All Programs > Variable Transfer Limits
Variable Transfer Limits

Variable Transfer Limits Overview

Variable Transfer Limits

Members of ColumbiaGrid, members of NTTG, the Pacific Northwest Generating Cooperative (PNGC), and the California Independent System Operator (CAISO) have collaborated on an interim study methodology, and Statement of Work including a study plan to study Variable Transfer Limits of the Northwest AC Intertie, Bonneville’s network system, and possibly the other Bonneville interties. It is anticipated that those entities will continue to collaborate and share information and data necessary to study Variable Transfer Limits.

The Parties to the Variable Transfer Limits Functional Agreement intend to engage ColumbiaGrid to coordinate a study to determine the Variable Transfer Limits of the Northwest AC Intertie, Bonneville’s network system, and possibly the other Bonneville interties, by implementing the interim Variable Transfer Limits study methodology, and Statement of Work developed by the collaborative effort, described above. This study is anticipated to be completed by October 2014, in conjunction with the start of the PacifiCorp / CAISO Energy Imbalance Market in October 2014.

 

Timeframe: Current

Status: Active

Lead Staff:
Paul Didsayabutra   Contact

Documents
03/18/2015 COI VTL Study Final Report (v: 1)   

...Rev-0_01-30-15_main_report.pdf   download>

 

01/07/2015 First Amended Variable Transfer Limit Functional Agreement - Final (v: 2)   

...alAgreementFINAL[REDACTED].pdf   download>

 

05/29/2014 VTL Functional Agreement (v: 1)   

...ctionalAgreement[REDACTED].pdf   download>

 

05/28/2014 Board Resolution Variable Transfer Limit Functional Agreement (v: 1)   

BoardResolution-VTL-FA.pdf   download>

 

05/27/2014 COI Statement of Work (v: 1)   

...StatementofWorkv7-05202014.pdf   download>

 

05/27/2014 DTC Study Methodology (v: 1)   

...dy_Methodology_v9_05202014.pdf   download>

 

In this Program


Have and Idea?