Search Documents

Please note - this section requires that you ALLOW pop-ups and cookies. Please turn your pop-up blocker OFF, and ensure that your browser allows cookies.

 

SEARCH DOCUMENTS

Keyword:
Start Date:  
End Date:  
Type:
Working or Final:
Open For Comment:
Event:
Program:
Project:
Workgroup/Study Team:
Records Per Page
  Show All Versions for each Document

Older documents may be found archived on the previous ColumbiaGrid website here.

141 - 160 out of 1191.
More Results: 1   2   3   4   5   6   7   8   9   10   11   12   13   14   15   16   17   18   19   20  
21   22   23   24   25   26   27   28   29   30   31   32   33   34   35   36   37   38   39   40  
41   42   43   44   45   46   47   48   49   50   51   52   53   54   55   56   57   58   59   60  


04/21/2010 Test of 2010 System Assessment 10 Year Cases (Zipped File) (v: 1)   

request access >  login >
Description: Test of 2010 System Assessment 10 Year Cases (Zipped File)
Type: PowerWorld Auxiliary File
Status: DRAFT
Contact: Gordon Comegys, P.E.   contact via email>

 

04/21/2010 OASIS Update (04.21.20) (v: 1)   

OASISUpdate(04.21.20).pdf   download>
Description: OASIS Update (04.21.20)
Type: Presentation
Status: DRAFT
Contact: Dan Dettmer   contact via email>

 

04/21/2010 Planning Report (04.21.10) (v: 1)   

PlanningReport(04.21.10).pdf   download>
Description: Planning Report (04.21.10)
Type: Presentation
Status: FINAL
Contact: Marv Landauer, P.E.   contact via email>

 

04/20/2010 Puget Sound Transmission Expansion Plan Update (4.20.10) (v: 1)   

...dTransExpPlanStatus4-20-10.pdf   download>
Description: Puget Sound Transmission Expansion Plan Update (4.20.10
Type: Presentation
Status: DRAFT
Contact: Jeffrey C. Miller, P.E.   contact via email>

 

04/19/2010 Comments on 5 & 10 Year Cases (v: 1)   

CommentsMade.pdf   download>
Description: Comments on 5 & 10 Year Cases
Type: Comments
Status: DRAFT
Contact: Jeffrey C. Miller, P.E.   contact via email>

 

04/19/2010 Treasurers' Report (4.21.10) (v: 1)   

TreasurersReport(4.21.10).pdf   download>
Description: Treasurers' Report (4.21.10)
Type: Financial
Status: FINAL
Contact: Judith Embler   contact via email>

 

04/13/2010 N Mid C S12 (existing system, Pang & Alcoa 115 load added) (v: 1)   

request access >  login >
Description: North Mid C Summer 2012 base case, existing system, with Pangborn and Alcoa 115 load added.
Type: Base Case
Status: DRAFT
Contact: Marv Landauer, P.E.   contact via email>

 

04/13/2010 N Mid C S12 (5 utility projects, Pang & Alcoa 115 load added) (v: 1)   

request access >  login >
Description: North Mid C Summer 2012 base case, with 5 utility projects, Pangborn and ALcoa 115 load added
Type: Base Case
Status: DRAFT
Contact: Marv Landauer, P.E.   contact via email>

 

04/21/2010 WIST Report (v: 4)   

WISTReport(4.21.10).doc   download>
Description: WIST Report
Type:
Status: DRAFT
Contact: Marv Landauer, P.E.   contact via email>

 

04/09/2010 16HS2 Seed Case 1.5MB compressed file (.zip) (v: 1)   

request access >  login >
Description: Seed case for WECC 2016 Heavy Summer 2
Type: Base Case
Status: DRAFT
Contact: Area Coordinator   contact via email>

 

04/09/2010 WIST Update February 2010 (v: 1)   

WIT_Update_Feb_2010.pdf   download>
Description: WIST Update February 2010
Type: Notes
Status: DRAFT

 

04/09/2010 WIST 2.18.10 Notes (v: 1)   

WIST2-18-10Notes.doc   download>
Description: WIST 2.18.10 Notes
Type: Notes
Status: DRAFT

 

04/09/2010 Dynamic Transfer Limits Map (v: 1)   

dyn_transfer_limits map.pdf   download>
Description: Dynamic Transfer Limits Map
Type: Report
Status: DRAFT

 

04/09/2010 DTLS Results (v: 1)   

DTLS_results.pdf   download>
Description: DTLS Results
Type: Report
Status: DRAFT

 

04/09/2010 DTLS Methodology F (v: 1)   

DTLS_methodology_F1.pdf   download>
Description: DTLS Methodology F
Type: Report
Status: DRAFT

 

04/07/2010 16LA1-S Draft PreRunSubmittal 1.4 MB compressed file (.zip) (v: 1)   

request access >  login >
Description: 2016 light autumn 1 scenario case, draft prerun submittal
Type: Base Case
Status: DRAFT
Contact: Area Coordinator   contact via email>

 

04/07/2010 Traditional Power Flow Studies for 4_8_2008 (2.5 MB) (v: 1)   

request access >  login >
Description: Traditional power flow studies for Puget Sound area
Type: Presentation
Status: FINAL
Contact: Amy Johnson   contact via email>

 

04/07/2010 Board Agenda (04.21.10) (v: 1)   

Board Agenda (04.21.10).pdf   download>
Description: Board Agenda (04.21.10)
Type: Agenda
Status: FINAL
Contact: Judith Embler   contact via email>

 

04/07/2010 Board Notice (04.21.10) (v: 1)   

BoardNotice(04.21.10).pdf   download>
Description: Board Notice (04.21.10)
Type: Notice
Status: FINAL
Contact: Judith Embler   contact via email>

 

04/07/2010 New 500/230 kV transformer loadings (v: 1)   

request access >  login >
Description: Summary tables showing the loadings for 230 kV low side transformers with new transformers added at various locations
Type: Spreadsheet
Status: DRAFT
Contact: Amy Johnson   contact via email>

 


WHAT OUR MEMBERS SAY

Member: Seattle City Light      Project: ColumbiaGrid     
Seattle City Light

"ColumbiaGrid is an important part of the region's energy future. By working together cooperatively, all residents benefit. As a member of ColumbiaGrid, Seattle is committed to resolving issues that threaten the safe and reliable operation of our regional electric system in an environmentally sustainable manner."
~~ Jorge Carrasco, Superintendent, Seattle City Light