCG) Foundational Transmission Project List
Type: Document (pdf)
Status: FINAL

 

08/16/2010 Open Season PowerPoint Presentation (v: 1)   

CGOpenSeasonNTTG.ppt   download>
Description: Open Season PowerPoint Presentation
Type: Presentation
Status: DRAFT

 

08/16/2010 Draft Open Season Agenda (8.16.10) (v: 1)   

8 16 10 Proposed Agenda.pdf   download>
Description: Draft Open Season Agenda (8.16.10); Proposed Agenda (8.16.10)
Type: Agenda
Status: FINAL
Contact

 

08/16/2010 RNP PTSA Terms Condtions [notes 31510 meeting] (8.16.10) (v: 1)   

...msCondtions(notes31510mtg).doc   download>
Description: RNP PTSA Terms Condtions (notes 31510mtg) 8.16.10
Type: Notes
Status: FINAL
Contact

 

08/16/2010 3 15 10 Open Season Proposal (Outline) (8.16.10) (v: 1)   

... Season Proposal (Outline).doc   download>
Description: 3 15 10 Open Season Proposal (Outline)
Type:
Status: FINAL
Contact

 

08/04/2021 Board Agenda (08.18.10) (v: 1)   

BoardAgenda(08.18.10).doc   download>
Description: Board Agenda (08.18.10)
Type: Agenda
Status: FINAL
Contact

 


WHAT OUR MEMBERS SAY

Member: Chelan County PUD      Project: ColumbiaGrid     
Chelan County PUD

"Chelan PUD is a strong supporter of ColumbiaGrid and the work that’s accomplished through the transmission Planning and Expansion Functional Agreement (PEFA). As a result of that process, the mid-C utilities (Chelan, Grant and Douglas PUDs) and Bonneville Power Administration were able to reach an agreement that defined the need for a new transmission line, as well as determine who will construct, own and pay for the facility. Those difficult decisions were made successful through the expert and independent expertise of the ColumbiaGrid staff."
~~ Chad Bowman, Director - Transmission and Compliance