...000MeetingAgenda(01.23.12).pdf download>
Description: Order 1000 Meeting Agenda (01.23.12)
Type: Agenda
Status: FINAL
Contact: Jeffrey C. Miller, P.E. contact via email>
01/19/2012 Public Meeting Notice (1.23.12) (v: 1)
blicMeetingNotice(1.23.12).pdf download>
Description: CG Order 1000 Stakeholder Public Meeting Notice (1.23.12)
Type: Notice
Status: FINAL
Contact: Jeffrey C. Miller, P.E. contact via email>
12/09/2011 Draft Agenda( 12.11.11) (v: 1)
DraftAgenda(12.11.11).pdf download>
Description: Draft Agenda( 12.11.11)
Type: Agenda
Status: FINAL
Contact: Marv Landauer, P.E. contact via email>
07/27/2011 PEFA (Integrated Agreement) (v: 1)
EFA (Integrated Agreement).pdf download>
Description: The PEFA restated to include the Agreement itself as updated to include corrections, edits, and additions provided for in the First and Second Amendments.
Type: Functional Agreement
Status: FINAL
Contact: Judith Embler contact via email>
07/08/2011 2011 System Assessment (10MB file) (v: 1)
2011SAsmall.pdf download>
Description: System Assessment 2011
Type: Report
Status: FINAL
Contact: Marv Landauer, P.E. contact via email>
05/31/2011 PNW-CA Feasibility Study (06.02.11) (v: 1)
pnw-ca_feasibility_study.pdf download>
Description: PNW-CA Feasibility Study (06.02.11)
Type: Report
Status: FINAL
05/31/2011 BPA NW-CA Slides TUG BOG (06.02.11) (v: 1)
...TUGBOG_CGPlanMtg2011-06-02.pdf download>
Description: BPA NW-CA Slides TUG BOG (06.02.11)
Type: Report
Status: FINAL
05/31/2011 Brattle WIRES Jobs Study May2011 (06.02.11) (v: 1)
...e-WIRES_Jobs_Study_May2011.pdf download>
Description: Brattle WIRES Jobs Study May2011 (06.02.11)
Type: Report
Status: FINAL
05/31/2011 Planning Agenda 6.2.2011 (v: 1)
raftPlanningAgenda(6-2-11).pdf download>
Description: Planning Agenda 6.2.2011
Type: Agenda
Status: DRAFT
Contact: Marv Landauer, P.E. contact via email>
05/27/2011 WECC DRAFT 10-Year Plan Summary (06.03.11) (v: 1)
...DRAFT_10-Year_Plan_Summary.pdf download>
Description: WECC DRAFT 10-Year Plan Summary (06.03.11)
Type: Report
Status: FINAL
Contact: Marv Landauer, P.E. contact via email>
05/27/2011 SCG Update June 2011 (06.03.11) (v: 1)
SCG_Update_June_2011.pdf download>
Description: SCG Update June 2011
Type: Report
Status: FINAL
Contact: Jeffrey C. Miller, P.E. contact via email>
05/27/2011 COI Utilization Report (06.02.11) (v: 1)
coi_utilization_report.pdf download>
Description: COI Utilization Report (06.02.11)
Type: Report
Status: FINAL
Contact: Marv Landauer, P.E. contact via email>
05/06/2011 Action Items from 5.5.2011 (v: 1)
ActionItemsfrom5-5-11CGPM.pdf download>
Description: Action Items from 5.5.2011
Type: Minutes
Status: DRAFT
Contact: Marv Landauer, P.E. contact via email>
05/05/2011 ColumbiaGrid 2012 Transmission Plan Draft (v: 1)
...012TransmissionPlanDraft1.xlsx download>
Description: ColumbiaGrid 2012 Transmission Plan Draft
Type: Spreadsheet
Status: DRAFT
Contact: Marv Landauer, P.E. contact via email>
05/05/2011 CG Planning Meeting 5.5.2011 Presentation (v: 1)
CGPlgMtg5-5-11.pdf download>
Type: Presentation
Status: DRAFT
Contact: Marv Landauer, P.E. contact via email>
05/05/2011 Updated PSAST Transmission Expansion Plan Results (presentation) (v: 1)
...TTransExpPlanResults5-4-11.pdf download>
Description: Updated PSAST Transmission Expansion Plan Results (presentation)
Type: Presentation
Status: DRAFT
Contact: Jonathan Young contact via email>
05/04/2011 WECC New Transmission (v: 1)
WECCNewTransmission.docx download>
Description: WECC New Transmission
Type: Report
Status: DRAFT
05/04/2011 Table 1 CG 10 Year Plan (v: 1)
Table1CG10YearPlan.xlsx download>
Description: Table 1 CG 10 Year Plan
Type: Spreadsheet
Status: DRAFT
Contact: Marv Landauer, P.E. contact via email>
05/02/2011 Agenda 5.5.11 (v: 2)
raftPlanningAgenda(5-5-11).pdf download>
Description: Agenda 5.5.11
Type: Agenda
Status: DRAFT
Contact: Marv Landauer, P.E. contact via email>
04/25/2011 2010 Transmission Issues (v: 2)
request access > login >
Description: 2010 Transmission Issues
Type: Report
Status: DRAFT
Contact: Marv Landauer, P.E. contact via email>
04/19/2011 Transmission Planning Update (4.20.11) (v: 1)
...TransmissionPlanningUpdate.pdf download>
Description: 4-20-2011 Transmission Planning Update
Type: Presentation
Status: DRAFT
Contact: Jeffrey C. Miller, P.E. contact via email>
03/28/2011 DTC TF (29Mar2011) (v: 1)
DTCTF.WIST(29Mar2011).pdf download>
Description: DTC TF WIST Call (29 Mar 2011)
Type: Presentation
Status: FINAL
03/28/2011 WIST Draft Agenda (3.29.11) (v: 1)
WISTDraftAgenda(3.29.11).pdf download>
Description: WIST Draft Agenda (3.29.11)
Type: Agenda
Status: FINAL
Contact: Marv Landauer, P.E. contact via email>
03/16/2011 DTC TF Phase 1 Report (3.16.11) (v: 1)
DTCTFPhaseFullReport031611.pdf download>
Description: The Dynamic Transfer Capability Task Force has completed a report documenting Phase 1 of its work to develop a methodology for determining dynamic transfer capability limits. If you have any questions or comments, please refer them to Marv Landauer (email).
Type: Report
Status: DRAFT
Open for Comment submit comment >
Contact: Marv Landauer, P.E. contact via email>
03/16/2011 Wind Sheds (v: 1)
wind_sheds.pdf download>
Description: Wind Sheds
Type: Map
Status: DRAFT
Contact: Marv Landauer, P.E. contact via email>
03/16/2011 CG Planning Mtg WRS1-1 (3.17.11) (v: 1)
CGPlgMtgWRS1-1 17Mar11.pdf download>
Description: 2011 WECC Reliability Subcommittee Report
Type: Presentation
Status: DRAFT
Contact: Marv Landauer, P.E. contact via email>
03/16/2011 2011 Study Requests (v: 1)
2011StudyRequests1.doc download>
Description: 2011 Study Requests
Type: Document (pdf)
Status: DRAFT
Contact: Marv Landauer, P.E. contact via email>
03/16/2011 Table 5 Projects in System Assessment (v: 1)
Table5ProjinSA.xlsx download>
Description: Table 5 Projects in System Assessment
Type: Spreadsheet
Status: DRAFT
Contact: Marv Landauer, P.E. contact via email>
03/16/2011 Table 1 Ten Year Plan (v: 1)
Table1TenYearPlan.xlsx download>
Description: Table 1 Ten Year Plan
Type: Spreadsheet
Status: DRAFT
Contact: Marv Landauer, P.E. contact via email>
03/16/2011 Centralia Study Status 3.18.11 (v: 1)
...traliaStudyStatus3-18-2011.pdf download>
Description: Centralia Study Status 3.18.11
Type: Presentation
Status: DRAFT
Contact: Jeffrey C. Miller, P.E. contact via email>
03/09/2011 Planning Agenda (3.17.11) (v: 1)
aftPlanningAgenda(3-17-11).pdf download>
Description: Planning Agenda (3.17.11)
Type: Agenda
Status: DRAFT
Contact: Marv Landauer, P.E. contact via email>
03/09/2011 Action Items 1.27.11 (v: 1)
ActionItemsfrom1-27-11CGPM.pdf download>
Description: Action Items 1.27.11
Type: Minutes
Status: DRAFT
Contact: Marv Landauer, P.E. contact via email>
03/07/2011 TCRM Tables (v: 1)
request access > login >
Description: TCRM Tables
Type: Spreadsheet
Status: DRAFT
Contact: Jonathan Young contact via email>
03/07/2011 Approved 2011 Biennial Transmission Expansion Plan (v: 3)
2011BiennialPlan.pdf download>
Description: 2011 Biennial Transmission Expansion Plan
Type: Report
Status: FINAL
Contact: Jeffrey C. Miller, P.E. contact via email>
02/07/2011 PSAST Action Items (v: 1)
PSAST2-3-11ActionItems.pdf download>
Description: PSAST Action Items
Type: Minutes
Status: DRAFT
Contact: Jonathan Young contact via email>
02/07/2011 PSAST Agenda (2.18.11) (v: 1)
PSAST_Feb18_Agenda.pdf download>
Description: PSAST Agenda (2.18.11)
Type: Agenda
Status: DRAFT
Contact: Jonathan Young contact via email>
01/25/2011 WIST Report final Draft January 2011 (v: 2)
...portfinaldraftJanuary2011.docx download>
Description: WIST Report final Draft
Type: Report
Status: DRAFT
Contact: Marv Landauer, P.E. contact via email>
01/11/2011 NWE Wind Profile 2009 (v: 1)
NWEWindProfile2009.xls download>
Description: NWE Wind Profile 2009
Type: Spreadsheet
Status: DRAFT
01/10/2011 PSAST Agenda (2.3.11) (v: 1)
PSAST_Feb3_Agenda.doc download>
Description: PSAST Agenda (2.3.11)
Type: Agenda
Status: DRAFT
Contact: Jonathan Young contact via email>
12/08/2010 PSE Attachment K PSAST Mtg 2010 (v: 1)
PSEAttKPSATMtg(12-9-10).pdf download>
Description: PSE Attachment K PSAST Mtg 2010
Type: Presentation
Status: DRAFT
12/06/2010 WIST Agenda 12.8.10 (v: 1)
WIST12-8-10DraftAgenda.pdf download>
Description: WIST Agenda 12.8.10
Type: Agenda
Status: DRAFT
Contact: Marv Landauer, P.E. contact via email>
12/03/2010 Action Items from 12.2.10 (v: 1)
ActionItemsfrom12-2-10CGPM.pdf download>
Description: Action Items from 12.2.10
Type: Minutes
Status: DRAFT
Contact: Marv Landauer, P.E. contact via email>
12/03/2010 2011 Study Requests (v: 1)
2011StudyRequests.doc download>
Description: 2011 Study Requests
Type: Document (pdf)
Status: DRAFT
Contact: Marv Landauer, P.E. contact via email>
12/03/2010 Planning Agenda (1.27.11) (v: 1)
aftPlanningAgenda(1-27-11).pdf download>
Description: Planning Agenda (1.27.11)
Type: Agenda
Status: DRAFT
Contact: Marv Landauer, P.E. contact via email>
12/02/2010 Future work recommendations Local vs Remote from WIST report (v: 1)
...nsLocalvsremoteWISTReport.docx download>
Description: Future work recommendations Local vs Remote from WIST report
Type: Report
Status: DRAFT
Contact: Marv Landauer, P.E. contact via email>
12/01/2010 Adjacent Circuit Criteria (v: 1)
AdjCir12-9-10.pdf download>
Description: Adjacent Circuit Criteria
Type: Presentation
Status: DRAFT
Contact: Marv Landauer, P.E. contact via email>
12/01/2010 Centralia Shutdown Study Plan (v: 1)
CentraliaShutdownStudyPlan.pdf download>
Description: Centralia Shutdown Study Plan
Type: Report
Status: DRAFT
Contact: Gordon Comegys, P.E. contact via email>
12/01/2010 WECC 10-Year Plan Update (v: 1)
WECC10yearPlanUpdate.pdf download>
Description: WECC 10-Year Plan Update
Type: Report
Status: DRAFT
Contact: Jeffrey C. Miller, P.E. contact via email>
12/01/2010 CAISO Wind Ramp Plots 2009 spreadsheet (v: 1)
CAISO.WindRampPlots2009.xls download>
Description: CAISO Wind Ramp Plots 2009 spreadsheet
Type: Spreadsheet
Status: DRAFT
12/01/2010 PSAST Agenda 12.9.10 (v: 1)
PSAST_Dec9_Agenda.pdf download>
Description: PSAST Agenda 12.9.10
Type: Agenda
Status: DRAFT
Contact: Jonathan Young contact via email>
11/19/2010 2011 Biennial Plan CEII Attachments (Zipped File) (v: 1)
request access > login >
Description: 2011 Biennial Plan CEII Attachments (Zipped File)
Type: Spreadsheet
Status: DRAFT
11/17/2010 CIRED Flicker Objectives (v: 1)
CIRED2009_0755_Paper.pdf download>
Description: CIRED Flicker Objectives
Type: Document (pdf)
Status: DRAFT
11/15/2010 2009 BPA Wind Ramp Plots (v: 1)
RAFT-2009BPA-WindRampPlots.xls download>
Description: 2009 BPA Wind Ramp Plots
Type: Spreadsheet
Status: DRAFT
11/15/2010 PacifiCorp Wind Variability Graph for 2010 (v: 1)
..._Wind_Variability_PAC_2010.pdf download>
Description: PacifiCorp Wind Variability Graph for 2010
Type: Charts
Status: DRAFT
11/15/2010 CAISO Wind Profile 2009 (v: 1)
CAISOWindProfile2009.xls download>
Description: CAISO Wind Profile 2009
Type: Spreadsheet
Status: DRAFT
11/12/2010 Action Items from CG Planning Mtg 11.4.10 (v: 1)
ActionItemsfrom11-4-10CGPM.pdf download>
Description: Action Items from CG Planning Mtg 11.4.10
Type: Minutes
Status: DRAFT
Contact: Marv Landauer, P.E. contact via email>
11/11/2010 PSE Transmission Customer Meeting Invitation (12.9.10) (v: 1)
...erMeetingInvitation12-9-10.pdf download>
Description: PSE Transmission Customer Meeting Invitation (12.9.10)
Type: Notice
Status: DRAFT
11/10/2010 BPA Wind Profile 2009 (32MB file) (v: 1)
BPAWindProfile2009.xls download>
Description: BPA Wind Profile 2009
Type: Spreadsheet
Status: DRAFT
11/09/2010 Planning Mtg Agenda (12.2.10) (v: 1)
aftPlanningAgenda(12-2-10).pdf download>
Description: Planning Mtg Agenda (12.2.10
Type: Agenda
Status: DRAFT
Contact: Marv Landauer, P.E. contact via email>
11/04/2010 Planning Meeting presentation (Marv) (v: 1)
G Plg Mtg Exp Plg 11-4-10.pptx download>
Description: Planning Meeting presentation (Marv)
Type: Presentation
Status: DRAFT
Contact: Marv Landauer, P.E. contact via email>
11/04/2010 Ten Year Plan (v: 1)
TenYearPlan.xlsx download>
Description: Ten Year Plan
Type: Spreadsheet
Status: DRAFT
Contact: Marv Landauer, P.E. contact via email>
11/03/2010 WECC 10 Year Plan Update (v: 1)
WECC10yearPlanUpdate.pdf download>
Description: WECC 10 Year Plan Update
Type: Presentation
Status: DRAFT
11/03/2010 Puget Sound Transmission Expansion Plan Status 11.4.10 (v: 1)
...ExpansionPlanStatus11-4-10.pdf download>
Description: Puget Sound Transmission Expansion Plan Status 11.4.10
Type: Presentation
Status: DRAFT
Contact: Jeffrey C. Miller, P.E. contact via email>
11/03/2010 Sammamish-Lakeside-Talbot Sensitivity (PSAST) (v: 1)
...e-TalbotSensitivity(PSAST).pdf download>
Description: Sammamish-Lakeside-Talbot Sensitivity (PSAST)
Type: Presentation
Status: DRAFT
Contact: Amy Johnson contact via email>
11/03/2010 Puget Sound Generation Levels (v: 1)
PugetSoundGenerationLevels.pdf download>
Description: Puget Sound Generation Levels
Type: Presentation
Status: DRAFT
Contact: Amy Johnson contact via email>
11/03/2010 Draft Planning Agenda (10.19.10) (v: 3)
...ftPlanningAgenda(11-4-10)1.pdf download>
Description: Draft Planning Agenda (10.19.10)
Type: Agenda
Status: DRAFT
Contact: Marv Landauer, P.E. contact via email>
11/03/2010 Walla Walla Area Wind Generation 10.29.10 (v: 1)
...AreaWindGeneration10-29-10.pdf download>
