All Programs > Planning and Expansion > Biennial Transmission Expansion Plan
Project: Biennial Transmission Expansion Plan

Biennial Transmission Expansion Plan Documents

Order By Type  |  Order By Date

12/28/2011 Public Review Draft 2012 Update to the 2011 Biennial Transmission Expansion Plan (v: 2)   

BP2012webdocument.pdf   download>
Description: Public Review Draft 2012 Update to the 2011 Biennial Transmission Expansion Plan
Type: Report
Status: DRAFT
Contact: Marv Landauer, P.E.   contact via email>

 

11/29/2011 2012 Table 1 Ten Year Plan (v: 2)   

Table1TenYearPlan11-28-11.xlsx   download>
Description: 2012 Biennial Transmission Plan Table 1 Ten Year Plan
Type: Spreadsheet
Status: DRAFT
Contact: Marv Landauer, P.E.   contact via email>

 

11/28/2011 Biennial Plan 2012 Attachments (v: 2)   

BP2012Attachments.pdf   download>
Description: Biennial Plan 2012 Attachments
Type: Document (pdf)
Status: DRAFT
Contact: Tammy Beckwith   contact via email>

 

11/28/2011 ColumbiaGrid 2012 Transmission Planning Draft 11.28.11(projects) (v: 1)   

...sionPlanningDraft11-28-11.xlsx   download>
Description: ColumbiaGrid 2012 Transmission Planning Draft 11.28.11(projects)
Type: Spreadsheet
Status: DRAFT
Contact: Marv Landauer, P.E.   contact via email>

 

11/08/2011 Biennial Plan 2012 DRAFT (v: 1)   

...ialPlan2012-PlanningDRAFT.docx   download>
Description: Biennial Plan 2012 DRAFT
Type: Report
Status: DRAFT
Contact: Marv Landauer, P.E.   contact via email>

 

08/23/2011 Draft Planning Agenda (11.10.11) (v: 1)   

...ftPlanningAgenda(11-10-11).pdf   download>
Description: Draft Planning Agenda (11.10.11)
Type: Agenda
Status: DRAFT
Contact: Marv Landauer, P.E.   contact via email>

 

06/20/2011 Planning Agenda (8.4.11) (v: 1)   

raftPlanningAgenda(8-4-11).pdf   download>
Description: Planning Agenda (8.4.11)
Type: Agenda
Status: DRAFT
Contact: Marv Landauer, P.E.   contact via email>

 

05/31/2011 PNW-CA Feasibility Study (06.02.11) (v: 1)   

pnw-ca_feasibility_study.pdf   download>
Description: PNW-CA Feasibility Study (06.02.11)
Type: Report
Status: FINAL

 

05/31/2011 BPA NW-CA Slides TUG BOG (06.02.11) (v: 1)   

...TUGBOG_CGPlanMtg2011-06-02.pdf   download>
Description: BPA NW-CA Slides TUG BOG (06.02.11)
Type: Report
Status: FINAL

 

05/31/2011 Brattle WIRES Jobs Study May2011 (06.02.11) (v: 1)   

...e-WIRES_Jobs_Study_May2011.pdf   download>
Description: Brattle WIRES Jobs Study May2011 (06.02.11)
Type: Report
Status: FINAL

 

05/31/2011 Planning Agenda 6.2.2011 (v: 1)   

raftPlanningAgenda(6-2-11).pdf   download>
Description: Planning Agenda 6.2.2011
Type: Agenda
Status: DRAFT
Contact: Marv Landauer, P.E.   contact via email>

 

05/27/2011 WECC DRAFT 10-Year Plan Summary (06.03.11) (v: 1)   

...DRAFT_10-Year_Plan_Summary.pdf   download>
Description: WECC DRAFT 10-Year Plan Summary (06.03.11)
Type: Report
Status: FINAL
Contact: Marv Landauer, P.E.   contact via email>

 

05/27/2011 SCG Update June 2011 (06.03.11) (v: 1)   

SCG_Update_June_2011.pdf   download>
Description: SCG Update June 2011
Type: Report
Status: FINAL
Contact: Jeffrey C. Miller, P.E.   contact via email>

 

05/27/2011 COI Utilization Report (06.02.11) (v: 1)   

coi_utilization_report.pdf   download>
Description: COI Utilization Report (06.02.11)
Type: Report
Status: FINAL
Contact: Marv Landauer, P.E.   contact via email>

 

05/06/2011 Action Items from 5.5.2011 (v: 1)   

ActionItemsfrom5-5-11CGPM.pdf   download>
Description: Action Items from 5.5.2011
Type: Minutes
Status: DRAFT
Contact: Marv Landauer, P.E.   contact via email>

 

05/05/2011 ColumbiaGrid 2012 Transmission Plan Draft (v: 1)   

...012TransmissionPlanDraft1.xlsx   download>
Description: ColumbiaGrid 2012 Transmission Plan Draft
Type: Spreadsheet
Status: DRAFT
Contact: Marv Landauer, P.E.   contact via email>

 

05/05/2011 CG Planning Meeting 5.5.2011 Presentation (v: 1)   

CGPlgMtg5-5-11.pdf   download>
Type: Presentation
Status: DRAFT
Contact: Marv Landauer, P.E.   contact via email>

 

05/05/2011 Updated PSAST Transmission Expansion Plan Results (presentation) (v: 1)   

...TTransExpPlanResults5-4-11.pdf   download>
Description: Updated PSAST Transmission Expansion Plan Results (presentation)
Type: Presentation
Status: DRAFT
Contact: Jonathan Young   contact via email>

 

05/04/2011 WECC New Transmission (v: 1)   

WECCNewTransmission.docx   download>
Description: WECC New Transmission
Type: Report
Status: DRAFT

 

05/04/2011 Table 1 CG 10 Year Plan (v: 1)   

Table1CG10YearPlan.xlsx   download>
Description: Table 1 CG 10 Year Plan
Type: Spreadsheet
Status: DRAFT
Contact: Marv Landauer, P.E.   contact via email>

 

05/02/2011 Agenda 5.5.11 (v: 2)   

raftPlanningAgenda(5-5-11).pdf   download>
Description: Agenda 5.5.11
Type: Agenda
Status: DRAFT
Contact: Marv Landauer, P.E.   contact via email>

 

04/25/2011 2010 Transmission Issues (v: 2)   

request access >  login >
Description: 2010 Transmission Issues
Type: Report
Status: DRAFT
Contact: Marv Landauer, P.E.   contact via email>

 

03/16/2011 Wind Sheds (v: 1)   

wind_sheds.pdf   download>
Description: Wind Sheds
Type: Map
Status: DRAFT
Contact: Marv Landauer, P.E.   contact via email>

 

03/16/2011 CG Planning Mtg WRS1-1 (3.17.11) (v: 1)   

CGPlgMtgWRS1-1 17Mar11.pdf   download>
Description: 2011 WECC Reliability Subcommittee Report
Type: Presentation
Status: DRAFT
Contact: Marv Landauer, P.E.   contact via email>

 

03/16/2011 2011 Study Requests (v: 1)   

2011StudyRequests1.doc   download>
Description: 2011 Study Requests
Type: Document (pdf)
Status: DRAFT
Contact: Marv Landauer, P.E.   contact via email>

 

03/16/2011 Table 5 Projects in System Assessment (v: 1)   

Table5ProjinSA.xlsx   download>
Description: Table 5 Projects in System Assessment
Type: Spreadsheet
Status: DRAFT
Contact: Marv Landauer, P.E.   contact via email>

 

03/16/2011 Table 1 Ten Year Plan (v: 1)   

Table1TenYearPlan.xlsx   download>
Description: Table 1 Ten Year Plan
Type: Spreadsheet
Status: DRAFT
Contact: Marv Landauer, P.E.   contact via email>

 

03/16/2011 Centralia Study Status 3.18.11 (v: 1)   

...traliaStudyStatus3-18-2011.pdf   download>
Description: Centralia Study Status 3.18.11
Type: Presentation
Status: DRAFT
Contact: Jeffrey C. Miller, P.E.   contact via email>

 

03/09/2011 Planning Agenda (3.17.11) (v: 1)   

aftPlanningAgenda(3-17-11).pdf   download>
Description: Planning Agenda (3.17.11)
Type: Agenda
Status: DRAFT
Contact: Marv Landauer, P.E.   contact via email>

 

03/09/2011 Action Items 1.27.11 (v: 1)   

ActionItemsfrom1-27-11CGPM.pdf   download>
Description: Action Items 1.27.11
Type: Minutes
Status: DRAFT
Contact: Marv Landauer, P.E.   contact via email>

 

03/07/2011 Approved 2011 Biennial Transmission Expansion Plan (v: 3)   

2011BiennialPlan.pdf   download>
Description: 2011 Biennial Transmission Expansion Plan
Type: Report
Status: FINAL
Contact: Jeffrey C. Miller, P.E.   contact via email>

 

01/10/2011 PSAST Action Items (v: 1)   

PSAST12-9-10ActionItems_r1.doc   download>
Description: PSAST Action Items
Type: Minutes
Status: DRAFT
Contact: Jonathan Young   contact via email>

 

01/10/2011 PSAST Agenda (2.3.11) (v: 1)   

PSAST_Feb3_Agenda.doc   download>
Description: PSAST Agenda (2.3.11)
Type: Agenda
Status: DRAFT
Contact: Jonathan Young   contact via email>

 

12/08/2010 PSE Attachment K PSAST Mtg 2010 (v: 1)   

PSEAttKPSATMtg(12-9-10).pdf   download>
Description: PSE Attachment K PSAST Mtg 2010
Type: Presentation
Status: DRAFT

 

12/03/2010 Action Items from 12.2.10 (v: 1)   

ActionItemsfrom12-2-10CGPM.pdf   download>
Description: Action Items from 12.2.10
Type: Minutes
Status: DRAFT
Contact: Marv Landauer, P.E.   contact via email>

 

12/03/2010 2011 Study Requests (v: 1)   

2011StudyRequests.doc   download>
Description: 2011 Study Requests
Type: Document (pdf)
Status: DRAFT
Contact: Marv Landauer, P.E.   contact via email>

 

12/03/2010 Planning Agenda (1.27.11) (v: 1)   

aftPlanningAgenda(1-27-11).pdf   download>
Description: Planning Agenda (1.27.11)
Type: Agenda
Status: DRAFT
Contact: Marv Landauer, P.E.   contact via email>

 

12/01/2010 Adjacent Circuit Criteria (v: 1)   

AdjCir12-9-10.pdf   download>
Description: Adjacent Circuit Criteria
Type: Presentation
Status: DRAFT
Contact: Marv Landauer, P.E.   contact via email>

 

12/01/2010 Centralia Shutdown Study Plan (v: 1)   

CentraliaShutdownStudyPlan.pdf   download>
Description: Centralia Shutdown Study Plan
Type: Report
Status: DRAFT
Contact: Gordon Comegys, P.E.   contact via email>

 

12/01/2010 WECC 10-Year Plan Update (v: 1)   

WECC10yearPlanUpdate.pdf   download>
Description: WECC 10-Year Plan Update
Type: Report
Status: DRAFT
Contact: Jeffrey C. Miller, P.E.   contact via email>

 

12/01/2010 PSAST Agenda 12.9.10 (v: 1)   

PSAST_Dec9_Agenda.pdf   download>
Description: PSAST Agenda 12.9.10
Type: Agenda
Status: DRAFT
Contact: Jonathan Young   contact via email>

 

11/19/2010 2011 Biennial Plan CEII Attachments (Zipped File) (v: 1)   

request access >  login >
Description: 2011 Biennial Plan CEII Attachments (Zipped File)
Type: Spreadsheet
Status: DRAFT

 

11/12/2010 Action Items from CG Planning Mtg 11.4.10 (v: 1)   

ActionItemsfrom11-4-10CGPM.pdf   download>
Description: Action Items from CG Planning Mtg 11.4.10
Type: Minutes
Status: DRAFT
Contact: Marv Landauer, P.E.   contact via email>

 

11/11/2010 PSE Transmission Customer Meeting Invitation (12.9.10) (v: 1)   

...erMeetingInvitation12-9-10.pdf   download>
Description: PSE Transmission Customer Meeting Invitation (12.9.10)
Type: Notice
Status: DRAFT

 

11/09/2010 Planning Mtg Agenda (12.2.10) (v: 1)   

aftPlanningAgenda(12-2-10).pdf   download>
Description: Planning Mtg Agenda (12.2.10
Type: Agenda
Status: DRAFT
Contact: Marv Landauer, P.E.   contact via email>

 

11/04/2010 Planning Meeting presentation (Marv) (v: 1)   

G Plg Mtg Exp Plg 11-4-10.pptx   download>
Description: Planning Meeting presentation (Marv)
Type: Presentation
Status: DRAFT
Contact: Marv Landauer, P.E.   contact via email>

