Search Documents

Please note - this section requires that you ALLOW pop-ups and cookies. Please turn your pop-up blocker OFF, and ensure that your browser allows cookies.

 

SEARCH DOCUMENTS

Keyword:
Start Date:  
End Date:  
Type:
Working or Final:
Open For Comment:
Event:
Program:
Project:
Workgroup/Study Team:
Records Per Page
  Show All Versions for each Document



3381 - 3400 out of 3939.
More Results: 1   2   3   4   5   6   7   8   9   10   11   12   13   14   15   16   17   18   19   20  
21   22   23   24   25   26   27   28   29   30   31   32   33   34   35   36   37   38   39   40  
41   42   43   44   45   46   47   48   49   50   51   52   53   54   55   56   57   58   59   60  
61   62   63   64   65   66   67   68   69   70   71   72   73   74   75   76   77   78   79   80  
81   82   83   84   85   86   87   88   89   90   91   92   93   94   95   96   97   98   99   100  
101   102   103   104   105   106   107   108   109   110   111   112   113   114   115   116   117   118   119   120  
121   122   123   124   125   126   127   128   129   130   131   132   133   134   135   136   137   138   139   140  
141   142   143   144   145   146   147   148   149   150   151   152   153   154   155   156   157   158   159   160  
161   162   163   164   165   166   167   168   169   170   171   172   173   174   175   176   177   178   179   180  
181   182   183   184   185   186   187   188   189   190   191   192   193   194   195   196   197  

03/11/2021 Approved - 2009 Biennial Transmission Expansion Plan (v: 2)   

transmissionplan2.pdf   download>
Description: Approved 2009 Biennial Transmission Expansion Plan
Type: Report
Status: FINAL
Contact

 

02/02/2022 01.29.09 Dynamic Scheduling System v0 009 clean (v: 1)   

...duling System v0 009 clean.pdf   download>
Description: 01.29.09 Dynamic Scheduling System v0 009 clean
Type: Report
Status: FINAL

 

01/30/2009 ContingencyAnalysisAuxFiles (v: 1)   

request access >  login >
Description: ContingencyAnalysisAuxFiles
Type: Base Case
Status: DRAFT
Contact

 

01/30/2009 ITAP outline pd comments clean (01.30.09 ) (v: 1)   

...ine013009 pdcomments clean.pdf   download>
Description: I-TAP outline comments clean 1.30.09
Type: Document (pdf)
Status: DRAFT
Contact

 

01/29/2009 Study Request to TEPPC 2009 (v: 1)   

tudy Request to TEPPC 2009.pdf   download>
Description: Study Request to TEPPC 2009
Type: Letter
Status: DRAFT
Contact

 

01/28/2009 2008 NOS Reg Eco Benefit_CG Briefing (v: 1)   

...eg Eco Benefit_CG Briefing.pdf   download>
Description: 2008 NOS Reg Eco Benefit_CG Briefing
Type: Presentation
Status: FINAL

 

01/28/2009 2008 NOS Recommendation_CG Briefing v1 (v: 1)   

...ommendation_CG Briefing v1.pdf   download>
Description: 2008 NOS Recommendation_CG Briefing v1
Type: Presentation
Status: FINAL

 

01/28/2009 Base Case Quality Assurance (v: 1)   

BaseCaseQualityAssurance.pdf   download>
Description: Base Case Quality Assurance
Type: Presentation
Status: DRAFT
Contact

 

01/27/2009 Joint Initiative Think Tank Presentation final ver1 (1 27 09) (v: 1)   

...nk Presentation final ver1.pdf   download>
Description: Joint Initiative Think Tank Presentation final ver1 (1 27 09)
Type: Presentation
Status: FINAL

 

01/26/2009 Attend Steet (1.21.09) (v: 1)   

Attend Steet (1.21.09).pdf   download>
Description: Attend Steet (1.21.09)
Type: Attendence Sheets
Status: FINAL
Contact

 

01/23/2009 01.21.09 Dynamic Scheduling System v0 008 (v: 1)   

...c Scheduling System v0 008.pdf   download>
Description: 01.21.09 Dynamic Scheduling System v0 008
Type: Report
Status: DRAFT

 

01/22/2009 Trans Srvc Request Common Queue Phased Approach (01.23.09) (v: 1)   

...mmon Queue Phased Approach.pdf   download>
Description: Long Term Transmission Serrvice Request Common Queue Phased Approach
Type: Document (pdf)
Status: FINAL
Contact

 

01/22/2009 Work Plan for OASIS (01.23.09) (v: 1)   

Work Plan for OASIS.pdf   download>
Description: Work Plan for OASIS
Type: Timelines
Status: FINAL
Contact

 

01/22/2009 Oasis Draft Agenda (01.23.09) (v: 1)   

Proposed Agenda (01.23.09).pdf   download>
Description: Proposed Agenda (01.23.09).
Type: Agenda
Status: FINAL

 

01/20/2009 Board Agenda (1.21.09) (v: 1)   

BoardAgenda(1.21.09)2.pdf   download>
Description: Board Agenda (1.21.09)
Type: Agenda
Status: FINAL

 

01/20/2009 Planning Update on 2009 Plan (01.21.09) (v: 1)   

...te on 2009 Plan (01.21.09).pdf   download>
Description: Planning Update on 2009 Plan (01.21.09)
Type: Presentation
Status: FINAL
Contact

 

01/26/2009 Draft Planning Agenda (1.29.09) (v: 2)   

...nning Agenda (1-29-09) (2).pdf   download>
Description: Draft Planning Agenda (1.29.09)
Type: Agenda
Status: DRAFT
Contact

 

01/14/2009 PSAST Agenda (1.27.09) (v: 1)   

PSAST Agenda (1.27.09).pdf   download>
Description: PSAST Agenda (1.27.09)
Type: Agenda
Status: FINAL
Contact

 

01/14/2009 1.14.09 Final Within-Hour Schedule and Purchase Business Practices White Paper (v: 1)   

...ness Practices White Paper.pdf   download>
Description: 1.14.09 Final Within-Hour Schedule and Purchase Business Practices White Paper
Type: Document (pdf)
Status: FINAL
Contact

 

01/12/2021 Fluid Dynamic Scheduler (1.08.09)v4.redline (v: 1)   

1.pdf   download>
Description: Fluid Dynamic Scheduler (1.08.09) v4.redline)
Type: Report
Status: DRAFT

 


WHAT OUR MEMBERS SAY

Member: Chelan County PUD      Project: ColumbiaGrid     
Chelan County PUD

"Chelan PUD is a strong supporter of ColumbiaGrid and the work that’s accomplished through the transmission Planning and Expansion Functional Agreement (PEFA). As a result of that process, the mid-C utilities (Chelan, Grant and Douglas PUDs) and Bonneville Power Administration were able to reach an agreement that defined the need for a new transmission line, as well as determine who will construct, own and pay for the facility. Those difficult decisions were made successful through the expert and independent expertise of the ColumbiaGrid staff."
~~ Chad Bowman, Director - Transmission and Compliance