Search Documents

Please note - this section requires that you ALLOW pop-ups and cookies. Please turn your pop-up blocker OFF, and ensure that your browser allows cookies.

 

SEARCH DOCUMENTS

Keyword:
Start Date:  
End Date:  
Type:
Working or Final:
Open For Comment:
Event:
Program:
Project:
Workgroup/Study Team:
Records Per Page
  Show All Versions for each Document

Older documents may be found archived on the previous ColumbiaGrid website here.

621 - 640 out of 1191.
More Results: 1   2   3   4   5   6   7   8   9   10   11   12   13   14   15   16   17   18   19   20  
21   22   23   24   25   26   27   28   29   30   31   32   33   34   35   36   37   38   39   40  
41   42   43   44   45   46   47   48   49   50   51   52   53   54   55   56   57   58   59   60  


02/02/2009 01.29.09 Dynamic Scheduling System v0 009 clean (v: 1)   

...duling System v0 009 clean.pdf   download>
Description: 01.29.09 Dynamic Scheduling System v0 009 clean
Type: Report
Status: FINAL

 

01/30/2009 ContingencyAnalysisAuxFiles (v: 1)   

request access >  login >
Description: ContingencyAnalysisAuxFiles
Type: Base Case
Status: DRAFT
Contact: Gordon Comegys, P.E.   contact via email>

 

01/30/2009 14hw1a-Contingency Results-case-without-corrections (v: 1)   

request access >  login >
Description: 14hw1a-Contingency Results-case-without-corrections
Type: Base Case
Status: DRAFT
Contact: Gordon Comegys, P.E.   contact via email>

 

01/30/2009 ITAP outline pd comments clean (01.30.09 ) (v: 1)   

...ine013009 pdcomments clean.pdf   download>
Description: I-TAP outline comments clean 1.30.09
Type: Document (pdf)
Status: DRAFT
Contact: Patrick Damiano   contact via email>

 

01/29/2009 Study Request to TEPPC 2009 (v: 1)   

tudy Request to TEPPC 2009.pdf   download>
Description: Study Request to TEPPC 2009
Type: Letter
Status: DRAFT
Contact: Marv Landauer, P.E.   contact via email>

 

01/28/2009 2008 NOS Reg Eco Benefit_CG Briefing (v: 1)   

...eg Eco Benefit_CG Briefing.pdf   download>
Description: 2008 NOS Reg Eco Benefit_CG Briefing
Type: Presentation
Status: FINAL

 

01/28/2009 2008 NOS Recommendation_CG Briefing v1 (v: 1)   

...ommendation_CG Briefing v1.pdf   download>
Description: 2008 NOS Recommendation_CG Briefing v1
Type: Presentation
Status: FINAL

 

01/28/2009 Base Case Quality Assurance (v: 1)   

BaseCaseQualityAssurance.pdf   download>
Description: Base Case Quality Assurance
Type: Presentation
Status: DRAFT
Contact: Gordon Comegys, P.E.   contact via email>

 

01/27/2009 Joint Initiative Think Tank Presentation final ver1 (1 27 09) (v: 1)   

...nk Presentation final ver1.pdf   download>
Description: Joint Initiative Think Tank Presentation final ver1 (1 27 09)
Type: Presentation
Status: FINAL

 

01/26/2009 Attend Steet (1.21.09) (v: 1)   

Attend Steet (1.21.09).pdf   download>
Description: Attend Steet (1.21.09)
Type: Attendence Sheets
Status: FINAL
Contact: Sharon Whitlow   contact via email>

 

01/23/2009 01.21.09 Dynamic Scheduling System v0 008 (v: 1)   

...c Scheduling System v0 008.pdf   download>
Description: 01.21.09 Dynamic Scheduling System v0 008
Type: Report
Status: DRAFT

 

01/22/2009 Trans Srvc Request Common Queue Phased Approach (01.23.09) (v: 1)   

...mmon Queue Phased Approach.pdf   download>
Description: Long Term Transmission Serrvice Request Common Queue Phased Approach
Type: Document (pdf)
Status: FINAL
Contact: Dan Dettmer   contact via email>

 

01/22/2009 Work Plan for OASIS (01.23.09) (v: 1)   

Work Plan for OASIS.pdf   download>
Description: Work Plan for OASIS
Type: Timelines
Status: FINAL
Contact: Paul Arnold   contact via email>

 

01/22/2009 Proposed Agenda (01.23.09) (v: 1)   

Proposed Agenda (01.23.09).pdf   download>
Description: Proposed Agenda (01.23.09).
Type: Agenda
Status: FINAL
Contact: Paul Arnold   contact via email>

 

01/20/2009 BoardAgenda(1.21.09)2 (v: 1)   

BoardAgenda(1.21.09)2.pdf   download>
Description: Board Agenda (1.21.09)2
Type: Agenda
Status: FINAL
Contact: Judith Embler   contact via email>

 

01/20/2009 Planning Update on 2009 Plan (01.21.09) (v: 1)   

...te on 2009 Plan (01.21.09).pdf   download>
Description: Planning Update on 2009 Plan (01.21.09)
Type: Presentation
Status: FINAL
Contact: Marv Landauer, P.E.   contact via email>

 

01/26/2009 Draft Planning Agenda (1.29.09) (v: 2)   

...nning Agenda (1-29-09) (2).pdf   download>
Description: Draft Planning Agenda (1.29.09)
Type: Agenda
Status: DRAFT
Contact: Marv Landauer, P.E.   contact via email>

 

01/14/2009 PSAST Agenda (1.27.09) (v: 1)   

PSAST Agenda (1.27.09).pdf   download>
Description: PSAST Agenda (1.27.09)
Type: Agenda
Status: FINAL
Contact: Jonathan Young   contact via email>

 

01/14/2009 1.14.09 Final Within-Hour Schedule and Purchase Business Practices White Paper (v: 1)   

...ness Practices White Paper.pdf   download>
Description: 1.14.09 Final Within-Hour Schedule and Purchase Business Practices White Paper
Type: Document (pdf)
Status: FINAL
Contact: Kristi Wallis   contact via email>

 

01/12/2009 Fluid Dynamic Scheduler (1.08.09)v4.redline (v: 1)   

1.pdf   download>
Description: Fluid Dynamic Scheduler (1.08.09) v4.redline)
Type: Report
Status: DRAFT

 


WHAT OUR MEMBERS SAY

Member: Grant County PUD      Project: ColumbiaGrid     
Grant County PUD

"As the need increases to coordinate all aspects of the various transmission systems in the Northwest, Grant County PUD is looking to ColumbiaGrid to lead that effort in many areas. Joint transmission planning and a common OASIS are just two areas where we believe ColumbiaGrid is the cost-effective solution for bringing federal, investor-owned, and public power transmission owners into a common forum."
~~ Tim Culbertson, General Manager, Grant County PUD