 

11/04/2010 Ten Year Plan (v: 1)   

TenYearPlan.xlsx   download>
Description: Ten Year Plan
Type: Spreadsheet
Status: DRAFT
Contact: Marv Landauer, P.E.   contact via email>

 

11/03/2010 WECC 10 Year Plan Update (v: 1)   

WECC10yearPlanUpdate.pdf   download>
Description: WECC 10 Year Plan Update
Type: Presentation
Status: DRAFT

 

11/03/2010 Puget Sound Transmission Expansion Plan Status 11.4.10 (v: 1)   

...ExpansionPlanStatus11-4-10.pdf   download>
Description: Puget Sound Transmission Expansion Plan Status 11.4.10
Type: Presentation
Status: DRAFT
Contact: Jeffrey C. Miller, P.E.   contact via email>

 

11/03/2010 Sammamish-Lakeside-Talbot Sensitivity (PSAST) (v: 1)   

...e-TalbotSensitivity(PSAST).pdf   download>
Description: Sammamish-Lakeside-Talbot Sensitivity (PSAST)
Type: Presentation
Status: DRAFT
Contact: Amy Johnson   contact via email>

 

11/03/2010 Puget Sound Generation Levels (v: 1)   

PugetSoundGenerationLevels.pdf   download>
Description: Puget Sound Generation Levels
Type: Presentation
Status: DRAFT
Contact: Amy Johnson   contact via email>

 

11/03/2010 Draft Planning Agenda (10.19.10) (v: 3)   

...ftPlanningAgenda(11-4-10)1.pdf   download>
Description: Draft Planning Agenda (10.19.10)
Type: Agenda
Status: DRAFT
Contact: Marv Landauer, P.E.   contact via email>

 

11/03/2010 Walla Walla Area Wind Generation 10.29.10 (v: 1)   

...AreaWindGeneration10-29-10.pdf   download>
Description: Walla Walla Area Wind Generation 10.29.10
Type: Map
Status: DRAFT

 

09/27/2010 Action Items - Nomo Strat Session (8.23.10) (v: 1)   

...tratSession(v23August2010).zip   download>
Description: Action Items - Nomo Strat Session (8.23.10)
Type: Spreadsheet
Status: DRAFT
Contact: Jonathan Young   contact via email>

 

09/27/2010 Nomogram Strategy Session Agenda (10.01.10) (v: 1)   

Agenda(1October2010).doc   download>
Description: Nomogram Strategy Session Agenda (10.01.10)
Type: Agenda
Status: DRAFT
Contact: Jonathan Young   contact via email>

 

09/22/2010 PSAST Rerun TCRM Results (Zip file 6MB) (v: 1)   

request access >  login >
Description: PSAST Rerun TCRM Results
Type: Spreadsheet
Status: DRAFT
Contact: Jonathan Young   contact via email>

 

09/09/2010 BPA ATC Results 9.9.10 Tier 1 (v: 1)   

request access >  login >
Description: BPA ATC Results 9.9.10 Tier 1
Type: Spreadsheet
Status: DRAFT

 

08/27/2010 PSAST Agenda 9.28.10 (v: 1)   

PSAST_Sept28_Agenda.pdf   download>
Description: PSAST Agenda 9.28.10
Type: Agenda
Status: DRAFT
Contact: Jonathan Young   contact via email>

 

07/29/2010 Combined Winter 2010 S2N Heavy and Light EL-MO oos (v: 1)   

request access >  login >
Description: Combined Winter 2010 S2N Heavy and Light EL-MO oos
Type: Spreadsheet
Status: DRAFT
Contact: Jonathan Young   contact via email>

 

07/29/2010 PSA Net Load Definitions (v: 1)   

request access >  login >
Description: PSA Net Load Definitions
Type: Spreadsheet
Status: DRAFT
Contact: Jonathan Young   contact via email>

 

07/29/2010 PSE Gen vs Net Area Load (v: 1)   

request access >  login >
Description: PSE Gen vs Net Area Load
Type: Spreadsheet
Status: DRAFT
Contact: Jonathan Young   contact via email>

 

07/29/2010 Action Items & Points of Information from Nomo Strategy Session (7.20.10) (v: 1)   

request access >  login >
Description: Action Items & Points of Information from Nomo Strategy Session (7.20.10)
Type:
Status: DRAFT
Contact: Jonathan Young   contact via email>

 

07/29/2010 PSAST Action Items (v: 1)   

PSAST8-24-10ActionItems.pdf   download>
Description: PSAST Action Items
Type: Minutes
Status: DRAFT
Contact: Jonathan Young   contact via email>

 

07/29/2010 PSAST Agenda 08.24.10 (v: 1)   

PSAST_Aug24_Agenda.pdf   download>
Description: PSAST Agenda 08.24.10
Type: Agenda
Status: DRAFT
Contact: Jonathan Young   contact via email>

 

07/23/2010 Puget Sound Area Generation Modeling Guideline 6.23.10 (v: 2)   

request access >  login >
Description: Puget Sound Area Generation Modeling Guideline 6.23.10
Type: Report
Status: DRAFT
Contact: Jonathan Young   contact via email>

 

07/19/2010 White Paper ST Nomogram Improvement v19 (7.20.10) (v: 1)   

confidentiality agreement required >
Description: White Paper ST Nomogram Improvement v19 (7.20.10)
Type: Document (pdf)
Status: DRAFT
Contact: Jonathan Young   contact via email>

 

07/19/2010 Ordered Discussion Cases v19 (7.20.10) (v: 1)   

confidentiality agreement required >
Description: Ordered Discussion Cases v19 (7.20.10)
Type: Document (pdf)
Status: FINAL
Contact: Jonathan Young   contact via email>

 

07/19/2010 Draft Agenda Puget Sound Nomogram Strategy Session (7.20.10) (v: 1)   

...undNomogramStrategySession.pdf   download>
Description: Draft Agenda Puget Sound Nomogram Strategy Session (7.20.10)
Type: Agenda
Status: FINAL
Contact: Jonathan Young   contact via email>

 

07/14/2010 PSAST Agenda 7.28.10 (v: 1)   

PSAST_July28_Agenda.pdf   download>
Description: PSAST Agenda 7.28.10
Type: Agenda
Status: DRAFT
Contact: Jonathan Young   contact via email>

 

06/29/2010 PSAST 6.23.10 Action Items (v: 1)   

PSAST6-23-10ActionItems.doc   download>
Description: PSAST 6.23.10 Action Items
Type: Minutes
Status: DRAFT
Contact: Jonathan Young   contact via email>

 

06/25/2010 Action Items from 6.24.10 (v: 1)   

ctionItemsfrom6-24-10CGPM.docx   download>
Description: Action Items from 6.24.10
Type: Minutes
Status: DRAFT
Contact: Marv Landauer, P.E.   contact via email>

 

06/22/2010 Morgan Lewis - Energy LF FERC Proposed Rule on Transmission Planning & Cost Allocation (v: 1)   

...issionPlanning_18jun10 (2).pdf   download>
Description: Morgan Lewis - Energy LF FERC Proposed Rule on Transmission Planning & Cost Allocation
Type: Letter
Status: DRAFT

 

06/22/2010 Draft SCG Committed Potential Map (v: 1)   

...mmitted_PotentialMap-ver41.pdf   download>
Description: Draft SCG Committed Potential Map
Type: Map
Status: DRAFT

 

06/22/2010 Footnote B (v: 1)   

Footnoteb.pdf   download>
Description: Footnote B
Type: Document (pdf)
Status: DRAFT
Contact: Marv Landauer, P.E.   contact via email>

 

06/21/2010 PSAST Agenda (v: 1)   

PSAST_June23_Agenda.doc   download>
Description: PSAST Agenda
Type: Agenda
Status: DRAFT
Contact: Jonathan Young   contact via email>

 

06/21/2010 Action Items from 5.14.10 (v: 1)   

PSAST5-14-10ActionItems(2).pdf   download>
Description: Action Items from 5.14.10
Type: Minutes
Status: DRAFT
Contact: Jonathan Young   contact via email>

 

06/18/2010 Draft Planning Agenda (6.24.10) (v: 2)   

...ftPlanningAgenda(6-24-10)1.pdf   download>
Description: Draft Planning Agenda (6.24.10)
Type: Agenda
Status: DRAFT
Contact: Marv Landauer, P.E.   contact via email>

 

06/18/2010 Generation Modeling Guidelines (v: 1)   

...onModelingGuideline6-18-10.doc   download>
Type: Report
Status: DRAFT
Contact: Jonathan Young   contact via email>

 

05/19/2010 Path 3 Northwest to BC Thermal Upgrade Project Phase 1 Path Rating Report (v: 1)   

request access >  login >
Description: Path 3 Northwest to BC Thermal Upgrade Project Phase 1 Path Rating Report
Type: Report
Status: DRAFT

 

05/19/2010 Comprehensive Progress Report for Path 3 NW - BC (v: 1)   

request access >  login >
Description: Comprehensive Progress Report for Path 3 NW - BC
Type: Report
Status: DRAFT

 

05/14/2010 Study Results Review (v: 1)   

tudyResultsReview_5-14-10.pptx   download>
Description: Study Results Review
Type: Presentation
Status: DRAFT
Contact: Jonathan Young   contact via email>

 

05/13/2010 Powerex Comments on PSAST Plan (v: 1)   

...fMiller)rePSAExpPln5.12.10.doc   download>
Description: Powerex Comments on PSAST Plan
Type: Comments
Status: DRAFT

 

05/13/2010 PSAST Agenda (5.14.10) (v: 2)   

PSAST_May14_Agenda_r1.pdf   download>
Description: PSAST Agenda (5.14.10)
Type: Agenda
Status: DRAFT
Contact: Jonathan Young   contact via email>

 

05/12/2010 BPA/CG Meeting Minutes 4.23.10 (v: 1)   

...ingMinutes_04-23-10_v5 (2).doc   download>
Description: BPA/CG Meeting Minutes 4.23.10
Type: Minutes
Status: DRAFT

 

05/11/2010 BPA Cost Estimate Request (v: 1)   

BPACostEstimateRequest.pdf   download>
Description: BPA Cost Estimate Request
Type: Document (pdf)
Status: DRAFT
Contact: Jeffrey C. Miller, P.E.   contact via email>

 

05/11/2010 PSE Cost Estimate Request (v: 1)   

PSECostEstimateRequest.pdf   download>
Description: PSE Cost Estimate Request
Type: Document (pdf)
Status: DRAFT
Contact: Jeffrey C. Miller, P.E.   contact via email>

 

05/11/2010 SCL Cost Estimate Request (v: 1)   

SCLCostEstimateRequest.pdf   download>
Description: SCL Cost Estimate Request
Type: Document (pdf)
Status: DRAFT
Contact: Jeffrey C. Miller, P.E.   contact via email>

 

05/11/2010 2010 Biennial Expansion Plan Update (v: 1)   

2010BiennialPlan2.pdf   download>
Description: 2010 Biennial Expansion Plan Update
Type: Report
Status: FINAL
Contact: Jeffrey C. Miller, P.E.   contact via email>

 

05/04/2010 PSAST Action Items (5.14.10) (v: 1)   

...ea Study Team Action Items.doc   download>
Description: PSAST Action Items (5.14.10)
Type: Minutes
Status: DRAFT
Contact: Jonathan Young   contact via email>

 

05/04/2010 PSAST May 19 Agenda (v: 1)   

PSAST_May19_Agenda.pdf   download>
Description: PSAST May 19 Agenda
Type: Agenda
Status: FINAL
Contact: Jonathan Young   contact via email>

 

04/22/2010 Action Items from 4.20.10 Planning Mtg (v: 1)   

ActionItemsfrom4-20-10.pdf   download>
Description: Action Items from 4.20.10 Planning Mtg
Type: Notes
Status: DRAFT
Contact: Marv Landauer, P.E.   contact via email>

 

04/19/2010 Comments on 5 & 10 Year Cases (v: 1)   

CommentsMade.pdf   download>
Description: Comments on 5 & 10 Year Cases
Type: Comments
Status: DRAFT
Contact: Jeffrey C. Miller, P.E.   contact via email>

 

04/06/2010 BPA comments on Puget Sound Area Transmission Expansion Plan (v: 1)   

...3-23-2010_reviewShortTPPv1.pdf   download>
Description: BPA comments on Puget Sound Area Transmission Expansion Plan
Type: Comments
Status: DRAFT

 

04/05/2010 PSAST Agenda (4.8.10) (v: 1)   

PSAST_April8_Agenda_r1.pdf   download>
Description: PSAST Agenda (4.8.10)
Type: Agenda
Status: DRAFT
Contact: Jonathan Young   contact via email>

 