Description: Walla Walla Area Wind Generation 10.29.10
Type: Map
Status: DRAFT
11/03/2010 CAISO Technical Appendices for Renewable Integration Studies (v: 1)
TechnicalAppendixfor20%.pdf download>
Description: CAISO Technical Appendices for Renewable Integration Studies
Type: Presentation
Status: DRAFT
11/03/2010 CAISOIntegration of Renewable Resources (v: 1)
ISOstudyofthe20%renewables.pdf download>
Description: CAISOIntegration of Renewable Resources
Type: Presentation
Status: DRAFT
11/03/2010 Presentation on CAISO intermittent dynamic transfer capability (v: 1)
CAISO-DTS-COI-WOR.pdf download>
Description: Presentation on CAISO intermittent dynamic transfer capability
Type: Presentation
Status: DRAFT
10/29/2010 BPA Dynamic Transfer Limit Study Methodology (v: 1)
DTLS_methodology_F.pdf download>
Description: DTLS Methodology F Presentation
Type: Presentation
Status: DRAFT
10/29/2010 Idaho DTC Study Slides (v: 1)
IPCO-DTLStudy-Background.pdf download>
Description: Idaho DTC Study Slides
Type: Presentation
Status: DRAFT
10/26/2010 BPA CG WIST Review of Dynamic Transfer Capability Studies (v: 1)
WIST100520.pdf download>
Description: WIST 5.20.10 Presentation
Type: Presentation
Status: DRAFT
10/12/2010 August 20,2010 WIST Report final draft (10.14.10) (v: 1)
...t final draft 20August2010.pdf download>
Description: August 20,2010 WIST Report final draft (10.14.10)
Type: Report
Status: FINAL
Contact: Marv Landauer, P.E. contact via email>
10/12/2010 Ca DTL Final Proposal (10.14.10) (v: 1)
Ca DTL Final Proposal.pdf download>
Description: Ca DTL Final Proposal
Type: Presentation
Status: FINAL
10/12/2010 CaISO DTL(10.14.10) (v: 1)
CaISO DTL.pdf download>
Description: CaISO DTL
Type: Presentation
Status: FINAL
09/27/2010 Action Items - Nomo Strat Session (8.23.10) (v: 1)
...tratSession(v23August2010).zip download>
Description: Action Items - Nomo Strat Session (8.23.10)
Type: Spreadsheet
Status: DRAFT
Contact: Jonathan Young contact via email>
09/27/2010 Nomogram Strategy Session Agenda (10.01.10) (v: 1)
Agenda(1October2010).doc download>
Description: Nomogram Strategy Session Agenda (10.01.10)
Type: Agenda
Status: DRAFT
Contact: Jonathan Young contact via email>
09/22/2010 PSAST Rerun TCRM Results (Zip file 6MB) (v: 1)
request access > login >
Description: PSAST Rerun TCRM Results
Type: Spreadsheet
Status: DRAFT
Contact: Jonathan Young contact via email>
09/09/2010 BPA ATC Results 9.9.10 Tier 1 (v: 1)
request access > login >
Description: BPA ATC Results 9.9.10 Tier 1
Type: Spreadsheet
Status: DRAFT
08/27/2010 PSAST Agenda 9.28.10 (v: 1)
PSAST_Sept28_Agenda.pdf download>
Description: PSAST Agenda 9.28.10
Type: Agenda
Status: DRAFT
Contact: Jonathan Young contact via email>
07/29/2010 Combined Winter 2010 S2N Heavy and Light EL-MO oos (v: 1)
request access > login >
Description: Combined Winter 2010 S2N Heavy and Light EL-MO oos
Type: Spreadsheet
Status: DRAFT
Contact: Jonathan Young contact via email>
07/29/2010 PSA Net Load Definitions (v: 1)
request access > login >
Description: PSA Net Load Definitions
Type: Spreadsheet
Status: DRAFT
Contact: Jonathan Young contact via email>
07/29/2010 PSE Gen vs Net Area Load (v: 1)
request access > login >
Description: PSE Gen vs Net Area Load
Type: Spreadsheet
Status: DRAFT
Contact: Jonathan Young contact via email>
07/29/2010 Action Items & Points of Information from Nomo Strategy Session (7.20.10) (v: 1)
request access > login >
Description: Action Items & Points of Information from Nomo Strategy Session (7.20.10)
Type:
Status: DRAFT
Contact: Jonathan Young contact via email>
07/29/2010 PSAST Action Items (v: 1)
PSAST8-24-10ActionItems.pdf download>
Description: PSAST Action Items
Type: Minutes
Status: DRAFT
Contact: Jonathan Young contact via email>
07/29/2010 PSAST Agenda 08.24.10 (v: 1)
PSAST_Aug24_Agenda.pdf download>
Description: PSAST Agenda 08.24.10
Type: Agenda
Status: DRAFT
Contact: Jonathan Young contact via email>
07/29/2010 WIST Notes from 7.7.201 Mtg (v: 1)
raftNotesWISTMeeting7-7-10.doc download>
Description: WIST Notes from 7.7.201 Mtg
Type: Minutes
Status: DRAFT
07/23/2010 Puget Sound Area Generation Modeling Guideline 6.23.10 (v: 2)
request access > login >
Description: Puget Sound Area Generation Modeling Guideline 6.23.10
Type: Report
Status: DRAFT
Contact: Jonathan Young contact via email>
07/19/2010 White Paper ST Nomogram Improvement v19 (7.20.10) (v: 1)
confidentiality agreement required >
Description: White Paper ST Nomogram Improvement v19 (7.20.10)
Type: Document (pdf)
Status: DRAFT
Contact: Jonathan Young contact via email>
07/19/2010 Ordered Discussion Cases v19 (7.20.10) (v: 1)
confidentiality agreement required >
Description: Ordered Discussion Cases v19 (7.20.10)
Type: Document (pdf)
Status: FINAL
Contact: Jonathan Young contact via email>
07/19/2010 Draft Agenda Puget Sound Nomogram Strategy Session (7.20.10) (v: 1)
...undNomogramStrategySession.pdf download>
Description: Draft Agenda Puget Sound Nomogram Strategy Session (7.20.10)
Type: Agenda
Status: FINAL
Contact: Jonathan Young contact via email>
07/14/2010 PSAST Agenda 7.28.10 (v: 1)
PSAST_July28_Agenda.pdf download>
Description: PSAST Agenda 7.28.10
Type: Agenda
Status: DRAFT
Contact: Jonathan Young contact via email>
07/08/2010 CEC Wind Impact on California (v: 1)
..._Wind_Impact_on_California.pdf download>
Description: CEC Wind Impact on California
Type: Report
Status: DRAFT
07/08/2010 NERC Dynamic Transfer Guidelines (v: 1)
...ynamic_Transfer_Guidelines.doc download>
Description: NERC Dynamic Transfer Guidelines
Type: Report
Status: DRAFT
07/08/2010 WIST 9.2.10 Agenda (v: 1)
WIST9-2-10DraftAgenda.pdf download>
Description: WIST 9.2.10 Agenda
Type: Agenda
Status: DRAFT
Contact: Jeffrey C. Miller, P.E. contact via email>
07/06/2010 WIST Report Presentation (v: 1)
WISTReport6-7-10.pdf download>
Description: WIST Report Presentation
Type: Presentation
Status: DRAFT
Contact: Marv Landauer, P.E. contact via email>
07/06/2010 KEMA sees opportunites for storage applications in high-penetration renewables (v: 1)
...23 KEMA CA ISO study FINAL.pdf download>
Description: KEMA sees opportunites for storage applications in high-penetration renewables
Type: Report
Status: DRAFT
07/06/2010 Research Evaluation of Wind Generation, Solar & Storage Impact on CA Grid (v: 1)
CEC-500-2010-010.pdf download>
Description: Research Evaluation of Wind Generation, Solar & Storage Impact on CA Grid
Type: Report
Status: DRAFT
07/06/2010 Challenges of Wind Integration (v: 1)
...ind_Integration_6.15.10[1].doc download>
Description: Challenges of Wind Integration
Type: Report
Status: DRAFT
07/06/2010 IS Dynamic Transfer Guidelines (v: 1)
...c_Transfer_Guidelines_0526.doc download>
Description: IS Dynamic Transfer Guidelines
Type: Report
Status: DRAFT
07/01/2010 Dynamic Scheduling Final Report (v: 1)
namicSchedulingFinalReport.pdf download>
Description: Dynamic Scheduling Final Report
Type: Report
Status: DRAFT
07/01/2010 WIST Draft Report Updated (v: 1)
WISTReportdraft29June10.docx download>
Description: WIST Draft Report Updated
Type: Report
Status: DRAFT
Contact: Marv Landauer, P.E. contact via email>
06/29/2010 PSAST 6.23.10 Action Items (v: 1)
PSAST6-23-10ActionItems.doc download>
Description: PSAST 6.23.10 Action Items
Type: Minutes
Status: DRAFT
Contact: Jonathan Young contact via email>
06/29/2010 Powerex Comments on Dynamic Transfer Limits Methodology (v: 1)
PWX-BPAreDSS28June2010.pdf download>
Description: Powerex Comments on Dynamic Transfer Limits Methodology
Type: Comments
Status: DRAFT
06/29/2010 WIST Agenda 7.7.10 (v: 1)
WIST5-20-10DraftAgenda1.pdf download>
Description: WIST Agenda 7.7.10
Type: Agenda
Status: DRAFT
Contact: Marv Landauer, P.E. contact via email>
06/25/2010 Action Items from 6.24.10 (v: 1)
ctionItemsfrom6-24-10CGPM.docx download>
Description: Action Items from 6.24.10
Type: Minutes
Status: DRAFT
Contact: Marv Landauer, P.E. contact via email>
06/22/2010 Morgan Lewis - Energy LF FERC Proposed Rule on Transmission Planning & Cost Allocation (v: 1)
...issionPlanning_18jun10 (2).pdf download>
Description: Morgan Lewis - Energy LF FERC Proposed Rule on Transmission Planning & Cost Allocation
Type: Letter
Status: DRAFT
06/22/2010 Draft SCG Committed Potential Map (v: 1)
...mmitted_PotentialMap-ver41.pdf download>
Description: Draft SCG Committed Potential Map
Type: Map
Status: DRAFT
06/22/2010 Footnote B (v: 1)
Footnoteb.pdf download>
Description: Footnote B
Type: Document (pdf)
Status: DRAFT
Contact: Marv Landauer, P.E. contact via email>
06/21/2010 PSAST Agenda (v: 1)
PSAST_June23_Agenda.doc download>
Description: PSAST Agenda
Type: Agenda
Status: DRAFT
Contact: Jonathan Young contact via email>
06/21/2010 Action Items from 5.14.10 (v: 1)
PSAST5-14-10ActionItems(2).pdf download>
Description: Action Items from 5.14.10
Type: Minutes
Status: DRAFT
Contact: Jonathan Young contact via email>
06/18/2010 Draft Planning Agenda (6.24.10) (v: 2)
...ftPlanningAgenda(6-24-10)1.pdf download>
Description: Draft Planning Agenda (6.24.10)
Type: Agenda
Status: DRAFT
Contact: Marv Landauer, P.E. contact via email>
06/18/2010 Generation Modeling Guidelines (v: 1)
...onModelingGuideline6-18-10.doc download>
Type: Report
Status: DRAFT
Contact: Jonathan Young contact via email>
06/16/2010 Planning Presentation (v: 1)
PlanningUpdate (06.16.10).pdf download>
Description: Planning Presentation 6.16.10
Type: Presentation
Status: DRAFT
Contact: Marv Landauer, P.E. contact via email>
06/09/2010 WIST Notes from 5.20.10 Mtg (v: 1)
...Draft-NotesWISTMeeting5.20.doc download>
Description: WIST Notes from 5.20.10 Mtg
Type: Minutes
Status: DRAFT
05/27/2010 Power System Paradigm Shift (v: 1)
WIST5-20-10.ppt download>
Description: WIST Presentation (5.20.10)
Type: Presentation
Status: DRAFT
05/20/2010 Wind Initiatives Matrix (v: 1)
WindInitiativesMatrix1.xls download>
Description: Wind Initiatives Matrix
Type: Spreadsheet
Status: DRAFT
05/19/2010 Path 3 Northwest to BC Thermal Upgrade Project Phase 1 Path Rating Report (v: 1)
request access > login >
Description: Path 3 Northwest to BC Thermal Upgrade Project Phase 1 Path Rating Report
Type: Report
Status: DRAFT
05/19/2010 Comprehensive Progress Report for Path 3 NW - BC (v: 1)
request access > login >
Description: Comprehensive Progress Report for Path 3 NW - BC
Type: Report
Status: DRAFT
05/18/2010 Agenda WIST (v: 1)
WIST5-20-10DraftAgenda.pdf download>
Description: Agenda WIST
Type: Agenda
Status: DRAFT
Contact: Marv Landauer, P.E. contact via email>
05/17/2010 18hw1-s SeedCase (v: 1)
request access > login >
Description: 18hw1-s SeedCase
Type: Base Case
Status: DRAFT
05/14/2010 WIST Draft Report 5.13.10 (v: 1)
WISTReportdraft13May10.doc download>
Description: WIST Draft Report 5.13.10
Type: Report
Status: DRAFT
Contact: Marv Landauer, P.E. contact via email>
05/14/2010 Study Results Review (v: 1)
tudyResultsReview_5-14-10.pptx download>
Description: Study Results Review
Type: Presentation
Status: DRAFT
Contact: Jonathan Young contact via email>
05/13/2010 Powerex Comments on PSAST Plan (v: 1)
...fMiller)rePSAExpPln5.12.10.doc download>
Description: Powerex Comments on PSAST Plan
Type: Comments
Status: DRAFT
05/13/2010 PSAST Agenda (5.14.10) (v: 2)
PSAST_May14_Agenda_r1.pdf download>
Description: PSAST Agenda (5.14.10)
Type: Agenda
Status: DRAFT
Contact: Jonathan Young contact via email>
05/12/2010 BPA/CG Meeting Minutes 4.23.10 (v: 1)
...ingMinutes_04-23-10_v5 (2).doc download>
Description: BPA/CG Meeting Minutes 4.23.10
Type: Minutes
Status: DRAFT
05/11/2010 BPA Cost Estimate Request (v: 1)
BPACostEstimateRequest.pdf download>
Description: BPA Cost Estimate Request
Type: Document (pdf)
Status: DRAFT
Contact: Jeffrey C. Miller, P.E. contact via email>
05/11/2010 PSE Cost Estimate Request (v: 1)
PSECostEstimateRequest.pdf download>
Description: PSE Cost Estimate Request
Type: Document (pdf)
Status: DRAFT
Contact: Jeffrey C. Miller, P.E. contact via email>
05/11/2010 SCL Cost Estimate Request (v: 1)
SCLCostEstimateRequest.pdf download>
Description: SCL Cost Estimate Request
Type: Document (pdf)
Status: DRAFT
Contact: Jeffrey C. Miller, P.E. contact via email>
05/11/2010 2010 Biennial Expansion Plan Update (v: 1)
2010BiennialPlan2.pdf download>
Description: 2010 Biennial Expansion Plan Update
Type: Report
Status: FINAL
Contact: Jeffrey C. Miller, P.E. contact via email>
05/04/2010 PSAST Action Items (5.14.10) (v: 1)
...ea Study Team Action Items.doc download>
Description: PSAST Action Items (5.14.10)
Type: Minutes
Status: DRAFT
Contact: Jonathan Young contact via email>
05/04/2010 PSAST May 19 Agenda (v: 1)
PSAST_May19_Agenda.pdf download>
Description: PSAST May 19 Agenda
Type: Agenda
Status: FINAL
Contact: Jonathan Young contact via email>
04/22/2010 Action Items from 4.20.10 Planning Mtg (v: 1)
ActionItemsfrom4-20-10.pdf download>
Description: Action Items from 4.20.10 Planning Mtg
Type: Notes
Status: DRAFT
Contact: Marv Landauer, P.E. contact via email>
04/21/2010 Test of 2010 System Assessment 10 Year Cases (Zipped File) (v: 1)
request access > login >
Description: Test of 2010 System Assessment 10 Year Cases (Zipped File)
Type: PowerWorld Auxiliary File
Status: DRAFT
Contact: Gordon Comegys, P.E. contact via email>
04/19/2010 Comments on 5 & 10 Year Cases (v: 1)
CommentsMade.pdf download>
Description: Comments on 5 & 10 Year Cases
