Search Documents

Please note - this section requires that you ALLOW pop-ups and cookies. Please turn your pop-up blocker OFF, and ensure that your browser allows cookies.

 

SEARCH DOCUMENTS

Keyword:
Start Date:  
End Date:  
Type:
Working or Final:
Open For Comment:
Event:
Program:
Project:
Workgroup/Study Team:
Records Per Page
  Show All Versions for each Document



3801 - 3820 out of 3916.
More Results: 1   2   3   4   5   6   7   8   9   10   11   12   13   14   15   16   17   18   19   20  
21   22   23   24   25   26   27   28   29   30   31   32   33   34   35   36   37   38   39   40  
41   42   43   44   45   46   47   48   49   50   51   52   53   54   55   56   57   58   59   60  
61   62   63   64   65   66   67   68   69   70   71   72   73   74   75   76   77   78   79   80  
81   82   83   84   85   86   87   88   89   90   91   92   93   94   95   96   97   98   99   100  
101   102   103   104   105   106   107   108   109   110   111   112   113   114   115   116   117   118   119   120  
121   122   123   124   125   126   127   128   129   130   131   132   133   134   135   136   137   138   139   140  
141   142   143   144   145   146   147   148   149   150   151   152   153   154   155   156   157   158   159   160  
161   162   163   164   165   166   167   168   169   170   171   172   173   174   175   176   177   178   179   180  
181   182   183   184   185   186   187   188   189   190   191   192   193   194   195   196  

01/24/2008 2018 Heavy Winter PTI Case (v: 14)   

request access >  login >
Description: 2018 Heavy Winter Planning Case. Developed from WECC 2017HW1 case, with load and topology additions from ColumbiaGrid participants and PacifiCorp and Portland General Electric. The PowerWorld version of the case was saved as a PSS/E version 30 raw file to create this version. A confidentiality agreement and password are required.
Type: Base Case
Status: FINAL
Contact

 

01/24/2008 2018 Heavy Winter GE Case (v: 14)   

request access >  login >
Description: 2018 Heavy Winter Planning Case. Developed from WECC 2017HW1 case, with load and topology additions from ColumbiaGrid participants and PacifiCorp and Portland General Electric. The PowerWorld version of the case was saved as an epc file to create this version. That epc file was then saved as a solved .sav file. A confidentiality agreement and password are required.
Type: Base Case
Status: FINAL
Contact

 

11/28/2007 Draft Study Plan (12.04.07) (v: 2)   

...Draft_Study_Plan_version_2.pdf   download>
Description: Draft Study Plan v.2
Type: Report
Status: DRAFT
Contact

 

01/24/2008 2018 Heavy Winter PowerWorld Case (v: 14)   

request access >  login >
Description: 2018 Heavy Winter Planning Case. Developed from WECC 2017HW1 case, with load and topology additions from ColumbiaGrid participants and PacifiCorp and Portland General Electric. A confidentiality agreement and password are required.
Type: Base Case
Status: FINAL
Contact

 

11/14/2007 Planning Activites Report (v: 1)   

...ctivites Report (11.14.07).pdf   download>
Description: Planning Activites Report
Type: Report
Status: FINAL
Contact

 

11/13/2007 Visibility Overview - Westwide System Model (v: 1)   

11.13.07 wsm.pdf   download>
Description: Westwide System Model
Type: Presentation
Status: FINAL
Contact

 

11/13/2007 Redispatch Report for BPA (v: 1)   

...07 RedispatchlReportforBPA.pdf   download>
Description: Redispatch Report for BPA
Type: Report
Status: FINAL
Contact

 

11/14/2007 Treasurer's Report - Funding Agr Monthly Report (v: 1)   

... Monthly Report (11.14.07).pdf   download>
Description: Funding Agreement Monthly Report
Type: Financial
Status: FINAL
Contact

 

11/14/2007 Treasurer's Report - PEFA Monthly Report (v: 1)   

...A Monthly Report 11.14.07).pdf   download>
Description: PEFA Monthly Report
Type: Financial
Status: FINAL
Contact

 

11/14/2007 Treasurer's Report - DSRFA Monthly Report (v: 1)   

... Monthly Report (11.14.07).pdf   download>
Description: DSRFA Monthly Report
Type: Financial
Status: FINAL
Contact

 

11/13/2007 11.13.07 ADI Report (v: 1)   

11.13.07 ADIreport.pdf   download>
Type: Report
Status: FINAL
Contact

 

11/13/2007 11.13.07 ADI results (v: 1)   

11.13.07 ADIresults.pdf   download>
Description: ADI results
Type: Report
Status: FINAL
Contact

 

11/13/2007 11.13.07 ADI status (v: 1)   

11.13.07ADIstatus.pdf   download>
Description: ADI status
Type: Report
Status: FINAL
Contact

 

09/27/2007 WOM 4500 Path Flows Comparison( 9.27.07) (v: 1)   

...Flows Comparison( 9.27.07).pdf   download>
Description: WOM 4500 Path Flows Comparison( 9.27.07) BPA
Type: Spreadsheet
Status: FINAL
Contact

 

11/08/2021 Board Meeting Notice (11.14.07) (v: 1)   

... Meeting Notice (11 14 07).pdf   download>
Description: November 14, 2021 Board Meeting Notice
Type: Notice
Status: FINAL
Contact

 

11/08/2021 Board Agenda (11.14.07) (v: 1)   

... Meeting Agenda (11 14 07).pdf   download>
Description: Board Meeting Agenda
Type: Agenda
Status: FINAL

 

11/08/2021 Reliability Agenda (11.13.07) (v: 1)   

...ability Small Group Agenda.pdf   download>
Description: Reliability Agenda (11.13.07)
Type: Agenda
Status: FINAL
Contact

 

11/06/2021 System Assessment Proposal (10.16.07 edits) (v: 2)   

...t Proposal 10-16 edits (2).pdf   download>
Description: System Assessment Proposal 10-16-07 edits
Type: Report
Status: DRAFT
Contact

 

11/06/2021 Base Case Load Levels (v: 1)   

basecase load levels.pdf   download>
Description: Base Case Load Levels
Type: Spreadsheet
Status: FINAL
Contact

 

11/06/2021 Board Meeting Minutes (10.17.07) (v: 1)   

...Meeting Minutes (10.17.07).pdf   download>
Description: Board Meeting Minutes (10.17.07).
Type: Minutes
Status: FINAL
Contact

 


WHAT OUR MEMBERS SAY

Member: Avista Corporation      Project: ColumbiaGrid     

"In ColumbiaGrid, we now have the ability to resolve the three fundamental transmission questions: What transmission facilities should be built? Who should build them? Who should pay for them? With ColumbiaGrid's independent staff and process to resolve disputes, we can answer these questions effectively and in a timely fashion to facilitate our region's new resource development needs."
~~ Jeff Schlect, Manager, Transmission Services, Avista