04/02/2010 Addendum to NMC Report (v: 1)   

request access >  login >
Description: Addendum to NMC Report
Type: Report
Status: DRAFT
Contact: Marv Landauer, P.E.   contact via email>

 

03/23/2010 Puget Sound Area Expansion Plan Supporting Doc (Zipped File) (v: 1)   

request access >  login >
Description: Puget Sound Area Expansion Plan Supporting Doc (Zipped File)
Type: Spreadsheet
Status: DRAFT
Contact: Jonathan Young   contact via email>

 

03/23/2010 Puget Sound Area Expansion Plan 3.23.10 (v: 1)   

request access >  login >
Description: Puget Sound Area Expansion Plan 3.23.10
Type: Report
Status: DRAFT
Contact: Jonathan Young   contact via email>

 

03/18/2010 Action Items (3.2.10) (v: 1)   

ActionItemsfrom3-2-10CGPM.pdf   download>
Description: Action Items (3.2.10)
Type: Minutes
Status: DRAFT
Contact: Marv Landauer, P.E.   contact via email>

 

03/04/2010 Planning Agenda (4.20.10) (v: 1)   

aftPlanningAgenda(4-20-10).pdf   download>
Description: Planning Agenda (4.20.10)
Type: Agenda
Status: DRAFT
Contact: Marv Landauer, P.E.   contact via email>

 

03/03/2010 WIST Report Outline (v: 1)   

WISTReportOutline.pdf   download>
Description: WIST Report Outline
Type: Report
Status: DRAFT
Contact: Marv Landauer, P.E.   contact via email>

 

03/02/2010 Lancaster Loop - Avista Presentation (v: 1)   

Lancaster_Loop_in.ppt   download>
Description: Lancaster Loop - Avista Presentation
Type: Presentation
Status: DRAFT

 

03/02/2010 Study Plan 1.25.10 (v: 1)   

StudyPlan25Jan10(2).pdf   download>
Description: Study Plan 1.25.10
Type: Agenda
Status: DRAFT
Contact: Marv Landauer, P.E.   contact via email>

 

02/26/2010 SPSC Miller Presentation - SCG (1.29.10) (v: 1)   

...rPresentationonSCG-1-29-10.pdf   download>
Description: SPSC Miller Presentation - SCG (1.29.10)
Type: Presentation
Status: DRAFT
Contact: Jeffrey C. Miller, P.E.   contact via email>

 

02/26/2010 Puget Sound Reinforcements (2.17.10) (v: 1)   

...SoundReinforcements2-17-10.pdf   download>
Description: Puget Sound Reinforcements (2.17.10)
Type: Presentation
Status: DRAFT
Contact: Jeffrey C. Miller, P.E.   contact via email>

 

02/03/2010 Puget Soung Area Expansion Plan (v: 1)   

...ansionPlan1-2010-Version3a.doc   download>
Type: Report
Status: DRAFT
Contact: Jonathan Young   contact via email>

 

01/27/2010 Draft Action Items from 1.26.10 (v: 1)   

ActionItemsfrom1-26-10CGPM.pdf   download>
Description: Draft Action Items from 1.26.10
Type: Minutes
Status: DRAFT
Contact: Marv Landauer, P.E.   contact via email>

 

01/27/2010 Draft Planning Agenda (v: 1)   

raftPlanningAgenda(3-2-10).pdf   download>
Description: Draft Planning Agenda
Type: Agenda
Status: DRAFT
Contact: Marv Landauer, P.E.   contact via email>

 

01/25/2010 Draft Planning Agenda (v: 1)   

aftPlanningAgenda(1-26-10).pdf   download>
Description: Draft Planning Agenda;
Type: Agenda
Status: DRAFT
Contact: Marv Landauer, P.E.   contact via email>

 

12/23/2009 PSAST TCRM Phase 1 Report (v: 1)   

...RM_Phase1Report_FinalDraft.pdf   download>
Description: Puget Sound Area Study Team Report
Type: Report
Status: FINAL
Contact: Jonathan Young   contact via email>

 

12/23/2009 PV Basecase Preparation (Large Zip File) (v: 1)   

request access >  login >
Description: PV Basecase Preparation
Type: PowerWorld Auxiliary File
Status: DRAFT
Contact: Gordon Comegys, P.E.   contact via email>

 

12/22/2009 Puget Sound Area StudyTeam Action Items (12.15.09)(2) (v: 1)   

...amActionItems(12.15.09)(2).pdf   download>
Description: Puget Sound Area Study Team Action Items(12.15.09)(2)
Type: Minutes
Status: FINAL
Contact: Jonathan Young   contact via email>

 

12/11/2009 PSAST_TCRM_Phase1Report_Draft 5 (11.24.09) (v: Draft 5)   

request access >  login >
Description: PSAST TCRM Phase1 Report Draft 5
Type: Report
Status: DRAFT
Contact: Jonathan Young   contact via email>

 

12/11/2009 Phase 2 Primary Outage (v: 1)   

Phase2PrimaryOutageList.xls   download>
Description: Phase 2 Primary Outage
Type: Spreadsheet
Status: DRAFT
Contact: Jonathan Young   contact via email>

 

12/11/2009 PSAST Agenda (12.15.09) (v: 1)   

PSAST_Dec15th_2009_Agenda.pdf   download>
Description: PSAST Agenda (12.15.09)
Type: Agenda
Status: DRAFT
Contact: Jonathan Young   contact via email>

 

12/11/2009 Action Items 12.9.09 (v: 1)   

ActionItemsfrom12-9-09CGPM.pdf   download>
Description: Action Items 12.9.09
Type: Minutes
Status: DRAFT
Contact: Marv Landauer, P.E.   contact via email>

 

12/11/2009 Cross Cascades ST Notes (12.10.09) (v: 1)   

...sCascadesSTnotes(12-10-09).pdf   download>
Description: Cross Cascades ST Notes (12.10.09)
Type: Notes
Status: DRAFT
Contact: Marv Landauer, P.E.   contact via email>

 

12/08/2009 TEPPC Study Update ColumbiaGrid (12.09.09) (v: 1)   

... Update ColumbiaGrid Dec 9.pdf   download>
Description: TEPPC Study Update ColumbiaGrid Dec 9
Type: Presentation
Status: FINAL

 

12/08/2009 Ten Year Plan Cutout from Biennial Plan Update (v: 1)   

TenYearPlan.pdf   download>
Description: Ten Year Plan Cutout from Biennial Plan Update
Type: Document (pdf)
Status: DRAFT
Contact: Marv Landauer, P.E.   contact via email>

 

12/07/2009 Cross Cascades Study Team Agenda (v: 1)   

AgendaWoCST(12.10.09).pdf   download>
Description: Cross Cascades Study Team Agenda
Type: Agenda
Status: DRAFT
Contact: Marv Landauer, P.E.   contact via email>

 

12/07/2009 Cross Cascades Agenda (v: 1)   

AgendaWoCST(12.10.09).pdf   download>
Description: Cross Cascades Agenda
Type: Agenda
Status: DRAFT
Contact: Marv Landauer, P.E.   contact via email>

 

11/25/2009 PSE Attachment K (v: 1)   

PSE-AttKmtg.pdf   download>
Description: PSE Attachment K
Type: Notice
Status: DRAFT

 

11/10/2009 2010 vs. 2009 vs. 2008 Winter NI Analysis (v: 1)   

request access >  login >
Description: 2010 vs. 2009 vs. 2008 Winter NI Analysis
Type: Spreadsheet
Status: DRAFT
Contact: Jonathan Young   contact via email>

 

11/09/2009 PSAST Agenda (11.12.09) (v: 1)   

PSASTAgenda(11.12.09).pdf   download>
Description: PSAST Agenda (11.12.09)
Type: Agenda
Status: DRAFT
Contact: Jonathan Young   contact via email>

 

10/29/2009 Action Items from CG Planning Mtg (10.27.09) (v: 1)   

ctionItemsfrom10-27-09CGPM.pdf   download>
Description: Action Items from CG Planning Mtg (10.27.09)
Type: Minutes
Status: DRAFT
Contact: Marv Landauer, P.E.   contact via email>

 

10/29/2009 Planning Mtg Agenda (v: 1)   

PlanningAgenda(12-9-09).pdf   download>
Description: Planning Mtg Agenda
Type: Agenda
Status: DRAFT
Contact: Marv Landauer, P.E.   contact via email>

 

10/29/2009 Gen Weight Factors HL Directional (v: 1)   

...ightFactors_HL_Directional.pdf   download>
Description: Gen Weight Factors HL Directional
Type: Spreadsheet
Status: DRAFT
Contact: Jonathan Young   contact via email>

 

10/27/2009 Miller - TCWG - WECC Wide Planning and the SCG (v: 1)   

...r-TCWG-WECCWidePlanningSCG.pdf   download>
Description: Miller - TCWG - WECC Wide Planning and the SCG
Type: Presentation
Status: DRAFT
Contact: Jeffrey C. Miller, P.E.   contact via email>

 

10/26/2009 Utility Project Summary (v: 1)   

UtilityProjectsummary.xls   download>
Description: Utility Project Summary
Type: Spreadsheet
Status: DRAFT
Contact: Marv Landauer, P.E.   contact via email>

 

10/26/2009 NTTG Economic Study 2009 (v: 1)   

NTTG-EconomicStudy-2009.pdf   download>
Description: NTTG Economic Study 2009
Type: Presentation
Status: DRAFT

 

10/26/2009 CG 2010 Transmission Plan Draft (v: 1)   

...d2010TransmissionPlanDraft.xls   download>
Description: CG 2010 Transmission Plan Draft
Type: Spreadsheet
Status: DRAFT
Contact: Marv Landauer, P.E.   contact via email>

 

10/21/2009 PSAST TCRM Report Draft (v: 1)   

confidentiality agreement required >
Description: PSAST TCRM Report Draft
Type: Report
Status: DRAFT
Contact: Jonathan Young   contact via email>

 

10/06/2009 PSAST Agenda (v: 1)   

PSAST_Oct22nd_Agenda (2).pdf   download>
Description: PSAST Agenda
Type: Agenda
Status: DRAFT
Contact: Jonathan Young   contact via email>

 

09/28/2009 ColumbiaGrid Presentation (PSE) (v: 1)   

...idPresentation(9.23.09)R01.pdf   download>
Description: ColumbiaGrid Presentation (PSE)
Type: Presentation
Status: DRAFT

 

09/25/2009 PSAST TCRM Report Draft2 (v: 1)   

request access >  login >
Description: PSAST_TCRM_Report_Draft2
Type: Report
Status: DRAFT
Contact: Jonathan Young   contact via email>

 

09/23/2009 Action Items from 9.22.09 Mtg (v: 1)   

ActionItemsfrom9-22-09CGPM.pdf   download>
Description: Action Items from 9.22.09 Mtg
Type: Minutes
Status: DRAFT
Contact: Marv Landauer, P.E.   contact via email>

 

09/23/2009 Draft Planning Agenda (v: 1)   

PlanningAgenda(10.27.09).pdf   download>
Description: Draft Planning Agenda
Type: Agenda
Status: DRAFT
Contact: Marv Landauer, P.E.   contact via email>

 

09/22/2009 SPG Coordination Group (v: 1)   

SCG-Report.pdf   download>
Description: SPG Coordination Group
Type: Presentation
Status: DRAFT
Contact: Jeffrey C. Miller, P.E.   contact via email>

 

09/21/2009 10 Year Comparison (v: 1)   

request access >  login >
Description: 10 Year Comparison
Type: Spreadsheet
Status: DRAFT
Contact: Gordon Comegys, P.E.   contact via email>

 

09/21/2009 Summer Wind Overload Comparison (v: 1)   

request access >  login >
Description: Summer Wind Overload Comparison
Type: Spreadsheet
Status: DRAFT
Contact: Gordon Comegys, P.E.   contact via email>

 

09/21/2009 Narrative of Wind Generation Sensitivity Study with New 10 Year Cases (v: 1)   

request access >  login >
Description: Narrative of Wind Generation Sensitivity Study with New 10 Year Cases
Type: Report
Status: DRAFT
Contact: Gordon Comegys, P.E.   contact via email>

 

09/21/2009 Narrative of 10 Year System Assessment Update Methodology (v: 1)   

request access >  login >
Description: Narrative of 10 Year System Assessment
Type: Report
Status: DRAFT
Contact: Gordon Comegys, P.E.   contact via email>

 

09/16/2009 Restack Cluster Study (v: 1)   

...ack_Cluster_Study_09-19-09.pdf   download>
Description: Restack Cluster Study
Type: Report
Status: DRAFT

 

09/16/2009 2009 NOS Update (v: 1)   

2009_NOS_Update_09-15-09.pdf   download>
Description: 2009 NOS Update
Type: Report
Status: DRAFT

 

09/16/2009 2008 NOS Summary Timeline Map (v: 1)   