Type: Comments
Status: DRAFT
Contact: Jeffrey C. Miller, P.E. contact via email>
04/09/2010 WIST Update February 2010 (v: 1)
WIT_Update_Feb_2010.pdf download>
Description: WIST Update February 2010
Type: Notes
Status: DRAFT
04/09/2010 WIST 2.18.10 Notes (v: 1)
WIST2-18-10Notes.doc download>
Description: WIST 2.18.10 Notes
Type: Notes
Status: DRAFT
04/09/2010 Dynamic Transfer Limits Map (v: 1)
dyn_transfer_limits map.pdf download>
Description: Dynamic Transfer Limits Map
Type: Report
Status: DRAFT
04/09/2010 DTLS Results (v: 1)
DTLS_results.pdf download>
Description: DTLS Results
Type: Report
Status: DRAFT
04/09/2010 DTLS Methodology F (v: 1)
DTLS_methodology_F1.pdf download>
Description: DTLS Methodology F
Type: Report
Status: DRAFT
04/07/2010 TEPPC Northwest Additional Wind Cases (4.6.10) (v: 1)
PPCNWAddWindCases(4.6.10).docx download>
Description: TEPPC Northwest Additional Wind Cases (4.6.10)
Type: Report
Status: DRAFT
04/07/2010 Summary of 2009 WIST Wind Analysis (4.6.10) (v: 1)
...9WISTWindAnalysis(4.6.10).docx download>
Description: Summary of 2009 WIST Wind Analysis (4.6.10)
Type: Report
Status: DRAFT
04/07/2010 Summary Western Wind Solar Integration Study RH (v: 1)
...indSolarIntegrationStudyRH.doc download>
Description: Summary Western Wind Solar Integration Study RH
Type: Report
Status: DRAFT
04/07/2010 WIST Report Gibson Sections (4.6.10) (v: 1)
STreptGibsonsections6Apr10.doc download>
Description: WIST Report Gibson Sections (4.6.10)
Type: Report
Status: DRAFT
04/06/2010 BPA comments on Puget Sound Area Transmission Expansion Plan (v: 1)
...3-23-2010_reviewShortTPPv1.pdf download>
Description: BPA comments on Puget Sound Area Transmission Expansion Plan
Type: Comments
Status: DRAFT
04/05/2010 PSAST Agenda (4.8.10) (v: 1)
PSAST_April8_Agenda_r1.pdf download>
Description: PSAST Agenda (4.8.10)
Type: Agenda
Status: DRAFT
Contact: Jonathan Young contact via email>
04/02/2010 Puget Sound Area Transmission Plan Schedule & Cost Estimate 4.2.10 (v: 1)
...nSceduleCostEstimate4-2-10.doc download>
Description: Puget Sound Area Transmission Plan Schedule & Cost Estimate 4.2.10
Type: Report
Status: DRAFT
Contact: Jeffrey C. Miller, P.E. contact via email>
04/02/2010 Puget Sound Area Study Team Action Items (v: 1)
...ndAreaStudyTeamActionItems.doc download>
Description: Puget Sound Area Study Team Action Items
Type: Minutes
Status: DRAFT
Contact: Jonathan Young contact via email>
04/02/2010 Addendum to NMC Report (v: 1)
request access > login >
Description: Addendum to NMC Report
Type: Report
Status: DRAFT
Contact: Marv Landauer, P.E. contact via email>
04/02/2010 Wind Integration Study Team 2009-09-10 (v: 1)
...rationStudyTeam2009-09-101.doc download>
Description: Wind Integration Study Team 2009-09-10
Type:
Status: DRAFT
04/02/2010 Simple Integration Model Studies (v: 1)
...pleIntegrationModelStudies.pdf download>
Description: Simple Integration Model Studies
Type:
Status: DRAFT
04/02/2010 Latest LBNL-WREZ Work (v: 1)
LatestLBNL-WREZwork.docx download>
Description: Latest LBNL-WREZ Work
Type: Report
Status: DRAFT
03/31/2010 Figures 4-10 (v: 1)
Figures 4-10.ppt download>
Description: Figures 4-10
Type: Presentation
Status: DRAFT
03/31/2010 WREZ Report (v: 1)
WREZReport.doc download>
Description: WREZ Report
Type: Report
Status: DRAFT
03/31/2010 WIST Report Gibson Sections (3.24.10) (v: 1)
...TreptGibsonsections24Mar10.doc download>
Description: WIST Report Gibson Sections (3.24.10)
Type: Report
Status: DRAFT
03/31/2010 WIST Report Outline (v: 1)
WISTReportOutline1.pdf download>
Description: WIST Report Outline
Type: Report
Status: DRAFT
03/31/2010 Summary Western Wind Solar Integration Study (v: 1)
...indSolarIntegrationStudyRH.doc download>
Description: Summary Western Wind Solar Integration Study
Type: Report
Status: DRAFT
03/23/2010 Puget Sound Area Expansion Plan Supporting Doc (Zipped File) (v: 1)
request access > login >
Description: Puget Sound Area Expansion Plan Supporting Doc (Zipped File)
Type: Spreadsheet
Status: DRAFT
Contact: Jonathan Young contact via email>
03/23/2010 Puget Sound Area Expansion Plan 3.23.10 (v: 1)
request access > login >
Description: Puget Sound Area Expansion Plan 3.23.10
Type: Report
Status: DRAFT
Contact: Jonathan Young contact via email>
03/18/2010 Action Items (3.2.10) (v: 1)
ActionItemsfrom3-2-10CGPM.pdf download>
Description: Action Items (3.2.10)
Type: Minutes
Status: DRAFT
Contact: Marv Landauer, P.E. contact via email>
03/04/2010 Planning Agenda (4.20.10) (v: 1)
aftPlanningAgenda(4-20-10).pdf download>
Description: Planning Agenda (4.20.10)
Type: Agenda
Status: DRAFT
Contact: Marv Landauer, P.E. contact via email>
03/03/2010 WIST Report Outline (v: 1)
WISTReportOutline.pdf download>
Description: WIST Report Outline
Type: Report
Status: DRAFT
Contact: Marv Landauer, P.E. contact via email>
03/03/2010 Wind Analysis Report - Draft (v: 1)
WINDANALYSISREPORTDRAFT(2).pdf download>
Description: Wind Analysis Report - Draft
Type: Report
Status: DRAFT
Contact: Marv Landauer, P.E. contact via email>
03/02/2010 Lancaster Loop - Avista Presentation (v: 1)
Lancaster_Loop_in.ppt download>
Description: Lancaster Loop - Avista Presentation
Type: Presentation
Status: DRAFT
03/02/2010 Study Plan 1.25.10 (v: 1)
StudyPlan25Jan10(2).pdf download>
Description: Study Plan 1.25.10
Type: Agenda
Status: DRAFT
Contact: Marv Landauer, P.E. contact via email>
02/26/2010 WIST Report Team Agenda (3-3-10) (v: 1)
...eport Team Agenda (3-3-10).pdf download>
Description: WIST Report Team Agenda (3-3-10)
Type: Agenda
Status: FINAL
Contact: Marv Landauer, P.E. contact via email>
02/26/2010 SPSC Miller Presentation - SCG (1.29.10) (v: 1)
...rPresentationonSCG-1-29-10.pdf download>
Description: SPSC Miller Presentation - SCG (1.29.10)
Type: Presentation
Status: DRAFT
Contact: Jeffrey C. Miller, P.E. contact via email>
02/26/2010 Puget Sound Reinforcements (2.17.10) (v: 1)
...SoundReinforcements2-17-10.pdf download>
Description: Puget Sound Reinforcements (2.17.10)
Type: Presentation
Status: DRAFT
Contact: Jeffrey C. Miller, P.E. contact via email>
02/22/2010 NREL Wind Presentation (v: 1)
Wind-NREL_presentation.pdf download>
Description: NREL Wind Presentation
Type: Presentation
Status: DRAFT
02/19/2010 Resolution for Adoption of Plan Update (020910) (v: 1)
...AdoptionofPlanUpdate020910.doc download>
Description: Resolution for Adoption of Plan Update (020910)
Type: Corporate Doc
Status: FINAL
Contact: Judith Embler contact via email>
02/17/2010 TEPPC 2009 Study Program Results Report (v: 1)
...udy-Program-Results-Report.pdf download>
Description: TEPPC 2009 Study Program Results Report
Type: Report
Status: DRAFT
02/12/2010 Dynamic Transfer Study (v: 1)
Ppt0000005.pdf download>
Description: Dynamic Transfer Study
Type: Presentation
Status: FINAL
02/11/2010 WIST Agenda (2.18.10) (v: 1)
WIST2-18-10DraftAgenda.pdf download>
Description: WIST Agenda (2.18.10)
Type: Agenda
Status: DRAFT
Contact: Jeffrey C. Miller, P.E. contact via email>
02/10/2010 Powertech Summary of 2008 DS Lim Study (v: 1)
...echsummaryof2008DSLimStudy.pdf download>
Description: Powertech Summary of 2008 DS Lim Study
Type: Presentation
Status: DRAFT
02/09/2010 WIST Meeting Notes (12.17.09) (v: 1)
WIST12-17-09Notes.pdf download>
Description: WIST Meeting Notes (12.17.09)
Type: Minutes
Status: DRAFT
02/03/2010 Puget Soung Area Expansion Plan (v: 1)
...ansionPlan1-2010-Version3a.doc download>
Type: Report
Status: DRAFT
Contact: Jonathan Young contact via email>
01/27/2010 Draft Action Items from 1.26.10 (v: 1)
ActionItemsfrom1-26-10CGPM.pdf download>
Description: Draft Action Items from 1.26.10
Type: Minutes
Status: DRAFT
Contact: Marv Landauer, P.E. contact via email>
01/27/2010 Draft Planning Agenda (v: 1)
raftPlanningAgenda(3-2-10).pdf download>
Description: Draft Planning Agenda
Type: Agenda
Status: DRAFT
Contact: Marv Landauer, P.E. contact via email>
01/26/2010 Agenda (020410) (v: 1)
PSAST_Feb4th_2010_Agenda.pdf download>
Description: PSAST Agenda Feb. 4th, 2010
Type: Agenda
Status: FINAL
Contact: Jonathan Young contact via email>
01/25/2010 Draft Planning Agenda (v: 1)
aftPlanningAgenda(1-26-10).pdf download>
Description: Draft Planning Agenda;
Type: Agenda
Status: DRAFT
Contact: Marv Landauer, P.E. contact via email>
12/23/2009 PSAST TCRM Phase 1 Report (v: 1)
...RM_Phase1Report_FinalDraft.pdf download>
Description: Puget Sound Area Study Team Report
Type: Report
Status: FINAL
Contact: Jonathan Young contact via email>
12/23/2009 PV Basecase Preparation (Large Zip File) (v: 1)
request access > login >
Description: PV Basecase Preparation
Type: PowerWorld Auxiliary File
Status: DRAFT
Contact: Gordon Comegys, P.E. contact via email>
12/22/2009 Puget Sound Area StudyTeam Action Items (12.15.09)(2) (v: 1)
...amActionItems(12.15.09)(2).pdf download>
Description: Puget Sound Area Study Team Action Items(12.15.09)(2)
Type: Minutes
Status: FINAL
Contact: Jonathan Young contact via email>
12/17/2009 Dynamic Transfer Limits Study Presentation (v: 1)
...Limits Study WIST 12-17-09.ppt download>
Description: Dynamic Transfer Limits Study Presentation
Type: Presentation
Status: DRAFT
12/16/2009 PEFASecond Amendment (12.16.09) (v: 1)
...ndAmendment_sign(12.16.09).pdf download>
Description: PEFA Second Amendment, signed copy (12.16.09)
Type: Functional Agreement
Status: FINAL
Contact: Judith Embler contact via email>
12/14/2009 Cal ISO Dyn WP (v: 1)
CaISO Dyn WP.pdf download>
Description: Cal ISO Dyn WP
Type: Document (pdf)
Status: DRAFT
12/14/2009 Cal ISO Dyn Present (v: 1)
CaISO Dyn Present.pdf download>
Description: Cal ISO Dyn Present
Type: Document (pdf)
Status: DRAFT
12/14/2009 Cal ISO Dyn Agenda Abstract (v: 1)
CaISO Dyn Agenda Abstract.pdf download>
Description: Cal ISO Dyn Agenda Abstract
Type: Agenda
Status: DRAFT
12/11/2009 PSAST_TCRM_Phase1Report_Draft 5 (11.24.09) (v: Draft 5)
request access > login >
Description: PSAST TCRM Phase1 Report Draft 5
Type: Report
Status: DRAFT
Contact: Jonathan Young contact via email>
12/11/2009 Phase 2 Primary Outage (v: 1)
Phase2PrimaryOutageList.xls download>
Description: Phase 2 Primary Outage
Type: Spreadsheet
Status: DRAFT
Contact: Jonathan Young contact via email>
12/11/2009 PSAST Agenda (12.15.09) (v: 1)
PSAST_Dec15th_2009_Agenda.pdf download>
Description: PSAST Agenda (12.15.09)
Type: Agenda
Status: DRAFT
Contact: Jonathan Young contact via email>
12/11/2009 Action Items 12.9.09 (v: 1)
ActionItemsfrom12-9-09CGPM.pdf download>
Description: Action Items 12.9.09
Type: Minutes
Status: DRAFT
Contact: Marv Landauer, P.E. contact via email>
12/11/2009 Cross Cascades ST Notes (12.10.09) (v: 1)
...sCascadesSTnotes(12-10-09).pdf download>
Description: Cross Cascades ST Notes (12.10.09)
Type: Notes
Status: DRAFT
Contact: Marv Landauer, P.E. contact via email>
12/10/2009 WIST Agenda (v: 1)
WIST12-17-09DraftAgenda.pdf download>
Description: WIST Agenda
Type: Agenda
Status: DRAFT
Contact: Jeffrey C. Miller, P.E. contact via email>
12/09/2009 PSE Attachment K Presentation (v: 1)
Att K PSAT Meeting 2009.pdf download>
Description: PSE Attachment K Presentation
Type: Presentation
Status: DRAFT
12/08/2009 TEPPC Study Update ColumbiaGrid (12.09.09) (v: 1)
... Update ColumbiaGrid Dec 9.pdf download>
Description: TEPPC Study Update ColumbiaGrid Dec 9
Type: Presentation
Status: FINAL
12/08/2009 Ten Year Plan Cutout from Biennial Plan Update (v: 1)
TenYearPlan.pdf download>
Description: Ten Year Plan Cutout from Biennial Plan Update
Type: Document (pdf)
Status: DRAFT
Contact: Marv Landauer, P.E. contact via email>
12/07/2009 Cross Cascades Study Team Agenda (v: 1)
AgendaWoCST(12.10.09).pdf download>
Description: Cross Cascades Study Team Agenda
Type: Agenda
Status: DRAFT
Contact: Marv Landauer, P.E. contact via email>
12/07/2009 Cross Cascades Agenda (v: 1)
AgendaWoCST(12.10.09).pdf download>
Description: Cross Cascades Agenda
Type: Agenda
Status: DRAFT
Contact: Marv Landauer, P.E. contact via email>
11/25/2009 PSE Attachment K (v: 1)
PSE-AttKmtg.pdf download>
Description: PSE Attachment K
Type: Notice
Status: DRAFT
11/24/2009 FERC 890 ColumbiaGrid Comments Planning (11-23-09) (v: 1)
...omments_Planning(11-23-09).pdf download>
Description: FERC 890 Filing - ColumbiaGrid Comments Planning (11-23-09)
Type: Filing
Status: FINAL
Contact: Jeffrey C. Miller, P.E. contact via email>
11/12/2009 WIST Meeting Minutes (10.15.09) (v: 1)
WISTminutes(2009-10-15).pdf download>
Description: WIST Meeting Minutes (10.15.09)
Type: Minutes
Status: DRAFT
11/10/2009 2010 vs. 2009 vs. 2008 Winter NI Analysis (v: 1)
request access > login >
Description: 2010 vs. 2009 vs. 2008 Winter NI Analysis
Type: Spreadsheet
Status: DRAFT
Contact: Jonathan Young contact via email>
11/09/2009 PSAST Agenda (11.12.09) (v: 1)
PSASTAgenda(11.12.09).pdf download>
Description: PSAST Agenda (11.12.09)
Type: Agenda
Status: DRAFT
Contact: Jonathan Young contact via email>
10/29/2009 Action Items from CG Planning Mtg (10.27.09) (v: 1)
ctionItemsfrom10-27-09CGPM.pdf download>
Description: Action Items from CG Planning Mtg (10.27.09)
Type: Minutes
Status: DRAFT
Contact: Marv Landauer, P.E. contact via email>
10/29/2009 Planning Mtg Agenda (v: 1)
PlanningAgenda(12-9-09).pdf download>
Description: Planning Mtg Agenda
Type: Agenda
Status: DRAFT
Contact: Marv Landauer, P.E. contact via email>
10/29/2009 Gen Weight Factors HL Directional (v: 1)
