SEARCH DOCUMENTS
3801 - 3820 out of 3916.
More Results: 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40
41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60
61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80
81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100
101 102 103 104 105 106 107 108 109 110 111 112 113 114 115 116 117 118 119 120
121 122 123 124 125 126 127 128 129 130 131 132 133 134 135 136 137 138 139 140
141 142 143 144 145 146 147 148 149 150 151 152 153 154 155 156 157 158 159 160
161 162 163 164 165 166 167 168 169 170 171 172 173 174 175 176 177 178 179 180
181 182 183 184 185 186 187 188 189 190 191 192 193 194 195 196
01/24/2008 2018 Heavy Winter PTI Case (v: 14)
request access > login >
Description: 2018 Heavy Winter Planning Case. Developed from WECC 2017HW1 case, with load and topology additions from ColumbiaGrid participants and PacifiCorp and Portland General Electric. The PowerWorld version of the case was saved as a PSS/E version 30 raw file to create this version.
A confidentiality agreement and password are required.
Type: Base Case
Status: FINAL
Contact
01/24/2008 2018 Heavy Winter GE Case (v: 14)
request access > login >
Description: 2018 Heavy Winter Planning Case. Developed from WECC 2017HW1 case, with load and topology additions from ColumbiaGrid participants and PacifiCorp and Portland General Electric. The PowerWorld version of the case was saved as an epc file to create this version. That epc file was then saved as a solved .sav file.
A confidentiality agreement and password are required.
Type: Base Case
Status: FINAL
Contact
11/28/2007 Draft Study Plan (12.04.07) (v: 2)
...Draft_Study_Plan_version_2.pdf download>
Description: Draft Study Plan v.2
Type: Report
Status: DRAFT
Contact
01/24/2008 2018 Heavy Winter PowerWorld Case (v: 14)
request access > login >
Description: 2018 Heavy Winter Planning Case. Developed from WECC 2017HW1 case, with load and topology additions from ColumbiaGrid participants and PacifiCorp and Portland General Electric.
A confidentiality agreement and password are required.
Type: Base Case
Status: FINAL
Contact
11/14/2007 Planning Activites Report (v: 1)
...ctivites Report (11.14.07).pdf download>
Description: Planning Activites Report
Type: Report
Status: FINAL
Contact
11/13/2007 Visibility Overview - Westwide System Model (v: 1)
11.13.07 wsm.pdf download>
Description: Westwide System Model
Type: Presentation
Status: FINAL
Contact
11/13/2007 Redispatch Report for BPA (v: 1)
...07 RedispatchlReportforBPA.pdf download>
Description: Redispatch Report for BPA
Type: Report
Status: FINAL
Contact
11/14/2007 Treasurer's Report - Funding Agr Monthly Report (v: 1)
... Monthly Report (11.14.07).pdf download>
Description: Funding Agreement Monthly Report
Type: Financial
Status: FINAL
Contact
11/14/2007 Treasurer's Report - PEFA Monthly Report (v: 1)
...A Monthly Report 11.14.07).pdf download>
Description: PEFA Monthly Report
Type: Financial
Status: FINAL
Contact
11/14/2007 Treasurer's Report - DSRFA Monthly Report (v: 1)
... Monthly Report (11.14.07).pdf download>
Description: DSRFA Monthly Report
Type: Financial
Status: FINAL
Contact
11/13/2007 11.13.07 ADI Report (v: 1)
11.13.07 ADIreport.pdf download>
Type: Report
Status: FINAL
Contact
11/13/2007 11.13.07 ADI results (v: 1)
11.13.07 ADIresults.pdf download>
Description: ADI results
Type: Report
Status: FINAL
Contact
11/13/2007 11.13.07 ADI status (v: 1)
11.13.07ADIstatus.pdf download>
Description: ADI status
Type: Report
Status: FINAL
Contact
09/27/2007 WOM 4500 Path Flows Comparison( 9.27.07) (v: 1)
...Flows Comparison( 9.27.07).pdf download>
Description: WOM 4500 Path Flows Comparison( 9.27.07) BPA
Type: Spreadsheet
Status: FINAL
Contact
11/08/2021 Board Meeting Notice (11.14.07) (v: 1)
... Meeting Notice (11 14 07).pdf download>
Description: November 14, 2021 Board Meeting Notice
Type: Notice
Status: FINAL
Contact
11/08/2021 Board Agenda (11.14.07) (v: 1)
... Meeting Agenda (11 14 07).pdf download>
Description: Board Meeting Agenda
Type: Agenda
Status: FINAL
11/08/2021 Reliability Agenda (11.13.07) (v: 1)
...ability Small Group Agenda.pdf download>
Description: Reliability Agenda (11.13.07)
Type: Agenda
Status: FINAL
Contact
11/06/2021 System Assessment Proposal (10.16.07 edits) (v: 2)
...t Proposal 10-16 edits (2).pdf download>
Description: System Assessment Proposal 10-16-07 edits
Type: Report
Status: DRAFT
Contact
11/06/2021 Base Case Load Levels (v: 1)
basecase load levels.pdf download>
Description: Base Case Load Levels
Type: Spreadsheet
Status: FINAL
Contact
11/06/2021 Board Meeting Minutes (10.17.07) (v: 1)
...Meeting Minutes (10.17.07).pdf download>
Description: Board Meeting Minutes (10.17.07).
Type: Minutes
Status: FINAL
Contact