...8_NOS_Summary_Timeline_Map.pdf   download>
Description: 2008 NOS Summary Timeline Map
Type: Report
Status: DRAFT

 

09/16/2009 NOS PTSA Update (v: 1)   

08_NOS_PTSA_Update.pdf   download>
Description: NOS PTSA Update
Type: Report
Status: DRAFT

 

09/15/2009 PSAST Agenda (09.23.09) (v: 1)   

PSAST_Sept23rd_Agenda.pdf   download>
Description: PSAST Agenda
Type: Agenda
Status: FINAL
Contact: Jonathan Young   contact via email>

 

08/18/2009 Action Items from 8.6.09 Mtg (v: 1)   

ActionItemsfrom8-6-09CGPM.pdf   download>
Description: Action Items from 8.6.09 Mtg
Type: Document (pdf)
Status: DRAFT
Contact: Marv Landauer, P.E.   contact via email>

 

08/11/2009 Planning Agenda (9.22.09) (v: 1)   

PlanningAgenda(9.22.09).pdf   download>
Description: Planning Agenda (9.22.09)
Type: Agenda
Status: DRAFT
Contact: Marv Landauer, P.E.   contact via email>

 

08/07/2009 Final Draft 10-year Cases & Contingency Definitions (zip file) (v: 1)   

request access >  login >
Description: Final Draft 10-year Cases & Contingency Definitions
Type: PowerWorld Auxiliary File
Status: DRAFT
Contact: Gordon Comegys, P.E.   contact via email>

 

08/06/2009 Pages from Transmission Conference Agenda (v: 1)   

...omTrans.ConfAgenda(8.6.09).pdf   download>
Description: Pages from Transmission Conference Agenda
Type: Report
Status: DRAFT

 

08/06/2009 Cost Comp (v: 1)   

CostComp(8.7.09).pdf   download>
Description: Cost Comp
Type: Spreadsheet
Status: DRAFT
Contact: Marv Landauer, P.E.   contact via email>

 

08/06/2009 Trojan-Horizon Presentation (v: 1)   

...orizonPresentation(8-6-09).pdf   download>
Description: Trojan-Horizon Presentation
Type: Presentation
Status: DRAFT

 

08/05/2009 NOS Update (v: 1)   

...anningMtgNOSUpdate(8.6.09).pdf   download>
Description: NOS Update
Type: Presentation
Status: DRAFT

 

08/05/2009 System Assessment Presentation (v: 1)   

...ssmentPresentation(8.6.09).pdf   download>
Description: System Assessment Presentation
Type: Presentation
Status: DRAFT
Contact: Marv Landauer, P.E.   contact via email>

 

08/05/2009 Canada - Pacific NW - N. California Transmission Project (v: 1)   

CNC-BEM(8.06.2009).pdf   download>
Description: Canada - Pacific NW - N. California Transmission Project
Type: Presentation
Status: DRAFT

 

08/03/2009 Planning Meeting Draft Agenda (v: 1)   

PlanningAgenda(8.6.09).pdf   download>
Description: Planning Meeting Draft Agenda
Type: Agenda
Status: DRAFT
Contact: Marv Landauer, P.E.   contact via email>

 

07/15/2009 NMCST Agenda (8.7.09) (v: 1)   

NMCSTAgenda(8.7.09).pdf   download>
Description: N. Mid C Agenda
Type: Agenda
Status: DRAFT
Contact: Marv Landauer, P.E.   contact via email>

 

07/15/2009 Action Items from 6.09 Mtg (v: 1)   

ActionItems(6-10-09)CGPM.pdf   download>
Description: Action Items from 6.09 Mtg
Type: Minutes
Status: DRAFT
Contact: Marv Landauer, P.E.   contact via email>

 

06/26/2009 2009 System Assessment Contingency Analysis Overload List (v: 1)   

request access >  login >
Description: 2009 System Assessment Contingency Analysis Overload List
Type: Spreadsheet
Status: DRAFT
Contact: Gordon Comegys, P.E.   contact via email>

 

06/26/2009 SupportingDataFor2009SystemAssessmentContingencyAnalysisOverloadList (v: 1)   

request access >  login >
Description: SupportingDataFor2009SystemAssessmentContingencyAnalysisOverloadList.zip
Type: Base Case
Status: DRAFT
Contact: Gordon Comegys, P.E.   contact via email>

 

06/15/2009 Summer '09 Nomogram Analysis for PSAST (v: 1: this is a .zipped file)   

request access >  login >
Description: Summer '09 Nomogram Analysis for PSAST
Type: Spreadsheet
Status: DRAFT
Contact: Jonathan Young   contact via email>

 

06/11/2009 Planning Assumptions (June 10, 2009) (v: 1)   

...ssumptions for 10Jun09 Mtg.doc   download>
Description: Planning Assumptions (June 10, 2009)
Type: Document (pdf)
Status: DRAFT
Contact: Gordon Comegys, P.E.   contact via email>

 

06/10/2009 Overload Comparison Table (v: 2)   

request access >  login >
Description: Overload Comparison Table
Type: Spreadsheet
Status: DRAFT
Contact: Marv Landauer, P.E.   contact via email>

 

06/10/2009 Basecase/Wind Diagrams (v: 1)   

basecasediagrams.pdf   download>
Description: Basecase/Wind Diagrams
Type: Presentation
Status: DRAFT
Contact: Tammy Beckwith   contact via email>

 

06/09/2009 Weighted TCRM Generation Heavy Loading (v: 1)   

WgtdTCRM _ GenHvyLoading.pdf   download>
Description: Weighted TCRM Generation Heavy Loading
Type: Spreadsheet
Status: DRAFT
Contact: Jonathan Young   contact via email>

 

06/08/2009 Draft Planning Agenda (6-10-09) (v: 2)   

DraftAgenda(6-10-09)1.pdf   download>
Description: Draft Planning Agenda (6-10-09)
Type:
Status: FINAL
Contact: Marv Landauer, P.E.   contact via email>

 

06/08/2009 Col Grid 2009 Transmission Plan Draft (2) (v: 2)   

...09TransmissionPlanDraft(2).xls   download>
Description: Col Grid 2009 Transmission Plan Draft (2)
Type: Spreadsheet
Status: DRAFT
Contact: Marv Landauer, P.E.   contact via email>

 

06/08/2009 2009 System Assessment 6-8-09 draft (v: 1)   

...ystemAssessment6-8-09draft.doc   download>
Description: 2009 System Assessment 6-8-09 draft
Type: Report
Status: DRAFT
Contact: Marv Landauer, P.E.   contact via email>

 

06/08/2009 PSAST Agenda (v: 1)   

PSASTAgenda(06.16.09).pdf   download>
Description: PSAST Agenda (06.16.09)
Type: Agenda
Status: DRAFT
Contact: Jonathan Young   contact via email>

 

06/05/2009 Cost Comparison (v: 1)   

CostComp.pdf   download>
Description: Cost Comparison for N. Mid C
Type: Spreadsheet
Status: DRAFT
Contact: Marv Landauer, P.E.   contact via email>

 

06/05/2009 NMC Agenda (v: 1)   

Agenda(5.28.09).pdf   download>
Description: NMC Agenda
Type: Agenda
Status: DRAFT
Contact: Marv Landauer, P.E.   contact via email>

 

05/13/2009 April 2009 PSANI Events & OCTAG Study Plan Update (v: 1)   

request access >  login >
Description: April 2009 PSANI Events & OCTAG Study Plan Update
Type: Report
Status: FINAL
Contact: Jonathan Young   contact via email>

 

05/13/2009 Contingency Analysis Summary (5.11.09) (v: 2)   

request access >  login >
Description: Contingency Analysis Summary
Type: Spreadsheet
Status: DRAFT
Contact: Gordon Comegys, P.E.   contact via email>

 

05/11/2009 Action Items From 5.07.09 Meeting (v: 1)   

ActionItemsfrom5-7-09CGPM.pdf   download>
Description: Action Items From 5.07.09 Meeting
Type: Report
Status: FINAL
Contact: Marv Landauer, P.E.   contact via email>

 

05/07/2009 Contingency Aux Files - Optional Download (v: 2: Aux files to modify WECC cases and contingency definitions)   

request access >  login >
Description: Contingency Aux Files
Type: PowerWorld Auxiliary File
Status: DRAFT
Contact: Gordon Comegys, P.E.   contact via email>

 

05/07/2009 2006 Wind Correlation Profiles (v: 1)   

2006WindProfiles.pdf   download>
Description: 2006 Wind Correlation
Type: Spreadsheet
Status: DRAFT
Contact: Marv Landauer, P.E.   contact via email>

 

05/07/2009 Results Template (v: 1)   

ResultsTemplate.pdf   download>
Description: Results Template
Type: Spreadsheet
Status: DRAFT
Contact: Marv Landauer, P.E.   contact via email>

 

05/07/2009 NTTG Study Matrix (v: 1)   

TTGStudyMatrix(2009-05-07).pdf   download>
Description: NTTG Study Matrix
Type: Document (pdf)
Status: DRAFT

 

05/07/2009 Requested Service Projects (v: 1)   

...tedServiceProjects(5-7-09).pdf   download>
Description: Requested Service Projects
Type: Presentation
Status: DRAFT
Contact: Jeffrey C. Miller, P.E.   contact via email>

 

05/07/2009 DHM to WECC Board (04.29.09) fin (2) (v: 1)   

...-WECCBoard(04.29.09)fin(2).pdf   download>
Description: DHM to WECC Board (04.29.09) fin (2)
Type:
Status: DRAFT

 

05/07/2009 Excerpts from the NWPCC Load Forecast (v: 1)   

...ptsNWPCCLoadForecast(5-09).pdf   download>
Description: Excerpts from the NWPCC Load Forecast
Type: Presentation
Status: DRAFT

 

05/06/2009 I5 CG Update (v: 1)   

I5_CG_Update_5_09.pdf   download>
Description: I5 CG Update
Type: Presentation
Status: DRAFT

 

05/04/2009 N. Mid C Agenda (v: 1)   

NMCSTAgenda(5.6.09).pdf   download>
Description: N. Mid C Agenda
Type: Agenda
Status: DRAFT
Contact: Marv Landauer, P.E.   contact via email>

 

04/28/2009 Grant's Kilroy Bldg (v: 1)   

rant'sKilroyBldgDirections.pdf   download>
Description: Grant's Kilroy Building location and directions
Type: Document (pdf)
Status: FINAL
Contact: Jonathan Young   contact via email>

 

04/28/2009 PSAST Agenda (5.05.09) (v: 1)   

PSASTMay5thAgenda.pdf   download>
Description: PSAST May5th Agenda
Type: Agenda
Status: FINAL
Contact: Jonathan Young   contact via email>

 

04/08/2009 Action Items from Planning Mtg 3.30.09 (v: 1)   

  risk of use agreement required >>
Description: Action Items from Planning Mtg 3.30.09
Type: Document (pdf)
Status: DRAFT
Contact: Marv Landauer, P.E.   contact via email>

 

04/07/2009 Northern Mid-C Study Team Report (4.10.09) (v: 1)   

...rn Mid-C Study Team Report.pdf   download>
Description: Northern Mid-C Study Team Report
Type: Report
Status: DRAFT
Contact: Marv Landauer, P.E.   contact via email>

 

04/07/2009 Wenatchee Area Map - Proposed (v: 1)   

  risk of use agreement required >>
Description: Wenatchee Area Map - Proposed
Type: Map
Status: DRAFT
Contact: Marv Landauer, P.E.   contact via email>

 

04/07/2009 NMC Plan Summary (v: 1)   

  risk of use agreement required >>
Description: NMC Plan Summary
Type: Spreadsheet
Status: DRAFT
Contact: Marv Landauer, P.E.   contact via email>

 

04/07/2009 Planning Meeting Agenda (Draft) (v: 1)   

PlanningAgenda(5.7.09).pdf   download>
Description: Planning Meeting Agenda (Draft)
Type: Agenda
Status: DRAFT
Contact: Marv Landauer, P.E.   contact via email>

 

03/30/2009 TEPPC Regional Planning White Paper (v: 1)   

...regionalplanningwhitepaper.pdf   download>
Description: TEPPC regional planning white paper
Type: Report
Status: DRAFT

 

03/24/2009 Old Version 13: PowerWorldBaseCasesCGmodified13HS1-14HW1-OldVersion13.zip (v: 1; (in Old Version 13) Supporting data for contingency analysis results.)   

request access >  login >
Description: PowerWorldBaseCasesCGmodified13HS1-14HW1-OldVersion13.zip
Type: PowerWorld Auxiliary File
Status: DRAFT
Contact: Gordon Comegys, P.E.   contact via email>

 

03/24/2009 13HS1CG-ContingencyResults.xls (v: 1; Contingency analysis results for 2013 Summer)   

request access >  login >
Description: 13HS1CG-ContingencyResults.xls
Type: Spreadsheet
Status: DRAFT
Contact: Gordon Comegys, P.E.   contact via email>