...ightFactors_HL_Directional.pdf download>
Description: Gen Weight Factors HL Directional
Type: Spreadsheet
Status: DRAFT
Contact: Jonathan Young contact via email>
10/27/2009 Miller - TCWG - WECC Wide Planning and the SCG (v: 1)
...r-TCWG-WECCWidePlanningSCG.pdf download>
Description: Miller - TCWG - WECC Wide Planning and the SCG
Type: Presentation
Status: DRAFT
Contact: Jeffrey C. Miller, P.E. contact via email>
10/26/2009 Utility Project Summary (v: 1)
UtilityProjectsummary.xls download>
Description: Utility Project Summary
Type: Spreadsheet
Status: DRAFT
Contact: Marv Landauer, P.E. contact via email>
10/26/2009 NTTG Economic Study 2009 (v: 1)
NTTG-EconomicStudy-2009.pdf download>
Description: NTTG Economic Study 2009
Type: Presentation
Status: DRAFT
10/26/2009 CG 2010 Transmission Plan Draft (v: 1)
...d2010TransmissionPlanDraft.xls download>
Description: CG 2010 Transmission Plan Draft
Type: Spreadsheet
Status: DRAFT
Contact: Marv Landauer, P.E. contact via email>
10/21/2009 PSAST TCRM Report Draft (v: 1)
confidentiality agreement required >
Description: PSAST TCRM Report Draft
Type: Report
Status: DRAFT
Contact: Jonathan Young contact via email>
10/15/2009 WREZ Demonstration (v: 1)
WREZDemonstration.ppt download>
Description: WREZ Demonstration
Type: Presentation
Status: DRAFT
10/15/2009 Solar 1 (v: 1)
SOLAR1.xlsx download>
Description: Solar 1
Type: Spreadsheet
Status: DRAFT
10/15/2009 Hourly Wind Integration Model (v: 1)
...ly Wind Integration Model.xlsm download>
Description: Hourly Wind Integration Model
Type: Spreadsheet
Status: DRAFT
10/06/2009 PSAST Agenda (v: 1)
PSAST_Oct22nd_Agenda (2).pdf download>
Description: PSAST Agenda
Type: Agenda
Status: DRAFT
Contact: Jonathan Young contact via email>
10/06/2009 WIST Agenda (v: 1)
WIST10-15-09Agenda.pdf download>
Description: WIST Agenda
Type: Agenda
Status: DRAFT
10/06/2009 WIST Notes and Action Items (9.10.09) (v: 1)
...s and Action Items 9-10-09.doc download>
Description: WIST Notes and Action Items (9.10.09)
Type:
Status: DRAFT
10/06/2009 Simple Integration Model Studies (v: 1)
... Integration Model Studies.pdf download>
Description: Simple Integration Model Studies
Type: Document (pdf)
Status: DRAFT
10/06/2009 NWIF TWG Mtg (10.29.09) Agenda (v: 1)
IF TWG Mtg 10-29-09 Agenda.doc download>
Description: NWIF TWG Mtg (10.29.09) Agenda
Type: Agenda
Status: DRAFT
10/06/2009 DSL Schedule Request (v: 1)
DSL Schedule Request.doc download>
Description: DSL Schedule Request
Type: Document (pdf)
Status: DRAFT
10/06/2009 Solar Performance (v: 1)
Solar Performance.pdf download>
Description: Solar Performance
Type:
Status: DRAFT
09/28/2009 ColumbiaGrid Presentation (PSE) (v: 1)
...idPresentation(9.23.09)R01.pdf download>
Description: ColumbiaGrid Presentation (PSE)
Type: Presentation
Status: DRAFT
09/25/2009 PSAST TCRM Report Draft2 (v: 1)
request access > login >
Description: PSAST_TCRM_Report_Draft2
Type: Report
Status: DRAFT
Contact: Jonathan Young contact via email>
09/23/2009 Action Items from 9.22.09 Mtg (v: 1)
ActionItemsfrom9-22-09CGPM.pdf download>
Description: Action Items from 9.22.09 Mtg
Type: Minutes
Status: DRAFT
Contact: Marv Landauer, P.E. contact via email>
09/23/2009 Draft Planning Agenda (v: 1)
PlanningAgenda(10.27.09).pdf download>
Description: Draft Planning Agenda
Type: Agenda
Status: DRAFT
Contact: Marv Landauer, P.E. contact via email>
09/22/2009 SPG Coordination Group (v: 1)
SCG-Report.pdf download>
Description: SPG Coordination Group
Type: Presentation
Status: DRAFT
Contact: Jeffrey C. Miller, P.E. contact via email>
09/21/2009 10 Year Comparison (v: 1)
request access > login >
Description: 10 Year Comparison
Type: Spreadsheet
Status: DRAFT
Contact: Gordon Comegys, P.E. contact via email>
09/21/2009 Summer Wind Overload Comparison (v: 1)
request access > login >
Description: Summer Wind Overload Comparison
Type: Spreadsheet
Status: DRAFT
Contact: Gordon Comegys, P.E. contact via email>
09/21/2009 Narrative of Wind Generation Sensitivity Study with New 10 Year Cases (v: 1)
request access > login >
Description: Narrative of Wind Generation Sensitivity Study with New 10 Year Cases
Type: Report
Status: DRAFT
Contact: Gordon Comegys, P.E. contact via email>
09/21/2009 Narrative of 10 Year System Assessment Update Methodology (v: 1)
request access > login >
Description: Narrative of 10 Year System Assessment
Type: Report
Status: DRAFT
Contact: Gordon Comegys, P.E. contact via email>
09/16/2009 Restack Cluster Study (v: 1)
...ack_Cluster_Study_09-19-09.pdf download>
Description: Restack Cluster Study
Type: Report
Status: DRAFT
09/16/2009 2009 NOS Update (v: 1)
2009_NOS_Update_09-15-09.pdf download>
Description: 2009 NOS Update
Type: Report
Status: DRAFT
09/16/2009 2008 NOS Summary Timeline Map (v: 1)
...8_NOS_Summary_Timeline_Map.pdf download>
Description: 2008 NOS Summary Timeline Map
Type: Report
Status: DRAFT
09/16/2009 NOS PTSA Update (v: 1)
08_NOS_PTSA_Update.pdf download>
Description: NOS PTSA Update
Type: Report
Status: DRAFT
09/15/2009 PSAST Agenda (09.23.09) (v: 1)
PSAST_Sept23rd_Agenda.pdf download>
Description: PSAST Agenda
Type: Agenda
Status: FINAL
Contact: Jonathan Young contact via email>
09/15/2009 Standard TPL-001-1 - Transmission System Planning Performance Requirements (v: 1)
...1-1_Draft3_Clean_2009May26.pdf download>
Description: Standard TPL-001-1 - Transmission System Planning Performance Requirements
Type: Report
Status: DRAFT
09/15/2009 Standard PRC-006-01 Automatic Underfrequency Load Shedding (v: 1)
...UFLS_PRC-006-1_2009April20.pdf download>
Description: Standard PRC-006-01 Automatic Underfrequency Load Shedding
Type: Report
Status: DRAFT
09/15/2009 Reliability Functional Model Technical Document V.5 (v: 1)
...cument_V5_Clean_2009July21.pdf download>
Description: Reliability Functional Model Technical Document V.5
Type: Report
Status: DRAFT
09/14/2009 Tabbed Applicability Matrix (v: 1)
...-TabbedApplicabilityMatrix.xls download>
Description: Tabbed Applicability Matrix
Type: Spreadsheet
Status: DRAFT
Contact: Marv Landauer, P.E. contact via email>
09/14/2009 Wind Integration Model (v: 1)
2WindIntegrationModel.pdf download>
Description: Wind Integration Model
Type: Document (pdf)
Status: DRAFT
09/14/2009 Wind Integration Study Team 2009-09-10 (meeting minutes) (v: 1)
...grationStudyTeam2009-09-10.doc download>
Description: Wind Integration Study Team 2009-09-10 (meeting minutes)
Type: Minutes
Status: DRAFT
09/10/2009 WIST CAES Presentation (v: 1)
WIST CAES Sept 2009.ppt download>
Description: WIST CAES Presentation
Type: Presentation
Status: DRAFT
09/10/2009 Detailed Technical Studies Path 3 (v: 1)
technicalstudiesPath3.ppt download>
Description: Detailed Technical Studies Path 3
Type: Presentation
Status: DRAFT
09/10/2009 BPA 8-09 Wind Load (v: 1)
BPA 8-09 wind-load.JPG download>
Description: BPA 8-09 Wind Load
Type:
Status: DRAFT
09/10/2009 BPA Wind & Load System Peak 2008 (v: 1)
... and Load System Peak 2008.JPG download>
Description: BPA Wind & Load System Peak 2008
Type:
Status: DRAFT
09/10/2009 WIST 2012EC6A Update (v: 1)
WIST Sep10_2012EC6A Update.pdf download>
Description: WIST 2012EC6A Update
Type: Presentation
Status: DRAFT
09/04/2009 BPA-Adjacents listing+NERC status (v: 1)
...djacentslisting+NERCstatus.pdf download>
Description: BPA-Adjacents listing+NERC status
Type:
Status: FINAL
09/04/2009 Planning Authority Meeting Agenda 9-21-09 (v: 1)
...ity Meeting Agenda 9-21-09.pdf download>
Description: Planning Authority Meeting Agenda 9-21-09
Type: Agenda
Status: FINAL
Contact: Jeffrey C. Miller, P.E. contact via email>
09/04/2009 NERC Function Types (v: 1)
NERC Function Types.pdf download>
Description: NERC Function Types
Type: Report
Status: FINAL
Contact: Jeffrey C. Miller, P.E. contact via email>
09/04/2009 NERC Compliance Registry for ColumbiaGrid parties (v: 1)
...y for ColumbiaGrid parties.pdf download>
Description: NERC Compliance Registry for ColumbiaGrid parties
Type: Report
Status: FINAL
Contact: Jeffrey C. Miller, P.E. contact via email>
09/04/2009 Excerpt-NERC Rules of Procedures-Section 507 (v: 1)
...RCRulesofProcedures-Sec507.pdf download>
Description: Excerpt-NERC Rules of Procedures-Section 507
Type: Report
Status: FINAL
Contact: Jeffrey C. Miller, P.E. contact via email>
09/01/2009 WIST Mtg Notes & Action Items (v: 1)
...072109MtgNotes&ActionItems.pdf download>
Description: WIST Mtg Notes & Action Items
Type: Notes
Status: DRAFT
Contact: Jeffrey C. Miller, P.E. contact via email>
09/01/2009 DSS & WIST Integrated Draft Timeline (v: 1)
...egratedDraftTimeline081909.pdf download>
Description: DSS & WIST Integrated Draft Timeline
Type: Document (pdf)
Status: DRAFT
09/01/2009 WIST Agenda (v: 1)
WISTAgenda(9.10.09).pdf download>
Description: WIST Agenda
Type: Agenda
Status: DRAFT
Contact: Jeffrey C. Miller, P.E. contact via email>
08/31/2009 Final Language re MultiParty Open Season (8.27.09) (v: 1)
...arty Open Season (8.27.09).doc download>
Description: Final Language re MultiParty Open Season (8.27.09)
Type: Report
Status: DRAFT
Contact: Kristi Wallis contact via email>
08/31/2009 Proposed Comparability Revisions 8.10.09 (v: 1)
...rability Revisions 8.10.09.doc download>
Description: Proposed Comparability Revisions 8.10.09
Type: Report
Status: DRAFT
Contact: Kristi Wallis contact via email>
08/31/2009 Proposed Comparability Revisions 8 10 09-1 (v: 1)
...8 10 09-1 (Landauer edits).doc download>
Description: Proposed Comparability Revisions 8 10 09-1
Type: Report
Status: DRAFT
Contact: Kristi Wallis contact via email>
08/31/2009 Proposed CG Cost Allocation Revisions 8.10.09 (v: 1)
...location Revisions 8.10.09.doc download>
Description: Proposed CG Cost Allocation Revisions 8.10.09
Type: Report
Status: DRAFT
Contact: Kristi Wallis contact via email>
08/26/2009 Draft Language re:Multi-Party Open Season (v: 1)
...ge_reMulti-PartyOpenSeason.doc download>
Description: Draft Language re:Multi-Party Open Season
Type: Report
Status: DRAFT
Contact: Kristi Wallis contact via email>
08/18/2009 Proposed CG Cost Allocation Revisions (8.10. 09) (v: 1)
...ocationRevisions(8.10. 09).pdf download>
Description: Proposed CG Cost Allocation Revisions (8.10. 09)
Type: Document (pdf)
Status: FINAL
Contact: Kristi Wallis contact via email>
08/18/2009 Proposed Comparability Revisions (8.10.09) (v: 1)
...rabilityRevisions(8.10.09).pdf download>
Description: Proposed Comparability Revisions (8.10.09)
Type: Document (pdf)
Status: FINAL
Contact: Kristi Wallis contact via email>
08/18/2009 Joint Intervention PEFA (v: 1)
Joint Intervention PEFA.pdf download>
Description: Joint Intervention PEFA
Type: Filing
Status: FINAL
Contact: Kristi Wallis contact via email>
08/18/2009 ColumbiaGrid Rehearing Request (FINAL) (v: 1)
...umbiaGridReh'gRequestFINAL.pdf download>
Description: ColumbiaGrid Rehearing Request FERC filing (FINAL)
Type: Filing
Status: FINAL
Contact: Jeffrey C. Miller, P.E. contact via email>
08/18/2009 Action Items from 8.6.09 Mtg (v: 1)
ActionItemsfrom8-6-09CGPM.pdf download>
Description: Action Items from 8.6.09 Mtg
Type: Document (pdf)
Status: DRAFT
Contact: Marv Landauer, P.E. contact via email>
08/12/2009 PPL Energy Plus Comments (v: 1)
PPL_Energy_Plus_Comments.pdf download>
Description: PPL Energy Plus Comments of draft Garrison Pumped Storage study results
Type: Comments
Status: DRAFT
08/11/2009 Planning Agenda (9.22.09) (v: 1)
PlanningAgenda(9.22.09).pdf download>
Description: Planning Agenda (9.22.09)
Type: Agenda
Status: DRAFT
Contact: Marv Landauer, P.E. contact via email>
08/10/2009 Meeting Notes & Action Items (v: 1)
...072109MtgNotes&ActionItems.pdf download>
Description: Meeting Notes & Action Items
Type: Notes
Status: DRAFT
08/10/2009 WECC TEPPC 2012 Update (v: 1)
...PPC 2012 Update_21July (2).pdf download>
Description: WECC TEPPC 2012 Update
Type: Report
Status: FINAL
08/10/2009 Wind Model (v: 1)
Wind Model.pdf download>
Description: Wind Model
Type: Presentation
Status: FINAL
08/07/2009 Final Draft 10-year Cases & Contingency Definitions (zip file) (v: 1)
request access > login >
Description: Final Draft 10-year Cases & Contingency Definitions
Type: PowerWorld Auxiliary File
Status: DRAFT
Contact: Gordon Comegys, P.E. contact via email>
08/06/2009 Pages from Transmission Conference Agenda (v: 1)
...omTrans.ConfAgenda(8.6.09).pdf download>
Description: Pages from Transmission Conference Agenda
Type: Report
Status: DRAFT
08/06/2009 Cost Comp (v: 1)
CostComp(8.7.09).pdf download>
Description: Cost Comp
Type: Spreadsheet
Status: DRAFT
Contact: Marv Landauer, P.E. contact via email>
08/06/2009 Trojan-Horizon Presentation (v: 1)
...orizonPresentation(8-6-09).pdf download>
Description: Trojan-Horizon Presentation
Type: Presentation
Status: DRAFT
08/05/2009 NOS Update (v: 1)
...anningMtgNOSUpdate(8.6.09).pdf download>
Description: NOS Update
Type: Presentation
Status: DRAFT
08/05/2009 System Assessment Presentation (v: 1)
...ssmentPresentation(8.6.09).pdf download>
Description: System Assessment Presentation
Type: Presentation
Status: DRAFT
Contact: Marv Landauer, P.E. contact via email>
08/05/2009 Canada - Pacific NW - N. California Transmission Project (v: 1)
CNC-BEM(8.06.2009).pdf download>
Description: Canada - Pacific NW - N. California Transmission Project
Type: Presentation
Status: DRAFT
08/03/2009 Planning Meeting Draft Agenda (v: 1)
PlanningAgenda(8.6.09).pdf download>