 

03/24/2009 14HW1CG-ContingencyResults.xls (v: 1; Contingency analysis results for 2013-2014 Winter)   

request access >  login >
Description: 14HW1CG-ContingencyResults.xls
Type: Spreadsheet
Status: DRAFT
Contact: Gordon Comegys, P.E.   contact via email>

 

03/23/2009 Action Items from 2.25.09 Mtg (v: 1)   

ActionItemsfrom2-25-09CGPM.pdf   download>
Description: Action Items from 2.25.09 Mtg
Type: Notes
Status: DRAFT
Contact: Marv Landauer, P.E.   contact via email>

 

03/23/2009 Draft Planning Agenda (3.31.09) (v: 1)   

PlanningAgenda(3-31-09).pdf   download>
Description: Draft Planning Agenda (3.31.09)
Type: Agenda
Status: DRAFT
Contact: Marv Landauer, P.E.   contact via email>

 

03/16/2009 14HW1-13HS1-CG-AllChangesContingencyResults16mar09.zip (v: Modified WECC 14HW1 and 13HS1 cases with contingency results, updated 3.16.09)   

request access >  login >
Description: Modified WECC 14HW1 and 13HS1 cases with preliminary contingency results and supporting case development data. These were discussed during the March 3, 2009 WebEx conference
Type: Base Case
Status: DRAFT
Contact: Gordon Comegys, P.E.   contact via email>

 

03/11/2009 Approved - 2009 Biennial Transmission Expansion Plan (v: 2)   

transmissionplan2.pdf   download>
Description: Approved 2009 Biennial Transmission Expansion Plan
Type: Report
Status: FINAL
Contact: Jeffrey C. Miller, P.E.   contact via email>

 

02/26/2009 14HW1CG & 13HS1CG Contingency Analysis Meeting (v: 1)   

14HW1CG.doc   download>
Description: 14HW1CG & 13HS1CG Contingency Analysis Meeting
Type: Agenda
Status: DRAFT
Contact: Gordon Comegys, P.E.   contact via email>

 

02/26/2009 14hw1CG-13HS1CG-Contingency Results 2.25.09 (v: 1)   

request access >  login >
Description: 14hw1CG-13HS1CG-Contingency Results 2.25.09
Type: PowerWorld Auxiliary File
Status: DRAFT
Contact: Gordon Comegys, P.E.   contact via email>

 

02/26/2009 Case Development Supporting Data (v: 1)   

request access >  login >
Description: Case Development Supporting Data
Type: PowerWorld Auxiliary File
Status: DRAFT
Contact: Gordon Comegys, P.E.   contact via email>

 

02/25/2009 2009 Study Plan Agenda Item 7 (2.25.09) (v: 1)   

2009 Study Plan.pdf   download>
Description: 2009 Study Plan for agenda item 7
Type: Report
Status: DRAFT
Contact: Marv Landauer, P.E.   contact via email>

 

02/25/2009 NERC Planning Authority Agenda Igem 12 (2.25.09) (v: 1)   

...abbed Applicability Matrix.pdf   download>
Description: NERC Planning Authority for agenda item 12
Type: Spreadsheet
Status: FINAL
Contact: Marv Landauer, P.E.   contact via email>

 

02/24/2009 Draft Planning Agenda (2-25-09) (v: 1)   

...Planning Agenda (2-25-09)1.pdf   download>
Description: Draft Planning Agenda (2-25-09)
Type: Agenda
Status: FINAL
Contact: Marv Landauer, P.E.   contact via email>

 

02/23/2009 Agenda Item 13d - EAC Report on Keeping the Lights On (v: 1)   

EACReport-KeepingLightson.pdf   download>
Description: Agenda Item 13d - EAC Report on Keeping the Lights On
Type: Report
Status: DRAFT

 

02/23/2009 Agenda Item 13b - Draft comments from WECC Seminar on Long Term Planning (v: 1)   

...tsWECCSeminar-LongTermPlan.doc   download>
Description: Agenda Item 13b - Draft comments from WECC Seminar on Long Term Planning
Type: Comments
Status: DRAFT

 

02/23/2009 Agenda Item 13a - WREZ Transmission Segment Map (v: 1)   

WREZTransSegmentMap.ppt   download>
Description: Agenda Item 13a - WREZ Transmission Segment Map
Type: Presentation
Status: DRAFT

 

02/23/2009 Agenda Item 13a - WREZ Transmission Assumptions (v: 1)   

WREZTransAssumptions.ppt   download>
Description: Agenda Item 13a - WREZ Transmission Assumptions
Type: Presentation
Status: DRAFT

 

02/23/2009 Agenda Item 13c - Green Power Superhighways Report (v: 1)   

GreenPowerSuperhwysRept.pdf   download>
Description: Agenda Item 13c - Green Power Superhighways Report
Type: Report
Status: DRAFT

 

02/10/2009 PSAST Feb 19th Agenda (2.19.09) (v: 1)   

PSAST Feb19th Agenda.pdf   download>
Description: PSAST Feb1 9th Agenda
Type:
Status: FINAL

 

01/30/2009 ContingencyAnalysisAuxFiles (v: 1)   

request access >  login >
Description: ContingencyAnalysisAuxFiles
Type: Base Case
Status: DRAFT
Contact: Gordon Comegys, P.E.   contact via email>

 

01/30/2009 14hw1a-Contingency Results-case-without-corrections (v: 1)   

request access >  login >
Description: 14hw1a-Contingency Results-case-without-corrections
Type: Base Case
Status: DRAFT
Contact: Gordon Comegys, P.E.   contact via email>

 

01/29/2009 Study Request to TEPPC 2009 (v: 1)   

tudy Request to TEPPC 2009.pdf   download>
Description: Study Request to TEPPC 2009
Type: Letter
Status: DRAFT
Contact: Marv Landauer, P.E.   contact via email>

 

01/28/2009 2008 NOS Reg Eco Benefit_CG Briefing (v: 1)   

...eg Eco Benefit_CG Briefing.pdf   download>
Description: 2008 NOS Reg Eco Benefit_CG Briefing
Type: Presentation
Status: FINAL

 

01/28/2009 2008 NOS Recommendation_CG Briefing v1 (v: 1)   

...ommendation_CG Briefing v1.pdf   download>
Description: 2008 NOS Recommendation_CG Briefing v1
Type: Presentation
Status: FINAL

 

01/28/2009 Base Case Quality Assurance (v: 1)   

BaseCaseQualityAssurance.pdf   download>
Description: Base Case Quality Assurance
Type: Presentation
Status: DRAFT
Contact: Gordon Comegys, P.E.   contact via email>

 

01/14/2009 PSAST Agenda (1.27.09) (v: 1)   

PSAST Agenda (1.27.09).pdf   download>
Description: PSAST Agenda (1.27.09)
Type: Agenda
Status: FINAL
Contact: Jonathan Young   contact via email>

 

12/29/2008 Load Growth Est. By Owner (v: 1)   

confidentiality agreement required >
Description: Load Growth Est. By Owner
Type: Spreadsheet
Status: FINAL
Contact: Gordon Comegys, P.E.   contact via email>

 

12/29/2008 Load Growth Est. By Zone (v: 1)   

confidentiality agreement required >
Description: Load Growth Estimates By Zone
Type: Base Case
Status: FINAL
Contact: Gordon Comegys, P.E.   contact via email>

 

12/17/2008 ColumbiaGrid NOS Cluster Study Summary (12.16.08)v.5 (v: 1)   

...SClusterStudySum(12-16-08).pdf   download>
Description: ColumbiaGrid NOS Cluster Study Summary (12.16.08)v.5
Type: Presentation
Status: DRAFT

 

12/15/2008 Draft Planning Agenda (12-16-08) (v: 1)   

...Planning Agenda (12-16-08).pdf   download>
Description: Draft Planning Agenda (12-16-08)
Type: Agenda
Status: FINAL
Contact: Marv Landauer, P.E.   contact via email>

 

12/15/2008 2009-2019 Transmission Expansion Plan Draft Presentation (v: 1)   

TxExpPlan(12.16.08).pdf   download>
Description: 2009-2019 Transmission Expansion Plan Draft Presentation
Type: Presentation
Status: DRAFT
Contact: Jeffrey C. Miller, P.E.   contact via email>

 

12/15/2008 PEFA Primer (v: 1)   

PEFA PrimerRev2.pdf   download>
Description: PEFA Primer
Type: Presentation
Status: DRAFT
Contact: Jeffrey C. Miller, P.E.   contact via email>

 

12/12/2008 2009 System Assessment Preparation Supporting Data (v: 1)   

request access >  login >
Description: 16dec08, 2009 System Assessment Preparation Supporting Data
Type: Base Case
Status: FINAL
Contact: Gordon Comegys, P.E.   contact via email>

 

12/12/2008 2009 CG System Assessment (v: 1)   

...9 CG System Assessment (2).pdf   download>
Description: 2009 CG System Assessment Presentation
Type: Presentation
Status: FINAL
Contact: Gordon Comegys, P.E.   contact via email>

 

12/08/2008 TAG_V0_final (12.09.08) (v: 1)   

TAG_V0_final.pdf   download>
Description: TAG_V0_final
Type: Report
Status: FINAL
Contact: Jeffrey C. Miller, P.E.   contact via email>

 

12/03/2008 WECC Letter 11.14.08 (v: 1)   

WECC ltr 11.14.08.pdf   download>
Description: WECC Letter dated 11.14.08 regarding TEPPC study requests window open Dec 12 to Jan. 31
Type: Letter
Status: FINAL

 

12/03/2008 Study Request to TEPPC 2008 (v: 1)   

tudy Request to TEPPC 2008.pdf   download>
Description: Study Request to TEPPC 2008
Type: Letter
Status: FINAL
Contact: Marv Landauer, P.E.   contact via email>

 

12/03/2008 2009-2019 Draft Transmission Expansion Plan (v: 1)   

transmissionplan(12.3.08).pdf   download>
Description: 2009-2019 Draft Transmission Expansion Plan
Type: Report
Status: DRAFT
Contact: Jeffrey C. Miller, P.E.   contact via email>

 

12/02/2008 PSE Attachment K Meeting Notice & Agenda (11.09.08) (v: 1)   

...Att K_PSAST Mtg Ntc&Agenda.pdf   download>
Description: PSE Attachment K Meeting Notice & Agenda (11.09.08)
Type: Agenda
Status: FINAL

 

12/01/2008 PSAST Draft Agenda (12.09.08) (v: 1)   

...T Draft Agenda (12.09.08).pdf   download>
Description: PSAST Draft Agenda (12.09.08)
Type: Agenda
Status: DRAFT
Contact: Jonathan Young   contact via email>

 

11/18/2008 CG Planning Meeting Presentation (v: 1)   

Planningmtg(11.18.08).pdf   download>
Description: CG Planning Meeting Presentation
Type: Presentation
Status: DRAFT
Contact: Marv Landauer, P.E.   contact via email>

 

11/17/2008 Biennial Plan Group Agenda (11.18.08) (v: 1)   

Agenda (11-18-08.pdf).pdf   download>
Description: Biennial Plan Group Agenda (11.18.08)
Type: Agenda
Status: FINAL
Contact: Marv Landauer, P.E.   contact via email>

 

11/14/2008 No. Mid-C Agenda (11-19-08) (v: 1)   

NMCST Agenda 11-19-08.doc   download>
Description: Agenda for November 19th North Mid Columbia study team meeting
Type: Agenda
Status: DRAFT
Contact: Amy Johnson   contact via email>

 

11/14/2008 Winter 2009 Nomo Analysis (Powerex) (v: 1)   

request access >  login >
Description: Winter 2009 Nomo Analysis (Powerex)
Type: Document (pdf)
Status: FINAL

 

10/31/2008 Preliminary Draft 2008-2018 Transmission Expansion Plan (v: 1)   

prelimDRAFTtx_exp_Plan.doc   download>
Description: Preliminary Draft 2008-2018 Transmission Expansion Plan
Type: Report
Status: DRAFT
Contact: Marv Landauer, P.E.   contact via email>

 

10/31/2008 ColGrid 2008 Transmission Plan (10.30.08) (v: 1)   

...ransmissionPlan(10.30.08)1.xls   download>
Description: ColGrid 2008 Transmission Plan (10.30.08)
Type: Spreadsheet
Status: DRAFT
Contact: Marv Landauer, P.E.   contact via email>

 

10/31/2008 2008 Biennial Plan Attachments (v: 1)   

attachments1.pdf   download>
Description: Biennial Plan Attachments
Type: Document (pdf)
Status: DRAFT
Contact: Marv Landauer, P.E.   contact via email>

 

10/20/2008 Draft Agenda (10.22.08) (v: 1)   

draftAgenda(10.22.08)2.pdf   download>
Description: Draft Agenda (10.22.08)
Type: Agenda
Status: FINAL
Contact: Jeffrey C. Miller, P.E.   contact via email>

 

10/10/2008 NOS Update from BPA (v: 1)   

NOSUpdate(10.09.08).pdf   download>
Description: NOS Update from BPA
Type: Presentation
Status: DRAFT

 

10/08/2008 Regional Economic Analysis CG Final (v: 1)   

Reg.Eco.Ana._CG.pdf   download>
Description: Regional Economic Analysis CG Final
Type: Presentation
Status: DRAFT

 

10/07/2008 Biennial Plan Process & Schedule (v: 1)   

Bien.Pro.Sched.(10.9.08).pdf   download>
Description: Biennial Plan Process & Schedule
Type: Presentation
Status: DRAFT
Contact: Jeffrey C. Miller, P.E.   contact via email>

 

10/07/2008 Regional Coordination Activities (v: 1)   

Reg.Coor.Act.(10.9.08).pdf   download>
Description: Regional Coordination Activities
Type: Presentation
Status: DRAFT
Contact: Jeffrey C. Miller, P.E.   contact via email>

 

10/07/2008 Draft Agenda (10.9.08) (v: 2)   

DraftAgenda(10.9.08)2.pdf   download>
Description: Draft Agenda(10.9.08)
Type: Agenda
Status: FINAL
Contact: Jeffrey C. Miller, P.E.   contact via email>

 

09/23/2008 PSAST Agenda (09.25.08) (v: 1)   

PSAST.Agenda(09.25.08)1.pdf   download>
Description: PSAST Agenda
Type: Agenda
Status: DRAFT
Contact: Jeffrey C. Miller, P.E.   contact via email>

 

09/18/2008 No. Mid-C Agenda (9-22-08) (v: 1)   

Agenda (9-22-08).pdf   download>
Description: Agenda (9-22-08)
Type: Agenda
Status: FINAL
Contact: Marv Landauer, P.E.   contact via email>

 

09/15/2008 CG 2008 Transmission Plan Combined Changes (v: 1)   

...ion Plan(8 29 08)_combined.pdf   download>
Description: CG 2008 Transmission Plan with combined comments
Type: Spreadsheet
Status: DRAFT
Contact: Marv Landauer, P.E.   contact via email>

 

09/15/2008 NTTG MT-MidC Line at CG Draft (v: 1)   

NTTGMT-MidC(9.16.08).pdf   download>
Description: NTTG MT-MidC Line at CG Draft
Type: Presentation
Status: DRAFT

 

09/15/2008 Biennial Planning Mtg Agenda 9-16-08 (v: 1)   

Agenda(9.16.08).pdf   download>
Description: Agenda
Type: Agenda
Status: DRAFT
Contact: Marv Landauer, P.E.   contact via email>

 

09/12/2008 Attachment B - Resources used in Base Cases (v: 1)   

...ources-basecases(9.12.08)2.doc   download>
Description: Attachment B - Resources used in Base Cases
Type: Report
Status: DRAFT
Contact: Marv Landauer, P.E.   contact via email>

 

09/12/2008 Summary of Sensitivity Studies - Draft (v: 1)   

mSensitivityStudy(9.12.08).pdf   download>
Description: Summary of Sensitivity Studies - Draft
Type: Report
Status: DRAFT
Contact: Marv Landauer, P.E.   contact via email>

 

08/14/2008 NOS Update (v: 1)   

...ing NOS Update 8-14-08 (2).pdf   download>
Description: NOS Update
Type: Presentation
Status: FINAL

 

08/14/2008 NMC Map (v: 1)   

NMC Map (2).pdf   download>
Description: NMC Map
Type: Map
Status: FINAL
Contact: Marv Landauer, P.E.   contact via email>

 

08/12/2008 MT to ColGrid Study Request Coordination (08.14.08) (v: 1)   

...Coordination SAW edits (2).pdf   download>
Description: MT to ColGrid Study Request Coordination
Type: Spreadsheet
Status: FINAL

 

08/08/2008 Action Items 25 June 2008 (v: 1)   

tion Items from 25June2008.pdf   download>
Description: Action Items from 25 June 2008
Type:
Status: FINAL
Contact: Marv Landauer, P.E.   contact via email>

 

08/08/2008 Mid-C Study Plan (v: 1)   

Mid-C_Study Plan1.pdf   download>
Description: Mid-C-Study Plan
Type:
Status: FINAL
Contact: Marv Landauer, P.E.   contact via email>

 

08/08/2008 Agenda (08.15.08) (v: 1)   

NMCST Agenda 8-15-08.pdf   download>
Description: Agenda for August 15, 2008 meeting
Type: Agenda
Status: FINAL
Contact: Marv Landauer, P.E.   contact via email>

 

08/07/2008 2008 Transmission Plan Template (v: 1)   

...ission Plan template (v.1).pdf   download>
Description: 2008 Transmission Plan Template
Type: Spreadsheet
Status: DRAFT
Contact: Marv Landauer, P.E.   contact via email>

 

08/07/2008 Single System Projects (v: 1)   

SingleSystemProjects.pdf   download>
Description: Single System Projects
Type: Document (pdf)
Status: DRAFT
Contact: Marv Landauer, P.E.   contact via email>

 

08/07/2008 Biennial Plan Agenda (v: 1)   

agenda(8.14.08).pdf   download>
Description: Biennial Plan Agenda
Type: Agenda
Status: DRAFT
Contact: Marv Landauer, P.E.   contact via email>

 

08/04/2008 ColumbiaGrid Contingency Naming Standard (v: 1)   

CGNamingStandard.pdf   download>
Description: ColumbiaGrid Contingency Naming Standard
Type: Document (pdf)
Status: DRAFT
Contact: Gordon Comegys, P.E.   contact via email>

 

07/02/2008 Biennial Planning Agenda 7.10.08 (v: 1)   

... Plan Group Agenda 7.10.08.pdf   download>
Description: Biennial Planning Agenda 7.10.08
Type: Agenda
Status: DRAFT
Contact: Marv Landauer, P.E.   contact via email>

 

06/24/2008 Agenda (6-25-08) (v: 2)   

NMCST Agenda 6-25-08f.pdf   download>
Description: Agenda for Northern Mid-C June 25, 2008 Meeting
Type: Agenda
Status: FINAL
Contact: Marv Landauer, P.E.   contact via email>

 

05/21/2008 IP Impact (5.21.08) (v: 1)   

IP_Impact.pdf   download>
Type: Spreadsheet
Status: FINAL
Contact: Marv Landauer, P.E.   contact via email>

 

05/21/2008 Northern Mid-C Mtg Agenda (v: 1)   

Agenda052108.pdf   download>
Description: Agenda
Type: Agenda
Status: FINAL
Contact: Marv Landauer, P.E.   contact via email>

 

05/21/2008 Mid-C Study Plan (v: 1)   

Mid-C_Study Plan.pdf   download>
Description: Mid-C Study Plan
Type: Document (pdf)
Status: DRAFT
Contact: Marv Landauer, P.E.   contact via email>

 

05/21/2008 Action Items from April 2008 Mtg (v: 1)   

ActionItems22April2008.pdf   download>
Description: Action Items fron April 22, 2008 Meeting
Type: Document (pdf)
Status: DRAFT
Contact: Marv Landauer, P.E.   contact via email>

 

05/20/2008 N I Summer 2008 Operating Nomograms (FINAL) (v: final)   

... Operating Nomograms_FINAL.pdf   download>
Description: Northern Intertie Summer 2008 Operating Nomograms (FINAL)
Type:
Status: FINAL

 

05/20/2008 DCPUD_T-Line Overview (v: 1)   

DCPUD_T-Line Overview.pdf   download>
Description: DCPUD_T-Line Overview
Type: Document (pdf)
Status: DRAFT
Contact: Marv Landauer, P.E.   contact via email>

 

05/20/2008 TCRM Data Structure (v: 1)   

TCRM Data Structure.xls   download>
Description: TCRM Data Structure
Type: Spreadsheet
Status: DRAFT
Contact: Marv Landauer, P.E.   contact via email>

 

05/20/2008 Nomogram Simulation Scripting Draft Scope Rev (v: 1)   

...g Draft Scope Rev May 2008.doc   download>
Description: Nomogram Simulation Scripting Draft Scope Rev
Type: Report
Status: DRAFT
Contact: Marv Landauer, P.E.   contact via email>

 

05/20/2008 PSAST TCRM Script (v: 1)   

PSAST TCRM Script.ppt   download>
Description: PSAST TCRM Script
Type: Presentation
Status: DRAFT
Contact: Marv Landauer, P.E.   contact via email>

 

05/19/2008 PSAST Agenda 5-20-08 Rev (v: 1)   

Agenda 5-20-08r1.pdf   download>
Description: PSAST Agenda
Type: Agenda
Status: FINAL
Contact: Jeffrey C. Miller, P.E.   contact via email>

 

05/19/2008 NI Nomogram Analysis (v: 1)   

NI Nomogram Analysis.pdf   download>
Description: NI Nomogram Analysis
Type: Spreadsheet
Status: FINAL

 

05/19/2008 TCRM Nomograms Comparison (v: 1)   

TCRM Nomograms Summary.pdf   download>
Description: TCRM Nomograms Comparison for 2003-2008
Type: Presentation
Status: FINAL

 

05/19/2008 Rating Study Plan (v: 1)   

Rating Study Plan 09may08.pdf   download>
Description: NW - BC (Path3) Phase 1 Path Rating Study Plan presented to PSAST Ma6 20, 2008 meeting
Type: Presentation
Status: FINAL

 

05/15/2008 Draft PSAST TCRA Study Plan V6 (v: draft)   

...t PSAST TCRA Study Plan V6.pdf   download>
Description: Draft PSAST TCRA Study Plan version 6
Type: Document (pdf)
Status: DRAFT
Contact: Jeffrey C. Miller, P.E.   contact via email>

 

05/14/2008 BCTC System Operating Order 7T -64 (v: 1)   

SOO7T-64_12jul07.pdf   download>
Description: BCTC System Operating Order 7T -64 12jul07
Type: Spreadsheet
Status: FINAL
Contact: Jeffrey C. Miller, P.E.   contact via email>

 

05/14/2008 Summer 07 Nomograms for NI-Heavy Load (v: 1)   

...(100) All Lines In Service.pdf   download>
Description: Summer Nomograms for NI for Ingledow-Custer, heavy load
Type: Spreadsheet
Status: FINAL
Contact: Jeffrey C. Miller, P.E.   contact via email>

 

05/14/2008 Winter 08 Nomograms for NI Light Load (v: 1)   

...of 436Winter08_SNL_results.pdf   download>
Description: Winter Nomograms for NI Ingledow-Custer, Light Load
Type: Spreadsheet
Status: FINAL
Contact: Jeffrey C. Miller, P.E.   contact via email>

 

05/14/2008 Summer 07 Nomograms for NI-Light Load (v: 1)   

...(100) All Lines In Service.pdf   download>
Description: Summer 07 Nomograms for NI-Ingledow-Custer, Light Load
Type: Spreadsheet
Status: FINAL
Contact: Jeffrey C. Miller, P.E.   contact via email>

 

05/13/2008 Winter 08 Nomograms for NI-Heavy Load (v: 1)   

...of 436Winter08_SNH_results.PDF   download>
Description: Winter 08 Nomograms for NI-Ingledow-Custer, Heavy Load
Type: Spreadsheet
Status: FINAL
Contact: Jeffrey C. Miller, P.E.   contact via email>

 

05/09/2008 Path 3 Phase 1 Study Plan 23apr08 (2) (v: draft)   

...e 1 study plan 23apr08 (2).pdf   download>
Description: Path 3 Phase 1 Study Plan 23apr08 (2)
Type: Document (pdf)
Status: DRAFT
Contact: Jeffrey C. Miller, P.E.   contact via email>

 

05/02/2008 System Assessment Report Needs Statement 2008 (5.02.08) (v: 2)   

request access >  login >
Description: System Assessment Report Needs Statement 2008 - Attachment H
Type: Document (pdf)
Status: DRAFT
Contact: Marv Landauer, P.E.   contact via email>

 

04/29/2008 NOS Future Needs (04.30.08) (v: 1)   

OS FutureNeeds(04.30.2008).pdf   download>
Description: NOS Future Needs(04.30.08) - BPA report
Type: Report
Status: FINAL
Contact: Marv Landauer, P.E.   contact via email>

 

04/29/2008 BPA WOCS Status (4.30.08) (v: 1)   

BPA WOCS STATUS (4.30.08).pdf   download>
Description: BPA West Of Cascades South Status Report
Type: Report
Status: FINAL
Contact: Marv Landauer, P.E.   contact via email>