Description: Planning Meeting Draft Agenda
Type: Agenda
Status: DRAFT
Contact: Marv Landauer, P.E. contact via email>
07/21/2009 Plexo Wind Integration Presentation (Toulson) (v: 1)
Wind_Integration(Toolson).pdf download>
Description: Wind Integration Presentation
Type: Presentation
Status: DRAFT
07/21/2009 PSAST Agenda (08.04.09) (v: 1)
PSASTAgenda 08.04.09.pdf download>
Description: PSAST Agenda for 08.04.09
Type: Agenda
Status: FINAL
Contact: Jonathan Young contact via email>
07/21/2009 Wind Analysis Presentation (v: 1)
...lysisPresentation(7.21.09).pdf download>
Description: Wind Analysis Presentation
Type: Presentation
Status: DRAFT
Contact: Marv Landauer, P.E. contact via email>
07/15/2009 NMCST Agenda (8.7.09) (v: 1)
NMCSTAgenda(8.7.09).pdf download>
Description: N. Mid C Agenda
Type: Agenda
Status: DRAFT
Contact: Marv Landauer, P.E. contact via email>
07/15/2009 Action Items from 6.09 Mtg (v: 1)
ActionItems(6-10-09)CGPM.pdf download>
Description: Action Items from 6.09 Mtg
Type: Minutes
Status: DRAFT
Contact: Marv Landauer, P.E. contact via email>
07/15/2009 WIST Agenda (7.21.09) (v: 1)
WISTAgenda(7.21.09).pdf download>
Description: WIST Agenda (7.21.09)
Type: Agenda
Status: DRAFT
Contact: Jeffrey C. Miller, P.E. contact via email>
06/26/2009 2009 System Assessment Contingency Analysis Overload List (v: 1)
request access > login >
Description: 2009 System Assessment Contingency Analysis Overload List
Type: Spreadsheet
Status: DRAFT
Contact: Gordon Comegys, P.E. contact via email>
06/26/2009 SupportingDataFor2009SystemAssessmentContingencyAnalysisOverloadList (v: 1)
request access > login >
Description: SupportingDataFor2009SystemAssessmentContingencyAnalysisOverloadList.zip
Type: Base Case
Status: DRAFT
Contact: Gordon Comegys, P.E. contact via email>
06/15/2009 Summer '09 Nomogram Analysis for PSAST (v: 1: this is a .zipped file)
request access > login >
Description: Summer '09 Nomogram Analysis for PSAST
Type: Spreadsheet
Status: DRAFT
Contact: Jonathan Young contact via email>
06/11/2009 Planning Assumptions (June 10, 2009) (v: 1)
...ssumptions for 10Jun09 Mtg.doc download>
Description: Planning Assumptions (June 10, 2009)
Type: Document (pdf)
Status: DRAFT
Contact: Gordon Comegys, P.E. contact via email>
06/10/2009 Overload Comparison Table (v: 2)
request access > login >
Description: Overload Comparison Table
Type: Spreadsheet
Status: DRAFT
Contact: Marv Landauer, P.E. contact via email>
06/10/2009 Basecase/Wind Diagrams (v: 1)
basecasediagrams.pdf download>
Description: Basecase/Wind Diagrams
Type: Presentation
Status: DRAFT
Contact: Tammy Beckwith contact via email>
06/09/2009 Weighted TCRM Generation Heavy Loading (v: 1)
WgtdTCRM _ GenHvyLoading.pdf download>
Description: Weighted TCRM Generation Heavy Loading
Type: Spreadsheet
Status: DRAFT
Contact: Jonathan Young contact via email>
06/08/2009 Draft Planning Agenda (6-10-09) (v: 2)
DraftAgenda(6-10-09)1.pdf download>
Description: Draft Planning Agenda (6-10-09)
Type:
Status: FINAL
Contact: Marv Landauer, P.E. contact via email>
06/08/2009 Col Grid 2009 Transmission Plan Draft (2) (v: 2)
...09TransmissionPlanDraft(2).xls download>
Description: Col Grid 2009 Transmission Plan Draft (2)
Type: Spreadsheet
Status: DRAFT
Contact: Marv Landauer, P.E. contact via email>
06/08/2009 2009 System Assessment 6-8-09 draft (v: 1)
...ystemAssessment6-8-09draft.doc download>
Description: 2009 System Assessment 6-8-09 draft
Type: Report
Status: DRAFT
Contact: Marv Landauer, P.E. contact via email>
06/08/2009 PSAST Agenda (v: 1)
PSASTAgenda(06.16.09).pdf download>
Description: PSAST Agenda (06.16.09)
Type: Agenda
Status: DRAFT
Contact: Jonathan Young contact via email>
06/05/2009 Cost Comparison (v: 1)
CostComp.pdf download>
Description: Cost Comparison for N. Mid C
Type: Spreadsheet
Status: DRAFT
Contact: Marv Landauer, P.E. contact via email>
06/05/2009 NMC Agenda (v: 1)
Agenda(5.28.09).pdf download>
Description: NMC Agenda
Type: Agenda
Status: DRAFT
Contact: Marv Landauer, P.E. contact via email>
05/21/2009 Wind Analysis (v: 1)
WindAnalysis(2)5.21.09.pdf download>
Description: Wind Analysis
Type: Presentation
Status: DRAFT
Contact: Marv Landauer, P.E. contact via email>
05/20/2009 WIST Work Plan (v: 1)
WISTWorkPlan.pdf download>
Description: WIST Work Plan
Type: Document (pdf)
Status: DRAFT
05/20/2009 WIST (v: 1)
WIST.pdf download>
Description: WIST
Type: Spreadsheet
Status: DRAFT
05/19/2009 Planning Wind Analysis (v: 1)
...nningWindAnalysis(5.20.09).pdf download>
Description: Planning Wind Analysis
Type: Presentation
Status: DRAFT
Contact: Marv Landauer, P.E. contact via email>
05/15/2009 WIST Agenda(5.21.09). (v: 1)
Agenda(5.21.09).pdf download>
Description: Agenda
Type: Agenda
Status: FINAL
Contact: Jeffrey C. Miller, P.E. contact via email>
05/13/2009 April 2009 PSANI Events & OCTAG Study Plan Update (v: 1)
request access > login >
Description: April 2009 PSANI Events & OCTAG Study Plan Update
Type: Report
Status: FINAL
Contact: Jonathan Young contact via email>
05/13/2009 Contingency Analysis Summary (5.11.09) (v: 2)
request access > login >
Description: Contingency Analysis Summary
Type: Spreadsheet
Status: DRAFT
Contact: Gordon Comegys, P.E. contact via email>
05/11/2009 Action Items From 5.07.09 Meeting (v: 1)
ActionItemsfrom5-7-09CGPM.pdf download>
Description: Action Items From 5.07.09 Meeting
Type: Report
Status: FINAL
Contact: Marv Landauer, P.E. contact via email>
05/07/2009 Contingency Aux Files - Optional Download (v: 2: Aux files to modify WECC cases and contingency definitions)
request access > login >
Description: Contingency Aux Files
Type: PowerWorld Auxiliary File
Status: DRAFT
Contact: Gordon Comegys, P.E. contact via email>
05/07/2009 2006 Wind Correlation Profiles (v: 1)
2006WindProfiles.pdf download>
Description: 2006 Wind Correlation
Type: Spreadsheet
Status: DRAFT
Contact: Marv Landauer, P.E. contact via email>
05/07/2009 Results Template (v: 1)
ResultsTemplate.pdf download>
Description: Results Template
Type: Spreadsheet
Status: DRAFT
Contact: Marv Landauer, P.E. contact via email>
05/07/2009 NTTG Study Matrix (v: 1)
TTGStudyMatrix(2009-05-07).pdf download>
Description: NTTG Study Matrix
Type: Document (pdf)
Status: DRAFT
05/07/2009 Requested Service Projects (v: 1)
...tedServiceProjects(5-7-09).pdf download>
Description: Requested Service Projects
Type: Presentation
Status: DRAFT
Contact: Jeffrey C. Miller, P.E. contact via email>
05/07/2009 DHM to WECC Board (04.29.09) fin (2) (v: 1)
...-WECCBoard(04.29.09)fin(2).pdf download>
Description: DHM to WECC Board (04.29.09) fin (2)
Type:
Status: DRAFT
05/07/2009 Excerpts from the NWPCC Load Forecast (v: 1)
...ptsNWPCCLoadForecast(5-09).pdf download>
Description: Excerpts from the NWPCC Load Forecast
Type: Presentation
Status: DRAFT
05/06/2009 I5 CG Update (v: 1)
I5_CG_Update_5_09.pdf download>
Description: I5 CG Update
Type: Presentation
Status: DRAFT
05/04/2009 N. Mid C Agenda (v: 1)
NMCSTAgenda(5.6.09).pdf download>
Description: N. Mid C Agenda
Type: Agenda
Status: DRAFT
Contact: Marv Landauer, P.E. contact via email>
04/28/2009 Grant's Kilroy Bldg (v: 1)
rant'sKilroyBldgDirections.pdf download>
Description: Grant's Kilroy Building location and directions
Type: Document (pdf)
Status: FINAL
Contact: Jonathan Young contact via email>
04/28/2009 PSAST Agenda (5.05.09) (v: 1)
PSASTMay5thAgenda.pdf download>
Description: PSAST May5th Agenda
Type: Agenda
Status: FINAL
Contact: Jonathan Young contact via email>
04/15/2009 Transmission Planning Update (v: 1)
Txn Planning (04.15.09).pdf download>
Description: Transmission Planning Update
Type: Presentation
Status: DRAFT
Contact: Jeffrey C. Miller, P.E. contact via email>
04/08/2009 Action Items from Planning Mtg 3.30.09 (v: 1)
risk of use agreement required >>
Description: Action Items from Planning Mtg 3.30.09
Type: Document (pdf)
Status: DRAFT
Contact: Marv Landauer, P.E. contact via email>
04/07/2009 Northern Mid-C Study Team Report (4.10.09) (v: 1)
...rn Mid-C Study Team Report.pdf download>
Description: Northern Mid-C Study Team Report
Type: Report
Status: DRAFT
Contact: Marv Landauer, P.E. contact via email>
04/07/2009 Wenatchee Area Map - Proposed (v: 1)
risk of use agreement required >>
Description: Wenatchee Area Map - Proposed
Type: Map
Status: DRAFT
Contact: Marv Landauer, P.E. contact via email>
04/07/2009 NMC Plan Summary (v: 1)
risk of use agreement required >>
Description: NMC Plan Summary
Type: Spreadsheet
Status: DRAFT
Contact: Marv Landauer, P.E. contact via email>
04/07/2009 Planning Meeting Agenda (Draft) (v: 1)
PlanningAgenda(5.7.09).pdf download>
Description: Planning Meeting Agenda (Draft)
Type: Agenda
Status: DRAFT
Contact: Marv Landauer, P.E. contact via email>
03/31/2009 Dynamic Scheduling (v: 1)
risk of use agreement required >>
Description: Dynamic Scheduling for WIST meeting
Type: Report
Status: DRAFT
03/30/2009 TEPPC Regional Planning White Paper (v: 1)
...regionalplanningwhitepaper.pdf download>
Description: TEPPC regional planning white paper
Type: Report
Status: DRAFT
03/25/2009 WIST Agenda (4.3.09) (v: 1)
Agenda(4.3.09).pdf download>
Description: WIST Agenda (4.3.09)
Type: Agenda
Status: DRAFT
Contact: Jeffrey C. Miller, P.E. contact via email>
03/24/2009 Old Version 13: PowerWorldBaseCasesCGmodified13HS1-14HW1-OldVersion13.zip (v: 1; (in Old Version 13) Supporting data for contingency analysis results.)
request access > login >
Description: PowerWorldBaseCasesCGmodified13HS1-14HW1-OldVersion13.zip
Type: PowerWorld Auxiliary File
Status: DRAFT
Contact: Gordon Comegys, P.E. contact via email>
03/24/2009 13HS1CG-ContingencyResults.xls (v: 1; Contingency analysis results for 2013 Summer)
request access > login >
Description: 13HS1CG-ContingencyResults.xls
Type: Spreadsheet
Status: DRAFT
Contact: Gordon Comegys, P.E. contact via email>
03/24/2009 14HW1CG-ContingencyResults.xls (v: 1; Contingency analysis results for 2013-2014 Winter)
request access > login >
Description: 14HW1CG-ContingencyResults.xls
Type: Spreadsheet
Status: DRAFT
Contact: Gordon Comegys, P.E. contact via email>
03/23/2009 Action Items from 2.25.09 Mtg (v: 1)
ActionItemsfrom2-25-09CGPM.pdf download>
Description: Action Items from 2.25.09 Mtg
Type: Notes
Status: DRAFT
Contact: Marv Landauer, P.E. contact via email>
03/23/2009 Draft Planning Agenda (3.31.09) (v: 1)
PlanningAgenda(3-31-09).pdf download>
Description: Draft Planning Agenda (3.31.09)
Type: Agenda
Status: DRAFT
Contact: Marv Landauer, P.E. contact via email>
03/18/2009 NMCST Agenda 4-3-09 (v: 1)
NMCST Agenda 4-3-09.pdf download>
Description: NMCST Agenda 4-3-09
Type: Agenda
Status: FINAL
Contact: Marv Landauer, P.E. contact via email>
03/16/2009 14HW1-13HS1-CG-AllChangesContingencyResults16mar09.zip (v: Modified WECC 14HW1 and 13HS1 cases with contingency results, updated 3.16.09)
request access > login >
Description: Modified WECC 14HW1 and 13HS1 cases with preliminary contingency results and supporting case development data. These were discussed during the March 3, 2009 WebEx conference
Type: Base Case
Status: DRAFT
Contact: Gordon Comegys, P.E. contact via email>
03/11/2009 Approved - 2009 Biennial Transmission Expansion Plan (v: 2)
transmissionplan2.pdf download>
Description: Approved 2009 Biennial Transmission Expansion Plan
Type: Report
Status: FINAL
Contact: Jeffrey C. Miller, P.E. contact via email>
03/09/2009 Northern Mid C Agenda (v: 1)
NMCSTAgenda(3.10.09).pdf download>
Description: Northern Mid C Agenda (3.10.09)
Type: Agenda
Status: DRAFT
Contact: Marv Landauer, P.E. contact via email>
03/05/2009 NI DS Study for CG WIST(3.5.09) (v: 1)
NIDSstudyCGWIST.pdf download>
Description: Powerex presentation: NI DS Study for CG WIST(3.5.09)
Type: Presentation
Status: DRAFT
Contact: Jeffrey C. Miller, P.E. contact via email>
03/04/2009 Northwest Wind Integration Forum Work Items Final Draft (v: 1)
...grationForumWorkItemsFinal.pdf download>
Description: Northwest Wind Integration Forum Work Items Final Draft
Type: Document (pdf)
Status: FINAL
Contact: Jeffrey C. Miller, P.E. contact via email>
03/02/2009 Excerpt from Draft NERC IVGTF Report (v: 1)
ExcerptDraftIVGTFreport.pdf download>
Description: Excerpt from Draft NERC IVGTF Report
Type: Report
Status: DRAFT
03/02/2009 Draft Issues List - WECC Variable Generation Subcommittee (v: 1)
...ableGenerationSubcommittee.pdf download>
Description: Draft Issues List - WECC Variable Generation Subcommittee
Type: Report
Status: DRAFT
03/02/2009 WIST Agenda (v: 1)
WISTagenda(3.5.09).pdf download>
Description: Wind Integration Study Team Agenda
Type: Agenda
Status: DRAFT
Contact: Jeffrey C. Miller, P.E. contact via email>
02/26/2009 14HW1CG & 13HS1CG Contingency Analysis Meeting (v: 1)
14HW1CG.doc download>
Description: 14HW1CG & 13HS1CG Contingency Analysis Meeting
Type: Agenda
Status: DRAFT
Contact: Gordon Comegys, P.E. contact via email>
02/26/2009 14hw1CG-13HS1CG-Contingency Results 2.25.09 (v: 1)
request access > login >
Description: 14hw1CG-13HS1CG-Contingency Results 2.25.09
Type: PowerWorld Auxiliary File
Status: DRAFT
Contact: Gordon Comegys, P.E. contact via email>
02/26/2009 Case Development Supporting Data (v: 1)
request access > login >
Description: Case Development Supporting Data
Type: PowerWorld Auxiliary File
Status: DRAFT
Contact: Gordon Comegys, P.E. contact via email>
02/26/2009 ATNI Energy Conf Agenda_Registration (v: 1)
...y Conf Agenda_Registration.pdf download>
Description: ATNI Energy Conf Agenda_Registration
Type: Agenda
Status: FINAL
02/25/2009 2009 Study Plan Agenda Item 7 (2.25.09) (v: 1)
2009 Study Plan.pdf download>
Description: 2009 Study Plan for agenda item 7
Type: Report
Status: DRAFT
Contact: Marv Landauer, P.E. contact via email>
02/25/2009 NERC Planning Authority Agenda Igem 12 (2.25.09) (v: 1)
...abbed Applicability Matrix.pdf download>
Description: NERC Planning Authority for agenda item 12
Type: Spreadsheet
Status: FINAL
Contact: Marv Landauer, P.E. contact via email>
02/24/2009 Draft Planning Agenda (2-25-09) (v: 1)
...Planning Agenda (2-25-09)1.pdf download>
Description: Draft Planning Agenda (2-25-09)
Type: Agenda
Status: FINAL
Contact: Marv Landauer, P.E. contact via email>
02/23/2009 Agenda Item 13d - EAC Report on Keeping the Lights On (v: 1)
EACReport-KeepingLightson.pdf download>
Description: Agenda Item 13d - EAC Report on Keeping the Lights On
Type: Report
Status: DRAFT
02/23/2009 Agenda Item 13b - Draft comments from WECC Seminar on Long Term Planning (v: 1)
...tsWECCSeminar-LongTermPlan.doc download>
Description: Agenda Item 13b - Draft comments from WECC Seminar on Long Term Planning
Type: Comments
Status: DRAFT
02/23/2009 Agenda Item 13a - WREZ Transmission Segment Map (v: 1)
WREZTransSegmentMap.ppt download>
Description: Agenda Item 13a - WREZ Transmission Segment Map
Type: Presentation
Status: DRAFT
02/23/2009 Agenda Item 13a - WREZ Transmission Assumptions (v: 1)
WREZTransAssumptions.ppt download>
Description: Agenda Item 13a - WREZ Transmission Assumptions
Type: Presentation
Status: DRAFT
02/23/2009 Agenda Item 13c - Green Power Superhighways Report (v: 1)
GreenPowerSuperhwysRept.pdf download>
Description: Agenda Item 13c - Green Power Superhighways Report
Type: Report
Status: DRAFT
02/18/2009 Resolution to adopt 2009 Txn Exp Plan (02.18.09) (v: 1)
...09 Txn Exp Plan (02.18.09).pdf download>
Description: Resolution to adopt 2009 Transmission Expansion Plan (02.18.09)
Type: Corporate Doc
Status: FINAL
Contact: Judith Embler contact via email>
02/10/2009 PSAST Feb 19th Agenda (2.19.09) (v: 1)
PSAST Feb19th Agenda.pdf download>
Description: PSAST Feb1 9th Agenda
Type:
Status: FINAL
01/30/2009 ContingencyAnalysisAuxFiles (v: 1)
request access > login >
Description: ContingencyAnalysisAuxFiles
Type: Base Case
Status: DRAFT
Contact: Gordon Comegys, P.E. contact via email>
01/30/2009 14hw1a-Contingency Results-case-without-corrections (v: 1)
request access > login >
Description: 14hw1a-Contingency Results-case-without-corrections
Type: Base Case
Status: DRAFT
Contact: Gordon Comegys, P.E. contact via email>
01/29/2009 Study Request to TEPPC 2009 (v: 1)
tudy Request to TEPPC 2009.pdf download>
Description: Study Request to TEPPC 2009
Type: Letter
Status: DRAFT
Contact: Marv Landauer, P.E. contact via email>
01/28/2009 2008 NOS Reg Eco Benefit_CG Briefing (v: 1)
...eg Eco Benefit_CG Briefing.pdf download>
Description: 2008 NOS Reg Eco Benefit_CG Briefing
Type: Presentation
Status: FINAL
01/28/2009 2008 NOS Recommendation_CG Briefing v1 (v: 1)
...ommendation_CG Briefing v1.pdf download>
Description: 2008 NOS Recommendation_CG Briefing v1
Type: Presentation
Status: FINAL
01/28/2009 Base Case Quality Assurance (v: 1)
BaseCaseQualityAssurance.pdf download>
Description: Base Case Quality Assurance
Type: Presentation
Status: DRAFT
Contact: Gordon Comegys, P.E. contact via email>
01/26/2009 Draft Planning Agenda (1.29.09) (v: 2)
...nning Agenda (1-29-09) (2).pdf download>
Description: Draft Planning Agenda (1.29.09)
Type: Agenda
Status: DRAFT
Contact: Marv Landauer, P.E. contact via email>
01/14/2009 PSAST Agenda (1.27.09) (v: 1)
PSAST Agenda (1.27.09).pdf download>
Description: PSAST Agenda (1.27.09)
Type: Agenda
Status: FINAL
Contact: Jonathan Young contact via email>
12/29/2008 Load Growth Est. By Owner (v: 1)
confidentiality agreement required >
Description: Load Growth Est. By Owner
Type: Spreadsheet
Status: FINAL
Contact: Gordon Comegys, P.E. contact via email>
12/29/2008 Load Growth Est. By Zone (v: 1)
confidentiality agreement required >
Description: Load Growth Estimates By Zone
Type: Base Case
Status: FINAL
Contact: Gordon Comegys, P.E. contact via email>
12/15/2008 Draft Planning Agenda (12-16-08) (v: 1)
...Planning Agenda (12-16-08).pdf download>
Description: Draft Planning Agenda (12-16-08)
Type: Agenda
Status: FINAL
Contact: Marv Landauer, P.E. contact via email>
12/15/2008 2009-2019 Transmission Expansion Plan Draft Presentation (v: 1)
TxExpPlan(12.16.08).pdf download>
Description: 2009-2019 Transmission Expansion Plan Draft Presentation
Type: Presentation
Status: DRAFT
Contact: Jeffrey C. Miller, P.E. contact via email>
12/15/2008 NWPP Voluntary Northwest Transmission Adequacy Guidelines (v: 1)
TAG_V0_final.doc download>
Description: NWPP Voluntary Northwest Transmission Adequacy Guidelines
Type: Report
Status: DRAFT
Contact: Jeffrey C. Miller, P.E. contact via email>
12/15/2008 PEFA Primer (v: 1)
PEFA PrimerRev2.pdf download>
Description: PEFA Primer
Type: Presentation
Status: DRAFT
Contact: Jeffrey C. Miller, P.E. contact via email>
12/12/2008 2009 System Assessment Preparation Supporting Data (v: 1)
request access > login >
Description: 16dec08, 2009 System Assessment Preparation Supporting Data
Type: Base Case
Status: FINAL
Contact: Gordon Comegys, P.E. contact via email>
12/12/2008 2009 CG System Assessment (v: 1)
...9 CG System Assessment (2).pdf download>
Description: 2009 CG System Assessment Presentation
Type: Presentation
Status: FINAL
Contact: Gordon Comegys, P.E. contact via email>
12/11/2008 NL Phase 1 Covering Letter Final 20081210 (v: 1)
...ring Letter Final 20081210.pdf download>
Description: NL Phase 1 Covering Letter Final 20081210
Type: Letter
Status: FINAL
12/08/2008 TAG_V0_final (12.09.08) (v: 1)
TAG_V0_final.pdf download>
Description: TAG_V0_final
Type: Report
Status: FINAL
Contact: Jeffrey C. Miller, P.E. contact via email>
12/03/2008 WECC Letter 11.14.08 (v: 1)
WECC ltr 11.14.08.pdf download>
Description: WECC Letter dated 11.14.08 regarding TEPPC study requests window open Dec 12 to Jan. 31
Type: Letter
Status: FINAL
12/03/2008 Study Request to TEPPC 2008 (v: 1)
tudy Request to TEPPC 2008.pdf download>
Description: Study Request to TEPPC 2008
Type: Letter
Status: FINAL
Contact: Marv Landauer, P.E. contact via email>
12/03/2008 2009-2019 Draft Transmission Expansion Plan (v: 1)
transmissionplan(12.3.08).pdf download>
Description: 2009-2019 Draft Transmission Expansion Plan
Type: Report
Status: DRAFT
Contact: Jeffrey C. Miller, P.E. contact via email>
12/02/2008 PSE Attachment K Meeting Notice & Agenda (11.09.08) (v: 1)
...Att K_PSAST Mtg Ntc&Agenda.pdf download>
Description: PSE Attachment K Meeting Notice & Agenda (11.09.08)
Type: Agenda
Status: FINAL
12/01/2008 PSAST Draft Agenda (12.09.08) (v: 1)
...T Draft Agenda (12.09.08).pdf download>
Description: PSAST Draft Agenda (12.09.08)
Type: Agenda
Status: DRAFT
Contact: Jonathan Young contact via email>
11/18/2008 CG Planning Meeting Presentation (v: 1)
Planningmtg(11.18.08).pdf download>
Description: CG Planning Meeting Presentation
Type: Presentation
Status: DRAFT
Contact: Marv Landauer, P.E. contact via email>
11/17/2008 Biennial Plan Group Agenda (11.18.08) (v: 1)
Agenda (11-18-08.pdf).pdf download>
Description: Biennial Plan Group Agenda (11.18.08)
Type: Agenda
Status: FINAL
Contact: Marv Landauer, P.E. contact via email>
11/14/2008 No. Mid-C Agenda (11-19-08) (v: 1)
NMCST Agenda 11-19-08.doc download>
Description: Agenda for November 19th North Mid Columbia study team meeting
Type: Agenda
Status: DRAFT
Contact: Amy Johnson contact via email>
11/14/2008 Winter 2009 Nomo Analysis (Powerex) (v: 1)
request access > login >
Description: Winter 2009 Nomo Analysis (Powerex)
Type: Document (pdf)
Status: FINAL
11/12/2008 PSAST Agenda (11.17.08) (v: 1)
PSASTAgenda(11.17.08).pdf download>
Description: PSAST Agenda (11.17.08)
Type: Agenda
Status: DRAFT
Contact: Jonathan Young contact via email>
10/31/2008 Preliminary Draft 2008-2018 Transmission Expansion Plan (v: 1)
prelimDRAFTtx_exp_Plan.doc download>
Description: Preliminary Draft 2008-2018 Transmission Expansion Plan
Type: Report
Status: DRAFT
Contact: Marv Landauer, P.E. contact via email>
10/31/2008 ColGrid 2008 Transmission Plan (10.30.08) (v: 1)
...ransmissionPlan(10.30.08)1.xls download>
Description: ColGrid 2008 Transmission Plan (10.30.08)
Type: Spreadsheet
Status: DRAFT
Contact: Marv Landauer, P.E. contact via email>
10/31/2008 2008 Biennial Plan Attachments (v: 1)
attachments1.pdf download>
Description: Biennial Plan Attachments
Type: Document (pdf)
Status: DRAFT
Contact: Marv Landauer, P.E. contact via email>
10/20/2008 Draft Agenda (10.22.08) (v: 1)
draftAgenda(10.22.08)2.pdf download>
Description: Draft Agenda (10.22.08)
Type: Agenda
Status: FINAL
Contact: Jeffrey C. Miller, P.E. contact via email>
10/17/2008 PSAST_NODO_Results.zip (v: 1)
request access > login >
Description: PSAST_NODO_Results
Type: Spreadsheet
Status: FINAL
Contact: Jonathan Young contact via email>
10/10/2008 NOS Update from BPA (v: 1)
NOSUpdate(10.09.08).pdf download>
Description: NOS Update from BPA
Type: Presentation
Status: DRAFT
10/08/2008 Regional Economic Analysis CG Final (v: 1)
Reg.Eco.Ana._CG.pdf download>
Description: Regional Economic Analysis CG Final
Type: Presentation
Status: DRAFT
10/07/2008 Biennial Plan Process & Schedule (v: 1)
Bien.Pro.Sched.(10.9.08).pdf download>
Description: Biennial Plan Process & Schedule
Type: Presentation
Status: DRAFT
Contact: Jeffrey C. Miller, P.E. contact via email>
10/07/2008 Regional Coordination Activities (v: 1)
Reg.Coor.Act.(10.9.08).pdf download>
Description: Regional Coordination Activities
Type: Presentation
Status: DRAFT
Contact: Jeffrey C. Miller, P.E. contact via email>
10/07/2008 Draft Agenda (10.9.08) (v: 2)
DraftAgenda(10.9.08)2.pdf download>
Description: Draft Agenda(10.9.08)
Type: Agenda
Status: FINAL
Contact: Jeffrey C. Miller, P.E. contact via email>
10/03/2008 CG Planning Policy Statement (10.03.07) (v: 2)
G Policy Statement_10308v2.pdf download>
Description: CG Planning Policy Statement (10.03.08)
Type: Policy/Procedure
Status: FINAL
Contact: Kristi Wallis contact via email>
09/23/2008 PSAST Agenda (09.25.08) (v: 1)
PSAST.Agenda(09.25.08)1.pdf download>
Description: PSAST Agenda
Type: Agenda
Status: DRAFT
Contact: Jeffrey C. Miller, P.E. contact via email>
09/18/2008 No. Mid-C Agenda (9-22-08) (v: 1)
Agenda (9-22-08).pdf download>
Description: Agenda (9-22-08)
Type: Agenda
Status: FINAL
Contact: Marv Landauer, P.E. contact via email>
09/15/2008 CG 2008 Transmission Plan Combined Changes (v: 1)
...ion Plan(8 29 08)_combined.pdf download>
Description: CG 2008 Transmission Plan with combined comments
Type: Spreadsheet
Status: DRAFT
Contact: Marv Landauer, P.E. contact via email>
09/15/2008 NTTG MT-MidC Line at CG Draft (v: 1)
NTTGMT-MidC(9.16.08).pdf download>
Description: NTTG MT-MidC Line at CG Draft
Type: Presentation
Status: DRAFT
09/15/2008 Biennial Planning Mtg Agenda 9-16-08 (v: 1)
Agenda(9.16.08).pdf download>
Description: Agenda
Type: Agenda
Status: DRAFT
Contact: Marv Landauer, P.E. contact via email>
09/12/2008 Attachment B - Resources used in Base Cases (v: 1)
...ources-basecases(9.12.08)2.doc download>
Description: Attachment B - Resources used in Base Cases
Type: Report
Status: DRAFT
Contact: Marv Landauer, P.E. contact via email>
09/12/2008 Summary of Sensitivity Studies - Draft (v: 1)
mSensitivityStudy(9.12.08).pdf download>
Description: Summary of Sensitivity Studies - Draft
Type: Report
Status: DRAFT
Contact: Marv Landauer, P.E. contact via email>
09/03/2008 CostAllocPrinciElPasoDiff (v: 1)
...here El Paso is different).pdf download>
Description: Allocation Principles (with notes where El Paso is different)
Type: Document (pdf)
Status: DRAFT
09/03/2008 DraftCGPresentation9.9.08FERC ConfCall (v: 1)
....9.08 FERC Conference Call.pdf download>
Description: DraftCGPresentation9.9.08FERC ConfCall
Type: Presentation
Status: DRAFT
Contact: Jeffrey C. Miller, P.E. contact via email>
09/02/2008 Involvement in Reg and Subreg Planning Proposed Strawman Language (v: 1)
...Proposed Strawman Language.pdf download>
Description: Involvement in Regional and Subregional Planning Proposed Strawman Language
Type: Presentation
Status: DRAFT
Contact: Jeffrey C. Miller, P.E. contact via email>
09/02/2008 CG Draft Confidential Information and CEII Proposed (v: 1)
...Proposed Strawman Language.pdf download>
Description: CG Draft Confidential Information and CEII Proposed
Type: Document (pdf)
Status: DRAFT
08/14/2008 NOS Update (v: 1)
...ing NOS Update 8-14-08 (2).pdf download>
Description: NOS Update
Type: Presentation
Status: FINAL
08/14/2008 NMC Map (v: 1)
NMC Map (2).pdf download>
Description: NMC Map
Type: Map
Status: FINAL
Contact: Marv Landauer, P.E. contact via email>
08/08/2008 Action Items 25 June 2008 (v: 1)
tion Items from 25June2008.pdf download>
Description: Action Items from 25 June 2008
Type:
Status: FINAL
Contact: Marv Landauer, P.E. contact via email>
08/08/2008 Mid-C Study Plan (v: 1)
Mid-C_Study Plan1.pdf download>
Description: Mid-C-Study Plan
Type:
Status: FINAL
Contact: Marv Landauer, P.E. contact via email>
08/08/2008 Agenda (08.15.08) (v: 1)