 

04/28/2008 Study Plans for Sensitivity Studies (v: 1)   

SensitivityStudyPlans.pdf   download>
Description: Study Plans for Sensitivity Studies
Type: Document (pdf)
Status: DRAFT
Contact: Marv Landauer, P.E.   contact via email>

 

04/28/2008 Draft Agenda (v: 1)   

Draft Agenda.pdf   download>
Description: Draft Agenda for April 30, 2008 Meeting
Type: Agenda
Status: DRAFT
Contact: Marv Landauer, P.E.   contact via email>

 

04/24/2008 500 kV System PowerWorld OneLine (v: 2)   

request access >  login >
Description: PowerWorld version 13 oneline diagram (.pwd). This diagram was developed by BPA, and minor adjustments were made for compatibility with the ColumbiaGrid planning cases.
Type: Map
Status: DRAFT
Contact: Amy Johnson   contact via email>

 

04/21/2008 Draft Agenda 4-22-08 (v: 2)   

NMCST Agenda 4-22-08.pdf   download>
Description: Draft Agenda for Initial Northern Mid-Columbia Transmission Meeting
Type: Agenda
Status: DRAFT
Contact: Marv Landauer, P.E.   contact via email>

 

04/17/2008 Wanapum/Vantage-Midway Area 230 kV Tecnnical Report (v: 1)   

request access >  login >
Description: Wanapum/Vantage-Midway Area 230 kV Tecnnical Report - final version
Type: Report
Status: FINAL
Contact: Marv Landauer, P.E.   contact via email>

 

04/17/2008 Mid C Needs Statement from System Assessmentt (v: 1)   

request access >  login >
Description: Mid-Columbia Needs Statement from 2008 System Assessment
Type: Document (pdf)
Status: DRAFT
Contact: Marv Landauer, P.E.   contact via email>

 

04/17/2008 North of Wanapum/Vantage Kickoff (v: 1)   

NorthWanVant_kickoff.pdf   download>
Description: North of Wanapum/Vantage 230 kV Studies from BPA/Chelan/Grant Meeting - October 3, 2007
Type: Document (pdf)
Status: DRAFT
Contact: Marv Landauer, P.E.   contact via email>

 

04/15/2008 Planning Report for Board 4.16.08 (v: 1)   

PlanningReport(04.16.08).pdf   download>
Description: Planning report includes system assessment report
Type: Presentation
Status: DRAFT
Contact: Jeffrey C. Miller, P.E.   contact via email>

 

04/04/2008 PSAST Agenda (4.14.08) (v: 1)   

PSASTAgenda041408.pdf   download>
Description: Agenda
Type: Agenda
Status: DRAFT
Contact: Jeffrey C. Miller, P.E.   contact via email>

 

04/04/2008 CG 2018 EHW Contingencies Consolidated_Comments (v: 7)   

request access >  login >
Description: CG 2018 EHW Contingencies Consolidated Comments
Type: Spreadsheet
Status: DRAFT
Contact: Jonathan Young   contact via email>

 

04/04/2008 CG 2018 HS Contingencies Consolidated Comments (v: 3)   

request access >  login >
Description: CG 2018 HS Contingencies Consolidated Comments
Type: Spreadsheet
Status: DRAFT
Contact: Jonathan Young   contact via email>

 

04/04/2008 CG 2018 HW Contingencies Consolidated_Comments (v: 12)   

request access >  login >
Description: CG 2018 HW Contingencies Consolidated Comments
Type: Spreadsheet
Status: DRAFT
Contact: Jonathan Young   contact via email>

 

03/13/2008 Draft Meeting Agenda (3.18.08) (v: 1)   

BiennialMtgAgenda(3.18.08).pdf   download>
Description: Meeting Agenda (3.18.08)
Type: Agenda
Status: DRAFT
Contact: Marv Landauer, P.E.   contact via email>

 

03/13/2008 Issues to Address in Future Studies (3.14.08) (v: 1)   

suesFutureStudies(3.18.08).pdf   download>
Description: Issues to Address in Future Studies
Type:
Status: DRAFT

 

03/04/2008 CG 2018 HS Contingencies-AVA-Sno-Grant-BPA (v: 1)   

request access >  login >
Description: CG 2018 HS Contingencies AVA-Sno-Grant-BPA
Type: Spreadsheet
Status: DRAFT
Contact: Marv Landauer, P.E.   contact via email>

 

03/03/2008 Report Schedule (v: 1)   

Report Schedule.pdf   download>
Description: Report Schedule
Type: Document (pdf)
Status: DRAFT
Contact: Marv Landauer, P.E.   contact via email>

 

02/28/2008 Biennial Plan Agenda (v: 1)   

BiennialPlanAgenda30408.pdf   download>
Description: Biennial Plan Agenda for March 4, 2008
Type: Agenda
Status: FINAL
Contact: Marv Landauer, P.E.   contact via email>

 

02/26/2008 CG 2018 HW Contingencies (v: 10)   

request access >  login >
Description: CG 2018 HW Contingencies with comments
Type: Spreadsheet
Status: DRAFT
Contact: Marv Landauer, P.E.   contact via email>

 

02/26/2008 CG 2018 EHW Contingencies (v: 5)   

request access >  login >
Description: CG 2018 EHW Contingencies with comments
Type: Spreadsheet
Status: DRAFT
Contact: Marv Landauer, P.E.   contact via email>

 

02/19/2008 BiennialPlanPlanningAssumptions (v: 1)   

...nningAssumptions(02.20.08).pdf   download>
Description: Biennial Plan Planning Assumptions
Type: Report
Status: FINAL
Contact: Marv Landauer, P.E.   contact via email>

 

02/19/2008 Planning Report (v: 1)   

Planningreport(2.20.08).pdf   download>
Description: Planning Report for February 20, 2008
Type: Report
Status: FINAL
Contact: Jeffrey C. Miller, P.E.   contact via email>

 

02/13/2008 CG 2018 EHW Contingency Results (v: (4))   

request access >  login >
Description: This spreadsheet contains all violations from N-1 and common mode outages run against the CG 2018 EHW PowerWorld case. Each utility is expected to review these violations and provide comments.
Type: Spreadsheet
Status: DRAFT
Contact: Gordon Comegys, P.E.   contact via email>

 

02/11/2008 Obligations Policy (v: 2)   

...ations Policy (v2) 1-23-08.pdf   download>
Description: Obligations Policy (v.2)
Type: Report
Status: DRAFT
Contact: Marv Landauer, P.E.   contact via email>

 

02/11/2008 Biennial Plan Group Agenda 2-14-08 (v: 1)   

... Plan Group Agenda 2-14-08.pdf   download>
Description: Biennial Plan Group Agenda 2-14-08
Type: Agenda
Status: FINAL
Contact: Marv Landauer, P.E.   contact via email>

 

02/11/2008 CG 2018 HS Contingencies (v: 1)   

request access >  login >
Description: This spreadsheet contains all violations from N-1 and common mode outages run against the CG 2018 HS PowerWorld case. Each utility is expected to review these violations and provide comments.
Type: Spreadsheet
Status: DRAFT
Contact: Marv Landauer, P.E.   contact via email>

 

02/08/2008 CG 2018 HW Contingencies (v: 9)   

request access >  login >
Description: This spreadsheet contains all violations from N-1 and common mode outages run against the CG 2018 HW PowerWorld case. Each utility is expected to review these violations and provide comments.
Type: Spreadsheet
Status: DRAFT
Contact: Gordon Comegys, P.E.   contact via email>

 

02/01/2008 2018 Heavy Summer PowerWorld Case (v: 9)   

request access >  login >
Description: ColumbiaGrid 2018 Heavy Summer Planning Case. Started from the WECC 15hs1sa base case.
Type: Base Case
Status: DRAFT
Contact: Amy Johnson   contact via email>

 

02/01/2008 2018 Heavy Summer GE Case (v: 9)   

request access >  login >
Description: ColumbiaGrid 2018 Heavy Summer Planning Case. Started from the WECC 15hs1sa base case. This file is a solved .sav file.
Type: Base Case
Status: DRAFT
Contact: Amy Johnson   contact via email>

 

02/01/2008 2018 Heavy Summer PTI Case (v: 9)   

request access >  login >
Description: ColumbiaGrid 2018 Heavy Summer Planning Case. Started from the WECC 15hs1sa base case.
Type: Base Case
Status: DRAFT
Contact: Amy Johnson   contact via email>

 

01/28/2008 Draft Need Statement-Outline for Olympia Peninsula (v: Draft)   

...tatement Olympia Peninsula.pdf   download>
Description: Draft Need Statement Outline for the Olympia Peninsula
Type:
Status: DRAFT
Contact: Marv Landauer, P.E.   contact via email>

 

01/28/2008 Biennial Plan Group Agenda 1-30-08 (v: 1)   

... Plan Group Agenda 1-30-08.pdf   download>
Description: Agenda
Type: Agenda
Status: FINAL
Contact: Marv Landauer, P.E.   contact via email>

 

01/24/2008 2018 Extra Heavy Winter PowerWorld Case (v: 5)   

request access >  login >
Description: 2018 Extra Heavy Winter Planning Case. Developed from WECC 17hw1a case.
Type: Base Case
Status: DRAFT
Contact: Amy Johnson   contact via email>

 

01/24/2008 2018 Extra Heavy Winter GE Case (v: 5)   

request access >  login >
Description: 2018 Extra Heavy Winter Planning Case. Developed from WECC 17hw1a case. This file is a solved .sav file.
Type: Base Case
Status: DRAFT
Contact: Amy Johnson   contact via email>

 

01/24/2008 2018 Extra Heavy Winter PTI Case (v: 5)   

request access >  login >
Description: 2018 Extra Heavy Winter Planning Case. Developed from WECC 17hw1a case.
Type: Base Case
Status: DRAFT
Contact: Amy Johnson   contact via email>

 

01/24/2008 2018 Heavy Winter PowerWorld Case (v: 14)   

request access >  login >
Description: 2018 Heavy Winter Planning Case. Developed from WECC 2017HW1 case, with load and topology additions from ColumbiaGrid participants and PacifiCorp and Portland General Electric. A confidentiality agreement and password are required.
Type: Base Case
Status: FINAL
Contact: Amy Johnson   contact via email>

 

01/24/2008 2018 Heavy Winter GE Case (v: 14)   

request access >  login >
Description: 2018 Heavy Winter Planning Case. Developed from WECC 2017HW1 case, with load and topology additions from ColumbiaGrid participants and PacifiCorp and Portland General Electric. The PowerWorld version of the case was saved as an epc file to create this version. That epc file was then saved as a solved .sav file. A confidentiality agreement and password are required.
Type: Base Case
Status: FINAL
Contact: Amy Johnson   contact via email>

 

01/24/2008 2018 Heavy Winter PTI Case (v: 14)   

request access >  login >
Description: 2018 Heavy Winter Planning Case. Developed from WECC 2017HW1 case, with load and topology additions from ColumbiaGrid participants and PacifiCorp and Portland General Electric. The PowerWorld version of the case was saved as a PSS/E version 30 raw file to create this version. A confidentiality agreement and password are required.
Type: Base Case
Status: FINAL
Contact: Amy Johnson   contact via email>

 

01/17/2008 2018 Extra Heavy Winter PowerWorld Version 12 Case (v: 4)   

request access >  login >
Description: 2018 Extra Heavy Winter Planning Case. Developed from WECC 17hw1a case.
Type: Base Case
Status: DRAFT
Contact: Amy Johnson   contact via email>

 

01/17/2008 2018 Heavy Summer PowerWorld Version 12 Case (v: 6)   

request access >  login >
Description: ColumbiaGrid 2018 Heavy Summer Planning Case. Started from the WECC 15hs1sa base case.
Type: Base Case
Status: DRAFT
Contact: Amy Johnson   contact via email>

 

01/17/2008 2018 Heavy Winter PowerWorld Version 12 Case (v: 13)   

request access >  login >
Description: 2018 Heavy Winter Planning Case. Developed from WECC 2017HW1 case, with load and topology additions from ColumbiaGrid participants and PacifiCorp and Portland General Electric. This case was saved as a version 12 base case. A confidentiality agreement and password are required since this file is considered CEII.
Type: Base Case
Status: DRAFT
Contact: Amy Johnson   contact via email>

 

01/15/2008 CG 2018 HW Unsolved Contingencies by Area (v: 1)   

request access >  login >
Description: This spreadsheet contains a list of all unsolved contingencies for the CG 2018 HW case. These contingencies are listed on separate tabs for each area.
Type: Spreadsheet
Status: DRAFT
Contact: Gordon Comegys, P.E.   contact via email>

 

01/11/2008 CG 2018 EHW with Contingencies (v: 1)   

request access >  login >
Description: Zip file containing PowerWorld 2018 Heavy Winter version 13 case, with contingencies
Type: Base Case
Status: DRAFT
Contact: Gordon Comegys, P.E.   contact via email>