NMCST Agenda 8-15-08.pdf download>
Description: Agenda for August 15, 2008 meeting
Type: Agenda
Status: FINAL
Contact: Marv Landauer, P.E. contact via email>
08/04/2008 PSAST Agenda (v: 1)
PSAST_Agenda_080508_2.pdf download>
Description: PSAST Agenda
Type: Agenda
Status: DRAFT
Contact: Jeffrey C. Miller, P.E. contact via email>
07/21/2008 Planning Activities NMCST (v: 1)
... Activities NMCST(7.22.08).pdf download>
Description: Planning Activities Northern M-Columbia Study Team
Type: Presentation
Status: FINAL
Contact: Marv Landauer, P.E. contact via email>
07/09/2008 SubRegional Planning Grp Agenda (v: 1)
SPGagenda.pdf download>
Description: Agenda, Sub-Regional Planning Group
Type: Agenda
Status: DRAFT
Contact: Jeffrey C. Miller, P.E. contact via email>
07/02/2008 Biennial Planning Agenda 7.10.08 (v: 1)
... Plan Group Agenda 7.10.08.pdf download>
Description: Biennial Planning Agenda 7.10.08
Type: Agenda
Status: DRAFT
Contact: Marv Landauer, P.E. contact via email>
06/24/2008 Agenda (6-25-08) (v: 2)
NMCST Agenda 6-25-08f.pdf download>
Description: Agenda for Northern Mid-C June 25, 2008 Meeting
Type: Agenda
Status: FINAL
Contact: Marv Landauer, P.E. contact via email>
06/17/2008 Planning Activities Report (v: 1)
planning(06.18.08).pdf download>
Description: Planning Activities Report
Type: Presentation
Status: DRAFT
Contact: Jeffrey C. Miller, P.E. contact via email>
05/21/2008 IP Impact (5.21.08) (v: 1)
IP_Impact.pdf download>
Type: Spreadsheet
Status: FINAL
Contact: Marv Landauer, P.E. contact via email>
05/21/2008 Northern Mid-C Mtg Agenda (v: 1)
Agenda052108.pdf download>
Description: Agenda
Type: Agenda
Status: FINAL
Contact: Marv Landauer, P.E. contact via email>
05/21/2008 Mid-C Study Plan (v: 1)
Mid-C_Study Plan.pdf download>
Description: Mid-C Study Plan
Type: Document (pdf)
Status: DRAFT
Contact: Marv Landauer, P.E. contact via email>
05/21/2008 Action Items from April 2008 Mtg (v: 1)
ActionItems22April2008.pdf download>
Description: Action Items fron April 22, 2008 Meeting
Type: Document (pdf)
Status: DRAFT
Contact: Marv Landauer, P.E. contact via email>
05/20/2008 Planning Report (v: 1)
Planning(05.21.08).pdf download>
Description: Planning Report
Type: Presentation
Status: DRAFT
Contact: Jeffrey C. Miller, P.E. contact via email>
05/20/2008 N I Summer 2008 Operating Nomograms (FINAL) (v: final)
... Operating Nomograms_FINAL.pdf download>
Description: Northern Intertie Summer 2008 Operating Nomograms (FINAL)
Type:
Status: FINAL
05/20/2008 DCPUD_T-Line Overview (v: 1)
DCPUD_T-Line Overview.pdf download>
Description: DCPUD_T-Line Overview
Type: Document (pdf)
Status: DRAFT
Contact: Marv Landauer, P.E. contact via email>
05/19/2008 PSAST Agenda 5-20-08 Rev (v: 1)
Agenda 5-20-08r1.pdf download>
Description: PSAST Agenda
Type: Agenda
Status: FINAL
Contact: Jeffrey C. Miller, P.E. contact via email>
05/19/2008 NI Nomogram Analysis (v: 1)
NI Nomogram Analysis.pdf download>
Description: NI Nomogram Analysis
Type: Spreadsheet
Status: FINAL
05/19/2008 TCRM Nomograms Comparison (v: 1)
TCRM Nomograms Summary.pdf download>
Description: TCRM Nomograms Comparison for 2003-2008
Type: Presentation
Status: FINAL
05/19/2008 Rating Study Plan (v: 1)
Rating Study Plan 09may08.pdf download>
Description: NW - BC (Path3) Phase 1 Path Rating Study Plan presented to PSAST Ma6 20, 2008 meeting
Type: Presentation
Status: FINAL
05/15/2008 Draft PSAST TCRA Study Plan V6 (v: draft)
...t PSAST TCRA Study Plan V6.pdf download>
Description: Draft PSAST TCRA Study Plan version 6
Type: Document (pdf)
Status: DRAFT
Contact: Jeffrey C. Miller, P.E. contact via email>
05/14/2008 BCTC System Operating Order 7T -64 (v: 1)
SOO7T-64_12jul07.pdf download>
Description: BCTC System Operating Order 7T -64 12jul07
Type: Spreadsheet
Status: FINAL
Contact: Jeffrey C. Miller, P.E. contact via email>
05/14/2008 Summer 07 Nomograms for NI-Heavy Load (v: 1)
...(100) All Lines In Service.pdf download>
Description: Summer Nomograms for NI for Ingledow-Custer, heavy load
Type: Spreadsheet
Status: FINAL
Contact: Jeffrey C. Miller, P.E. contact via email>
05/14/2008 Winter 08 Nomograms for NI Light Load (v: 1)
...of 436Winter08_SNL_results.pdf download>
Description: Winter Nomograms for NI Ingledow-Custer, Light Load
Type: Spreadsheet
Status: FINAL
Contact: Jeffrey C. Miller, P.E. contact via email>
05/14/2008 Summer 07 Nomograms for NI-Light Load (v: 1)
...(100) All Lines In Service.pdf download>
Description: Summer 07 Nomograms for NI-Ingledow-Custer, Light Load
Type: Spreadsheet
Status: FINAL
Contact: Jeffrey C. Miller, P.E. contact via email>
05/13/2008 Winter 08 Nomograms for NI-Heavy Load (v: 1)
...of 436Winter08_SNH_results.PDF download>
Description: Winter 08 Nomograms for NI-Ingledow-Custer, Heavy Load
Type: Spreadsheet
Status: FINAL
Contact: Jeffrey C. Miller, P.E. contact via email>
05/09/2008 Path 3 Phase 1 Study Plan 23apr08 (2) (v: draft)
...e 1 study plan 23apr08 (2).pdf download>
Description: Path 3 Phase 1 Study Plan 23apr08 (2)
Type: Document (pdf)
Status: DRAFT
Contact: Jeffrey C. Miller, P.E. contact via email>
05/02/2008 System Assessment Report Needs Statement 2008 (5.02.08) (v: 2)
request access > login >
Description: System Assessment Report Needs Statement 2008 - Attachment H
Type: Document (pdf)
Status: DRAFT
Contact: Marv Landauer, P.E. contact via email>
04/29/2008 NOS Future Needs (04.30.08) (v: 1)
OS FutureNeeds(04.30.2008).pdf download>
Description: NOS Future Needs(04.30.08) - BPA report
Type: Report
Status: FINAL
Contact: Marv Landauer, P.E. contact via email>
04/29/2008 BPA WOCS Status (4.30.08) (v: 1)
BPA WOCS STATUS (4.30.08).pdf download>
Description: BPA West Of Cascades South Status Report
Type: Report
Status: FINAL
Contact: Marv Landauer, P.E. contact via email>
04/28/2008 Study Plans for Sensitivity Studies (v: 1)
SensitivityStudyPlans.pdf download>
Description: Study Plans for Sensitivity Studies
Type: Document (pdf)
Status: DRAFT
Contact: Marv Landauer, P.E. contact via email>
04/28/2008 Draft Agenda (v: 1)
Draft Agenda.pdf download>
Description: Draft Agenda for April 30, 2008 Meeting
Type: Agenda
Status: DRAFT
Contact: Marv Landauer, P.E. contact via email>
04/21/2008 Draft Agenda 4-22-08 (v: 2)
NMCST Agenda 4-22-08.pdf download>
Description: Draft Agenda for Initial Northern Mid-Columbia Transmission Meeting
Type: Agenda
Status: DRAFT
Contact: Marv Landauer, P.E. contact via email>
04/17/2008 Wanapum/Vantage-Midway Area 230 kV Tecnnical Report (v: 1)
request access > login >
Description: Wanapum/Vantage-Midway Area 230 kV Tecnnical Report - final version
Type: Report
Status: FINAL
Contact: Marv Landauer, P.E. contact via email>
04/17/2008 Mid C Needs Statement from System Assessmentt (v: 1)
request access > login >
Description: Mid-Columbia Needs Statement from 2008 System Assessment
Type: Document (pdf)
Status: DRAFT
Contact: Marv Landauer, P.E. contact via email>
04/17/2008 North of Wanapum/Vantage Kickoff (v: 1)
NorthWanVant_kickoff.pdf download>
Description: North of Wanapum/Vantage 230 kV Studies from BPA/Chelan/Grant Meeting - October 3, 2007
Type: Document (pdf)
Status: DRAFT
Contact: Marv Landauer, P.E. contact via email>
04/15/2008 Planning Report for Board 4.16.08 (v: 1)
PlanningReport(04.16.08).pdf download>
Description: Planning report includes system assessment report
Type: Presentation
Status: DRAFT
Contact: Jeffrey C. Miller, P.E. contact via email>
04/04/2008 PSAST Agenda (4.14.08) (v: 1)
PSASTAgenda041408.pdf download>
Description: Agenda
Type: Agenda
Status: DRAFT
Contact: Jeffrey C. Miller, P.E. contact via email>
04/04/2008 CG 2018 EHW Contingencies Consolidated_Comments (v: 7)
request access > login >
Description: CG 2018 EHW Contingencies Consolidated Comments
Type: Spreadsheet
Status: DRAFT
Contact: Jonathan Young contact via email>
04/04/2008 CG 2018 HS Contingencies Consolidated Comments (v: 3)
request access > login >
Description: CG 2018 HS Contingencies Consolidated Comments
Type: Spreadsheet
Status: DRAFT
Contact: Jonathan Young contact via email>
04/04/2008 CG 2018 HW Contingencies Consolidated_Comments (v: 12)
request access > login >
Description: CG 2018 HW Contingencies Consolidated Comments
Type: Spreadsheet
Status: DRAFT
Contact: Jonathan Young contact via email>
03/26/2008 I-5 Corridor Regional Planning Letter (v: 1)
-5 Corridorletter_3.14.08_.pdf download>
Description: I-5 Corridor Regional Planning Letter
Type: Letter
Status: FINAL
Contact: Jeffrey C. Miller, P.E. contact via email>
03/19/2008 CG Planning Presentation (v: 1)
...ard Presentation(03.19.08).pdf download>
Description: CG Planning Presentation for Board Meeting
Type: Presentation
Status: FINAL
Contact: Marv Landauer, P.E. contact via email>
03/13/2008 Draft Meeting Agenda (3.18.08) (v: 1)
BiennialMtgAgenda(3.18.08).pdf download>
Description: Meeting Agenda (3.18.08)
Type: Agenda
Status: DRAFT
Contact: Marv Landauer, P.E. contact via email>
03/13/2008 Issues to Address in Future Studies (3.14.08) (v: 1)
suesFutureStudies(3.18.08).pdf download>
Description: Issues to Address in Future Studies
Type:
Status: DRAFT
03/04/2008 CG 2018 HS Contingencies-AVA-Sno-Grant-BPA (v: 1)
request access > login >
Description: CG 2018 HS Contingencies AVA-Sno-Grant-BPA
Type: Spreadsheet
Status: DRAFT
Contact: Marv Landauer, P.E. contact via email>
03/03/2008 Report Schedule (v: 1)
Report Schedule.pdf download>
Description: Report Schedule
Type: Document (pdf)
Status: DRAFT
Contact: Marv Landauer, P.E. contact via email>
02/28/2008 Biennial Plan Agenda (v: 1)
BiennialPlanAgenda30408.pdf download>
Description: Biennial Plan Agenda for March 4, 2008
Type: Agenda
Status: FINAL
Contact: Marv Landauer, P.E. contact via email>
02/26/2008 WECC Acceptance Letter - Final (v: 1)
WOMGIP_RPR_final.pdf download>
Description: WECC accepts West of McNary Generation Integration Project Regional Planning Report
Type: Letter
Status: FINAL
Contact: Jeffrey C. Miller, P.E. contact via email>
02/26/2008 CG 2018 HW Contingencies (v: 10)
request access > login >
Description: CG 2018 HW Contingencies with comments
Type: Spreadsheet
Status: DRAFT
Contact: Marv Landauer, P.E. contact via email>
02/26/2008 CG 2018 EHW Contingencies (v: 5)
request access > login >
Description: CG 2018 EHW Contingencies with comments
Type: Spreadsheet
Status: DRAFT
Contact: Marv Landauer, P.E. contact via email>
02/19/2008 BiennialPlanPlanningAssumptions (v: 1)
...nningAssumptions(02.20.08).pdf download>
Description: Biennial Plan Planning Assumptions
Type: Report
Status: FINAL
Contact: Marv Landauer, P.E. contact via email>
02/19/2008 Planning Report (v: 1)
Planningreport(2.20.08).pdf download>
Description: Planning Report for February 20, 2008
Type: Report
Status: FINAL
Contact: Jeffrey C. Miller, P.E. contact via email>
02/11/2008 Obligations Policy (v: 2)
...ations Policy (v2) 1-23-08.pdf download>
Description: Obligations Policy (v.2)
Type: Report
Status: DRAFT
Contact: Marv Landauer, P.E. contact via email>
02/11/2008 Biennial Plan Group Agenda 2-14-08 (v: 1)
... Plan Group Agenda 2-14-08.pdf download>
Description: Biennial Plan Group Agenda 2-14-08
Type: Agenda
Status: FINAL
Contact: Marv Landauer, P.E. contact via email>
02/11/2008 CG 2018 HS Contingencies (v: 1)
request access > login >
Description: This spreadsheet contains all violations from N-1 and common mode outages run against the CG 2018 HS PowerWorld case. Each utility is expected to review these violations and provide comments.
Type: Spreadsheet
Status: DRAFT
Contact: Marv Landauer, P.E. contact via email>
02/05/2008 WECC - STP Roles In Planning Presentation (v: 1)
CC - STP Roles in Planning.pdf download>
Description: WECC - STP Roles In Planning PDF
Type: Document (pdf)
Status: FINAL
Contact: Jeffrey C. Miller, P.E. contact via email>
02/01/2008 I-5 Corridor Project Regional Planning Compliance Report (v: sent)
request access > login >
Description: I-5 Corridor Project Regional Planning Compliance Report to WECC (1.31.08)
Type: Report
Status: FINAL
Contact: Jeffrey C. Miller, P.E. contact via email>
01/28/2008 Draft Need Statement-Outline for Olympia Peninsula (v: Draft)
...tatement Olympia Peninsula.pdf download>
Description: Draft Need Statement Outline for the Olympia Peninsula
Type:
Status: DRAFT
Contact: Marv Landauer, P.E. contact via email>
01/28/2008 Biennial Plan Group Agenda 1-30-08 (v: 1)
... Plan Group Agenda 1-30-08.pdf download>
Description: Agenda
Type: Agenda
Status: FINAL
Contact: Marv Landauer, P.E. contact via email>
01/23/2008 1-5 Draft Report - Doc version (v: draft)
1-5 rptdraftdoc.doc download>
Description: 1-5 Draft Report without attachments - word document version for comment
Type: Report
Status: DRAFT
Contact: Dean Perry contact via email>
01/23/2008 I-5 Draft Compliance Report (01.23.07) (v: draft)
request access > login >
Description: 1-5 Corridor Reinforcement Project Regional Planning Compliance Report (Draft)
Type: Report
Status: DRAFT
Contact: Dean Perry contact via email>
01/17/2008 PEFA First Amendment (v: signed)
PEFA Amendment(12.19.07).pdf download>
Description: Amendment to the PEFA
Type: Functional Agreement
Status: FINAL
Contact: Kristi Wallis contact via email>
01/15/2008 PlanningPresentation(01.16.08) (v: 1)
...ningPresentation(01.16.08).pdf download>
Description: Planning Presentation for Jan. 16, 2008 Board of Directors' Meeting (01.16.08).