 

01/08/2008 WECC Coordinated Planning and Technical Studies(Final) (v: 1)   

...d Technical Studies(Final).pdf   download>
Description: WECC Coordinated Plan and Technical Studies
Type: Report
Status: FINAL
Contact: Marv Landauer, P.E.   contact via email>

 

01/08/2008 Combined Wind Projects - Draft (v: 1)   

combinedwindprojects.pdf   download>
Description: Wind projects, construction, pending, operating
Type: Document (pdf)
Status: DRAFT
Contact: Tammy Beckwith   contact via email>

 

01/08/2008 Upcoming ColumbiaGrid Studies (v: 1)   

...oming ColumbiaGrid Studies.doc   download>
Description: Upcoming ColumbiaGrid Studies
Type: Report
Status: DRAFT
Contact: Marv Landauer, P.E.   contact via email>

 

01/08/2008 System Assessment Study Plan (v.4) 12-12 edits (v: 4)   

...udy Plan (v.4) 12-12 edits.doc   download>
Description: System Assessment Study Plan
Type: Report
Status: DRAFT
Contact: Marv Landauer, P.E.   contact via email>

 

01/08/2008 Biennial Plan Group Agenda 1-09-08 (v: 1)   

... Plan Group Agenda 1-09-08.doc   download>
Description: Biennial Plan Group Agenda for 1-09-08
Type: Agenda
Status: FINAL
Contact: Marv Landauer, P.E.   contact via email>

 

01/04/2008 Draft PSAST Agenda (01.10.08) (v: draft)   

11008_Draft_PSAST_Agenda.pdf   download>
Description: Draft PSAST Agenda
Type: Agenda
Status: DRAFT
Contact: Dean Perry   contact via email>

 

12/21/2007 CG 2018 HW with Contingencies (v: 1)   

request access >  login >
Description: Zip file containing PowerWorld 2018 Heavy Winter version 13 case, with contingencies.
Type: Base Case
Status: DRAFT
Contact: Gordon Comegys, P.E.   contact via email>

 

12/18/2007 Sea Breeze Slide Presentation (12.12.07) (v: 1)   

...r CG Biennial Planning Mtg.pdf   download>
Description: Sea Breeze Slide Presentation for Biennial Planning Meeting (12.12.07)
Type: Presentation
Status: FINAL
Contact: Marv Landauer, P.E.   contact via email>

 

12/14/2007 Biennial Planning Meeting-Action Items (12.12.07) (v: 1)   

...ng-Action Items (12.12.07).pdf   download>
Description: Act6ion Items from December 12, 2007 Meeting
Type:
Status: FINAL
Contact: Marv Landauer, P.E.   contact via email>

 

12/12/2007 Tieline Flows (12.12.07) (v: 1)   

Tieline Flows (12.12.07).xls   download>
Description: Tieline Flows
Type: Spreadsheet
Status: DRAFT
Contact: Marv Landauer, P.E.   contact via email>

 

12/12/2007 NW Gen Summary (12.12.07) (v: 1)   

NW Gen Summary (12.12.07).xls   download>
Description: NW Generation Summary - Participation Groups
Type: Spreadsheet
Status: DRAFT
Contact: Marv Landauer, P.E.   contact via email>

 

12/12/2007 Contingency Results Comparions Summary (12.12.07) (v: 1)   

...parions Summary (12.12.07).xls   download>
Description: Contingency Results Comparions Summary
Type: Spreadsheet
Status: DRAFT
Contact: Marv Landauer, P.E.   contact via email>

 

12/11/2007 Biennial Plan Report Outline (12.12.07) (v: 1)   

... Report Outline (12.12.07).pdf   download>
Description: Biennial Plan Report Outline
Type:
Status: DRAFT
Contact: Marv Landauer, P.E.   contact via email>

 

12/11/2007 System Assessment Study Plan (v 3) 11.20.07 edits (v: 3)   

...udy Plan (v 3) 11-20 edits.pdf   download>
Description: System Assessment Study Plan 11-20-07 edits
Type: Report
Status: DRAFT
Contact: Marv Landauer, P.E.   contact via email>

 

12/11/2007 120407 Winter_2008_Nomo_Analysis (v: 1)   

... Winter_2008_Nomo_Analysis.zip   download>
Description: Winter 2008 Nomogram Analysis for TRCM Discussion
Type: Spreadsheet
Status: FINAL
Contact: Dean Perry   contact via email>

 

12/11/2007 Biennial Plan Group Agenda (12.12.07) (v: 2)   

... Group Agenda 12-12-07 (2).pdf   download>
Description: Biennial Planning Group Meeting Agenda 12-12-07
Type: Agenda
Status: FINAL
Contact: Marv Landauer, P.E.   contact via email>

 

12/07/2007 GIANT Projects Study Plan (12.7.07 Draft) (v: 1)   

...rojects Study Plan 12-7-07.pdf   download>
Description: GIANT Projects Study Plan 12-7-07
Type: Presentation
Status: DRAFT
Contact: Jeffrey C. Miller, P.E.   contact via email>

 

12/07/2007 Wind Integration Study Plan (12.7.07 draft) (v: 1)   

...gration Study Plan 12-7-07.pdf   download>
Description: Wind Integration Study Plan 12-7-07
Type: Presentation
Status: DRAFT
Contact: Jeffrey C. Miller, P.E.   contact via email>

 

12/07/2007 Upcoming ColumbiaGrid Studies (12.7.07) (v: 2 )   

...lumbiaGrid Studies 12-7-07.pdf   download>
Description: Upcoming ColumbiaGrid Studies 12-7-07 draft
Type: Report
Status: DRAFT
Contact: Marv Landauer, P.E.   contact via email>

 

11/28/2007 Draft Study Plan (12.04.07) (v: 2)   

...Draft_Study_Plan_version_2.pdf   download>
Description: Draft Study Plan v.2
Type: Report
Status: DRAFT
Contact: Dean Perry   contact via email>

 

11/19/2007 Biennial Planning Meeting Agenda (11.20.07) (v: final)   

... Group Agenda 11-20-07 (2).pdf   download>
Description: 11-20-07 Biennial Planning Meeting Agenda
Type: Agenda
Status: FINAL
Contact: Marv Landauer, P.E.   contact via email>

 

11/19/2007 PSASG Update Report (Final 11.16.07) (v: final)   

...Report_2007 Nov 16 _Final_.pdf   download>
Description: PSASG Update Report November 16, 2007 (Final)
Type: Report
Status: FINAL
Contact: Dean Perry   contact via email>

 

11/19/2007 System Assessment Study Plan (11-15-07) (v: 1)   

...sment Proposal 11-15 edits.pdf   download>
Description: System Assessment Study Plan 11-15
Type: Report
Status: DRAFT
Contact: Marv Landauer, P.E.   contact via email>

 

11/19/2007 Upcoming ColumbiaGrid Studies (v: 1)   

...oming ColumbiaGrid Studies.pdf   download>
Description: Upcoming ColumbiaGrid Studies
Type: Spreadsheet
Status: FINAL
Contact: Marv Landauer, P.E.   contact via email>

 

11/14/2007 Regional Projects with Impacts on ColGrid Facilities (v: 3)   

...olumbiaGrid Facilities (3).pdf   download>
Description: This list and analysis was developed from information available to ColumbiaGrid as of Oct 2007
Type: Report
Status: FINAL
Contact: Marv Landauer, P.E.   contact via email>

 

11/06/2007 Base Case Load Levels (v: 1)   

basecase load levels.pdf   download>
Description: Base Case Load Levels
Type: Spreadsheet
Status: FINAL
Contact: Marv Landauer, P.E.   contact via email>

 

11/06/2007 System Assessment Proposal (10.16.07 edits) (v: 2)   

...t Proposal 10-16 edits (2).pdf   download>
Description: System Assessment Proposal 10-16-07 edits
Type: Report
Status: DRAFT
Contact: Marv Landauer, P.E.   contact via email>

 

10/16/2007 PSAST Meeting Agenda (10.18.07) (v: 2)   

101807_Draft_Agenda_rev. 4.doc   download>
Description: Draft Agenda for Oct 18 Meeting version 2
Type: Agenda
Status: FINAL
Contact: Dean Perry   contact via email>

 

10/16/2007 Draft PSASG Update Report (v: zipped)   

...ate Report_11 Oct 2007.zap.zip   download>
Description: Draft PSASG Update Report zipped (for ease of viewing and printing)
Type: Report
Status: FINAL

 

10/12/2007 Draft PSASG Update Report (v: 1)   

..._Update_Report_2007_Oct_11.pdf   download>
Description: Draft update to the 2004 Puget Sound Area Study Group Report: Assessment of Puget Sound Area/Northern Intertie Curtailment Risk
Type: Report
Status: FINAL
Contact: Dean Perry   contact via email>

 

10/05/2007 Biennial Plan Meeting Agenda (v: 1)   

... Plan Group Agenda 10-9-07.doc   download>
Type: Agenda
Status: FINAL
Contact: Marv Landauer, P.E.   contact via email>

 

10/05/2007 Report Outlines (v: 1)   

Report Outlines.doc   download>
Description: System Assessment Report Outline
Type: Report
Status: FINAL
Contact: Marv Landauer, P.E.   contact via email>

 

10/05/2007 System Assessment Proposal (v: 1)   

... Study Plan 9-26 edits v.1.doc   download>
Description: System Assessment Proposal
Type: Report
Status: DRAFT
Contact: Marv Landauer, P.E.   contact via email>

 

10/04/2007 ColumbiaGrid Initial Transmission Plan (10.04.07) (v: 2)   

...ssion Plan 10-4-2007 (v.2).xls   download>
Description: Regional projects with a high level assessment of their impact to ColumbiaGrid facilities are summarized in (link). This summary includes projects proposed by others that might have impact on ColumbiaGrid facilities. This list was collected by ColumbiaGrid from available information. Comments are welcome.
Type: Spreadsheet
Status: DRAFT
Contact: Marv Landauer, P.E.   contact via email>

 

09/25/2007 ColumbiaGrid Planning Areas Diagram (9.26.07) (v: 1)   

...rid Planning Areas Diagram.pdf   download>
Description: ColumbiaGrid Planning Areas Diagram
Type: Map
Status: FINAL
Contact: Marv Landauer, P.E.   contact via email>

 

09/25/2007 2007 System Assessment Proposal (v: 1)   

stem Assessment Study Plan.pdf   download>
Description: 2007 System Assessment Proposal
Type:
Status: DRAFT
Contact: Marv Landauer, P.E.   contact via email>

 

09/24/2007 Draft PSASG Update Report (v: 1)   

...G_Update_Report_2007-09-19.pdf   download>
Description: Draft PSASG Update Report, PSAST 9-24-2007 Mtg - Dobson-Mack
Type: Report
Status: DRAFT
Contact: Dean Perry   contact via email>

 

09/24/2007 PSASG Project Update Report (v: 1)   

... P. - PSASG_Project_Update.ppt   download>
Description: Puget Sound Area Projects Update - PSAST 9-24-2007 Agenda Item 3 - Phillips
Type: Report
Status: FINAL
Contact: Dean Perry   contact via email>

 

09/20/2007 CG Planning Report (9.19.07) (v: 1)   

g-planning-report-19sept07.pdf   download>
Description: CG Planning Report (9.19.07)
Type: Presentation
Status: FINAL
Contact: Marv Landauer, P.E.   contact via email>

 

09/20/2007 10-Yr Planning Meeting Agenda (9.26.07) (v: 1)   

...nning Group Agenda 9-26-07.pdf   download>
Type: Agenda
Status: FINAL
Contact: Marv Landauer, P.E.   contact via email>

 

09/20/2007 General Planning Areas Description (v: 1)   

...Planning Areas Description.pdf   download>
Type: Document (pdf)
Status: FINAL
Contact: Marv Landauer, P.E.   contact via email>

 

09/20/2007 2007 System Assessment Proposal (v: 1)   

...System Assessment Proposal.pdf   download>
Type: Document (pdf)
Status: DRAFT
Contact: Marv Landauer, P.E.   contact via email>

 

09/14/2007 Puget Sound Area Study Team Kick Off Meeting 09242007 Agenda (v: 1)   

...ff Meeting 09242007 Agenda.pdf   download>
Description: Proposed Agenda for Puget Sound Area Study Team Kick Off Meeting on 9/24/2007 at Puget Sound Energy Offices
Type: Agenda
Status: DRAFT
Contact: Dean Perry   contact via email>

 

09/05/2007 General Planning Areas Description (v: 1)   

...Planning Areas Description.pdf   download>
Description: General Planning Areas Description
Type: Report
Status: FINAL
Contact: Marv Landauer, P.E.   contact via email>