Type: Presentation
Status: FINAL
Contact: Jeffrey C. Miller, P.E. contact via email>
01/08/2008 WECC Coordinated Planning and Technical Studies(Final) (v: 1)
...d Technical Studies(Final).pdf download>
Description: WECC Coordinated Plan and Technical Studies
Type: Report
Status: FINAL
Contact: Marv Landauer, P.E. contact via email>
01/08/2008 Combined Wind Projects - Draft (v: 1)
combinedwindprojects.pdf download>
Description: Wind projects, construction, pending, operating
Type: Document (pdf)
Status: DRAFT
Contact: Tammy Beckwith contact via email>
01/08/2008 Upcoming ColumbiaGrid Studies (v: 1)
...oming ColumbiaGrid Studies.doc download>
Description: Upcoming ColumbiaGrid Studies
Type: Report
Status: DRAFT
Contact: Marv Landauer, P.E. contact via email>
01/08/2008 System Assessment Study Plan (v.4) 12-12 edits (v: 4)
...udy Plan (v.4) 12-12 edits.doc download>
Description: System Assessment Study Plan
Type: Report
Status: DRAFT
Contact: Marv Landauer, P.E. contact via email>
01/08/2008 Biennial Plan Group Agenda 1-09-08 (v: 1)
... Plan Group Agenda 1-09-08.doc download>
Description: Biennial Plan Group Agenda for 1-09-08
Type: Agenda
Status: FINAL
Contact: Marv Landauer, P.E. contact via email>
01/04/2008 Draft PSAST Agenda (01.10.08) (v: draft)
11008_Draft_PSAST_Agenda.pdf download>
Description: Draft PSAST Agenda
Type: Agenda
Status: DRAFT
Contact: Dean Perry contact via email>
01/02/2008 WOMGIP Regional Planning Report 12.31.07 (v: v2)
...nning Report v2 (12.31.07).pdf download>
Description: West of McNary Generation Integration Project Regional Planning Compliance Report
to WECC
Type: Report
Status: FINAL
Contact: Jeffrey C. Miller, P.E. contact via email>
12/31/2007 WOMGIP Regional Planning Report - Letter to WECC (v: 2)
...rt Cover Letter (12.31.07).pdf download>
Description: WOMGIP Regional Planning Report - Letter to WECC -
Type:
Status: FINAL
Contact: Dean Perry contact via email>
12/18/2007 DRAFT WOM Regional Planning Review Group Report to WECC (12.18.07) (v: draft)
..._121807 to RPRG for review.doc download>
Description: DRAFT WOM Regional Planning Review Group Report to WECC
Type: Report
Status: DRAFT
Contact: Dean Perry contact via email>
12/18/2007 Sea Breeze Slide Presentation (12.12.07) (v: 1)
...r CG Biennial Planning Mtg.pdf download>
Description: Sea Breeze Slide Presentation for Biennial Planning Meeting (12.12.07)
Type: Presentation
Status: FINAL
Contact: Marv Landauer, P.E. contact via email>
12/17/2007 I-5 Corridor Reinforcement Presentation (v: 121707)
...ia_Grid_I-5_Corridor_Dec17.pdf download>
Description: 1-5 Corridor Reinforcement Regional Review - presentation by BPA
Type: Presentation
Status: FINAL
Contact: Jeffrey C. Miller, P.E. contact via email>
12/14/2007 Biennial Planning Meeting-Action Items (12.12.07) (v: 1)
...ng-Action Items (12.12.07).pdf download>
Description: Act6ion Items from December 12, 2007 Meeting
Type:
Status: FINAL
Contact: Marv Landauer, P.E. contact via email>
12/12/2007 Tieline Flows (12.12.07) (v: 1)
Tieline Flows (12.12.07).xls download>
Description: Tieline Flows
Type: Spreadsheet
Status: DRAFT
Contact: Marv Landauer, P.E. contact via email>
12/12/2007 NW Gen Summary (12.12.07) (v: 1)
NW Gen Summary (12.12.07).xls download>
Description: NW Generation Summary - Participation Groups
Type: Spreadsheet
Status: DRAFT
Contact: Marv Landauer, P.E. contact via email>
12/12/2007 Contingency Results Comparions Summary (12.12.07) (v: 1)
...parions Summary (12.12.07).xls download>
Description: Contingency Results Comparions Summary
Type: Spreadsheet
Status: DRAFT
Contact: Marv Landauer, P.E. contact via email>
12/11/2007 Biennial Plan Report Outline (12.12.07) (v: 1)
... Report Outline (12.12.07).pdf download>
Description: Biennial Plan Report Outline
Type:
Status: DRAFT
Contact: Marv Landauer, P.E. contact via email>
12/11/2007 System Assessment Study Plan (v 3) 11.20.07 edits (v: 3)
...udy Plan (v 3) 11-20 edits.pdf download>
Description: System Assessment Study Plan 11-20-07 edits
Type: Report
Status: DRAFT
Contact: Marv Landauer, P.E. contact via email>
12/11/2007 120407 Winter_2008_Nomo_Analysis (v: 1)
... Winter_2008_Nomo_Analysis.zip download>
Description: Winter 2008 Nomogram Analysis for TRCM Discussion
Type: Spreadsheet
Status: FINAL
Contact: Dean Perry contact via email>
12/11/2007 Biennial Plan Group Agenda (12.12.07) (v: 2)
... Group Agenda 12-12-07 (2).pdf download>
Description: Biennial Planning Group Meeting Agenda 12-12-07
Type: Agenda
Status: FINAL
Contact: Marv Landauer, P.E. contact via email>
12/07/2007 GIANT Projects Study Plan (12.7.07 Draft) (v: 1)
...rojects Study Plan 12-7-07.pdf download>
Description: GIANT Projects Study Plan 12-7-07
Type: Presentation
Status: DRAFT
Contact: Jeffrey C. Miller, P.E. contact via email>
12/07/2007 Wind Integration Study Plan (12.7.07 draft) (v: 1)
...gration Study Plan 12-7-07.pdf download>
Description: Wind Integration Study Plan 12-7-07
Type: Presentation
Status: DRAFT
Contact: Jeffrey C. Miller, P.E. contact via email>
12/07/2007 Upcoming ColumbiaGrid Studies (12.7.07) (v: 2 )
...lumbiaGrid Studies 12-7-07.pdf download>
Description: Upcoming ColumbiaGrid Studies 12-7-07 draft
Type: Report
Status: DRAFT
Contact: Marv Landauer, P.E. contact via email>
11/28/2007 Draft Study Plan (12.04.07) (v: 2)
...Draft_Study_Plan_version_2.pdf download>
Description: Draft Study Plan v.2
Type: Report
Status: DRAFT
Contact: Dean Perry contact via email>
11/19/2007 Biennial Planning Meeting Agenda (11.20.07) (v: final)
... Group Agenda 11-20-07 (2).pdf download>
Description: 11-20-07 Biennial Planning Meeting Agenda
Type: Agenda
Status: FINAL
Contact: Marv Landauer, P.E. contact via email>
11/19/2007 PSASG Update Report (Final 11.16.07) (v: final)
...Report_2007 Nov 16 _Final_.pdf download>
Description: PSASG Update Report November 16, 2007 (Final)
Type: Report
Status: FINAL
Contact: Dean Perry contact via email>
11/19/2007 System Assessment Study Plan (11-15-07) (v: 1)
...sment Proposal 11-15 edits.pdf download>
Description: System Assessment Study Plan 11-15
Type: Report
Status: DRAFT
Contact: Marv Landauer, P.E. contact via email>
11/19/2007 Upcoming ColumbiaGrid Studies (v: 1)
...oming ColumbiaGrid Studies.pdf download>
Description: Upcoming ColumbiaGrid Studies
Type: Spreadsheet
Status: FINAL
Contact: Marv Landauer, P.E. contact via email>
11/14/2007 Treasurer's Report - PEFA Monthly Report (v: 1)
...A Monthly Report 11.14.07).pdf download>
Description: PEFA Monthly Report
Type: Financial
Status: FINAL
Contact: Judith Embler contact via email>
11/14/2007 Planning Activites Report (v: 1)
...ctivites Report (11.14.07).pdf download>
Description: Planning Activites Report
Type: Report
Status: FINAL
Contact: Jeffrey C. Miller, P.E. contact via email>
11/14/2007 Regional Projects with Impacts on ColGrid Facilities (v: 3)
...olumbiaGrid Facilities (3).pdf download>
Description: This list and analysis was developed from information available to ColumbiaGrid as of Oct 2007
Type: Report
Status: FINAL
Contact: Marv Landauer, P.E. contact via email>
11/06/2007 Base Case Load Levels (v: 1)
basecase load levels.pdf download>
Description: Base Case Load Levels
Type: Spreadsheet
Status: FINAL
Contact: Marv Landauer, P.E. contact via email>
11/06/2007 System Assessment Proposal (10.16.07 edits) (v: 2)
...t Proposal 10-16 edits (2).pdf download>
Description: System Assessment Proposal 10-16-07 edits
Type: Report
Status: DRAFT
Contact: Marv Landauer, P.E. contact via email>
10/29/2007 Attachment K Tech Conf Presentation - ColumbiaGrid (10.24.07) (v: final)
...tion - CG final (10 24 07).pdf download>
Description: Attachment K Technical Conference Presentation for ColumbiaGrid
Type: Presentation
Status: FINAL
Contact: Kristi Wallis contact via email>
10/22/2007 Attachment K Presentation - BPA final (10.22.07) (v: 2)
...ent K Presentation BPA (2).ppt download>
Description: Attachment K Presentation - BPA final(10.22.07)
Type: Presentation
Status: FINAL
10/22/2007 Attachment K Presentation Final - Avista (10.22.07) (v: Final)
... - Avista (10.22.07 final).pdf download>
Description: Attachment K
Type: Presentation
Status: FINAL
10/22/2007 Attachment K Presentation Final - TPWR (10.22.07) (v: Final)
...n - TPWR (10.22.07 final).pdf download>
Description: Attachment K presentation by Tacoma Power
Type: Presentation
Status: FINAL
10/22/2007 Attachment K Presentation Final - PSE (10.22.07) (v: 2)
...n - Puget (10.22.07 final).pdf download>
Description: Attachment K
Type: Presentation
Status: FINAL
10/19/2007 Puget Sound Energy PS Projects (10.18.07) (v: 1)
...rgy PS Projects (10.18.07).pdf download>
Description: Puget Sound Energy PS Projects (10.18.07).
Type: Presentation
Status: FINAL
10/16/2007 PEFA Quarterly Report (v: 1)
PEFA Quarterly Report.pdf download>
Description: Planning and Expansion Funding Agreement (PEFA) Quarterly Report
Type: Financial
Status: FINAL
Contact: Judith Embler contact via email>
10/16/2007 PSAST Meeting Agenda (10.18.07) (v: 2)
101807_Draft_Agenda_rev. 4.doc download>
Description: Draft Agenda for Oct 18 Meeting version 2
Type: Agenda
Status: FINAL
Contact: Dean Perry contact via email>
10/16/2007 BPA's Puget Sound Area Studies (v: 1)
... CG_PSASG101807_bkt wo map.ppt download>
Description: Overview and purpose of studies
Type: Presentation
Status: FINAL
10/16/2007 PSANI Re-Dispatch Agreement (v: 1)
...SANI_Re-Dispatch_Agreement.ppt download>
Description: Overview of the PSA Generation Redispatch Agreement
Type: Report
Status: DRAFT
10/16/2007 Risk Assessment for PSA (v: 1)
... 4 _Conger_Risk_Assessment.ppt download>
Description: Presentation/discussion of alternative RA methods that might be applicable to the PSA studies (probabilistic methods, TCRM, etc.)
Type: Presentation
Status: FINAL
10/16/2007 Transmission Adequacy Guidelines (v: 1)
...delines_-_2007_10_18_(GDM).ppt download>
Description: Presentation/discussion of the application of the NTAC TA Guidelines to the PSA. Identify and begin discussion of the issues.
Type: Presentation
Status: FINAL
10/16/2007 Draft PSASG Update Report (v: zipped)
...ate Report_11 Oct 2007.zap.zip download>
Description: Draft PSASG Update Report zipped (for ease of viewing and printing)
Type: Report
Status: FINAL
10/12/2007 Draft PSASG Update Report (v: 1)
..._Update_Report_2007_Oct_11.pdf download>
Description: Draft update to the 2004 Puget Sound Area Study Group Report: Assessment of Puget Sound Area/Northern Intertie Curtailment Risk
Type: Report
Status: FINAL
Contact: Dean Perry contact via email>
10/12/2007 Beverly Study July 2007 (v: 1)
...dyJuly_2007_final_draft JM.pdf download>
Description: Final draft of the Beverly Park project identified in the TPC Reliability Assessment of the NW Transmission System ("RANTS") report. This study reviews facility options to address future District load growth issues. One of the projects includes a 115-230kV transformer installation at the District Beverly Park switching station.
Type: Report
Status: FINAL
10/11/2007 Draft Agenda (v: 1)
101807_Draft_Agenda_rev 3.doc download>
Description: Draft Agenda PSAST Meeting on Octiober 18, 2007
Type: Agenda
Status: FINAL
Contact: Dean Perry contact via email>
10/05/2007 Biennial Plan Meeting Agenda (v: 1)
... Plan Group Agenda 10-9-07.doc download>
Type: Agenda
Status: FINAL
Contact: Marv Landauer, P.E. contact via email>
10/05/2007 Report Outlines (v: 1)
Report Outlines.doc download>
Description: System Assessment Report Outline
Type: Report
Status: FINAL
Contact: Marv Landauer, P.E. contact via email>
10/05/2007 System Assessment Proposal (v: 1)
... Study Plan 9-26 edits v.1.doc download>
Description: System Assessment Proposal
Type: Report
Status: DRAFT
Contact: Marv Landauer, P.E. contact via email>
10/04/2007 ColumbiaGrid Initial Transmission Plan (10.04.07) (v: 2)
...ssion Plan 10-4-2007 (v.2).xls download>
Description: Regional projects with a high level assessment of their impact to ColumbiaGrid facilities are summarized in (link). This summary includes projects proposed by others that might have impact on ColumbiaGrid facilities. This list was collected by ColumbiaGrid from available information. Comments are welcome.
Type: Spreadsheet
Status: DRAFT
Contact: Marv Landauer, P.E. contact via email>
09/27/2007 WOM 4500 Path Flows Comparison( 9.27.07) (v: 1)
...Flows Comparison( 9.27.07).pdf download>
Description: WOM 4500 Path Flows Comparison( 9.27.07) BPA
Type: Spreadsheet
Status: FINAL
Contact: Dean Perry contact via email>
09/25/2007 ColumbiaGrid Planning Areas Diagram (9.26.07) (v: 1)
...rid Planning Areas Diagram.pdf download>
Description: ColumbiaGrid Planning Areas Diagram
Type: Map
Status: FINAL
Contact: Marv Landauer, P.E. contact via email>
09/25/2007 2007 System Assessment Proposal (v: 1)
stem Assessment Study Plan.pdf download>
Description: 2007 System Assessment Proposal
Type:
Status: DRAFT
Contact: Marv Landauer, P.E. contact via email>
09/24/2007 Draft PSASG Update Report (v: 1)
...G_Update_Report_2007-09-19.pdf download>
Description: Draft PSASG Update Report, PSAST 9-24-2007 Mtg - Dobson-Mack
Type: Report
Status: DRAFT
Contact: Dean Perry contact via email>
09/24/2007 Nomogram Challenges (v: 1)
..._Combined_Nomogram_Example.ppt download>
Description: Winter 2007 Nomogram PSAST 9-24-2007 Agenda Item 3 - Dobson-Mack
Type: Presentation
Status: FINAL
Contact: Dean Perry contact via email>
09/24/2007 PSASG Project Update Report (v: 1)
... P. - PSASG_Project_Update.ppt download>
Description: Puget Sound Area Projects Update - PSAST 9-24-2007 Agenda Item 3 - Phillips
Type: Report
Status: FINAL
Contact: Dean Perry contact via email>
09/24/2007 PSA Study Team Meeting Final Agenda 9-24-2007 (v: 2)
...SA Study Team 083007 final.doc download>
Description: Final Agenda
Type: Agenda
Status: FINAL
Contact: Dean Perry contact via email>
09/24/2007 BPA TBL Operating Concerns - (v: 1)
...y Jackson presentation_07.ppt download>
Description: BPA TBL Operating Concerns
9-24-2007 PSAST Mtg Agenda Item 2 - Phillips
Type: Presentation
Status: FINAL
Contact: Dean Perry contact via email>
09/24/2007 NI OTC Uncertainty Challenges (v: 1)
...__OTC_Uncertainty_Examples.xls download>
Description: NI OTC uncertainty challenges PSA Mtg 9-24-2007 Agenda Item 2 - Gordon
Type: Presentation
Status: FINAL
Contact: Dean Perry contact via email>
09/24/2007 Puget Sound Area Northern Intertie Transmission History (v: 1)
...nd_Area_Northern_Intertie2.ppt download>
Description: Puget Sound Area Northern Intertie Transmission History PSA Mtg 9-24-07 Agenda Item 3 - Martinsen
Type: Presentation
Status: FINAL
Contact: Dean Perry contact via email>
09/24/2007 Outage Scheduling Challenges - Summer 2007 & Beyond (v: 1)
..._Outage_Presentation ver 2.ppt download>
Description: Outage Challenges Summer 2006 & Beyond - PSAST Mtg 9-24-2007 Agenda Item 2-Conger -
Type: Presentation
Status: FINAL
Contact: Dean Perry contact via email>
09/23/2007 NI Curtailment Risk Assessment (v: 1)
...ssessment_-_GDM_2007-09-24.ppt download>
Description: PEFA/Puget Sound/092407 Agenda Item 3 - Dobson-Mack NI_Curtailment_Risk_Assessment_-_GDM_2007-09-24.ppt
Type: Presentation
Status: FINAL
Contact: Dean Perry contact via email>
09/20/2007 CG Planning Report (9.19.07) (v: 1)
g-planning-report-19sept07.pdf download>
Description: CG Planning Report (9.19.07)
Type: Presentation
Status: FINAL
Contact: Marv Landauer, P.E. contact via email>
09/20/2007 10-Yr Planning Meeting Agenda (9.26.07) (v: 1)
...nning Group Agenda 9-26-07.pdf download>
Type: Agenda
Status: FINAL
Contact: Marv Landauer, P.E. contact via email>
09/20/2007 2007 System Assessment Proposal (v: 1)
...System Assessment Proposal.pdf download>
Type: Document (pdf)
Status: DRAFT
Contact: Marv Landauer, P.E. contact via email>
09/14/2007 Puget Sound Area Study Team Kick Off Meeting 09242007 Agenda (v: 1)
...ff Meeting 09242007 Agenda.pdf download>
Description: Proposed Agenda for Puget Sound Area Study Team Kick Off Meeting on 9/24/2007 at Puget Sound Energy Offices
Type: Agenda
Status: DRAFT
Contact: Dean Perry contact via email>
09/12/2007 Procedure to Access CEII Documents (v: Prodedure to Access CEII v.1.1)
Guideline to access CEII1.pdf download>
Description: To request access to information classified as Critical Energy infrastructure information (CEII), the requester must submit the request following this procedure.
Type: Policy/Procedure
Status: FINAL
09/05/2007 General Planning Areas Description (v: 1)
...Planning Areas Description.pdf download>
Description: General Planning Areas Description
Type: Report
Status: FINAL
Contact: Marv Landauer, P.E. contact via email>
02/02/2007 Planning and Expansion Functional Agreement FERC Filing (v: Accepted for filing by FERC)
...onal Agreement FERC Filing.pdf download>
Description: Includes the filing letter to the FERC
Type: Functional Agreement
Status: FINAL