08/08/2008 Action Items 25 June 2008 (v: 1)   

tion Items from 25June2008.pdf   download>
Description: Action Items from 25 June 2008
Type:
Status: FINAL
Contact: Marv Landauer   contact via email>

 

08/08/2008 Mid-C Study Plan (v: 1)   

Mid-C_Study Plan1.pdf   download>
Description: Mid-C-Study Plan
Type:
Status: FINAL
Contact: Marv Landauer   contact via email>

 

05/20/2008 N I Summer 2008 Operating Nomograms (FINAL) (v: final)   

... Operating Nomograms_FINAL.pdf   download>
Description: Northern Intertie Summer 2008 Operating Nomograms (FINAL)
Type:
Status: FINAL

 

03/13/2008 Issues to Address in Future Studies (3.14.08) (v: 1)   

suesFutureStudies(3.18.08).pdf   download>
Description: Issues to Address in Future Studies
Type:
Status: DRAFT

 

01/28/2008 Draft Need Statement-Outline for Olympia Peninsula (v: Draft)   

...tatement Olympia Peninsula.pdf   download>
Description: Draft Need Statement Outline for the Olympia Peninsula
Type:
Status: DRAFT
Contact: Marv Landauer   contact via email>

 

12/14/2007 Biennial Planning Meeting-Action Items (12.12.07) (v: 1)   

...ng-Action Items (12.12.07).pdf   download>
Description: Act6ion Items from December 12, 2007 Meeting
Type:
Status: FINAL
Contact: Marv Landauer   contact via email>

 

12/11/2007 Biennial Plan Report Outline (12.12.07) (v: 1)   

... Report Outline (12.12.07).pdf   download>
Description: Biennial Plan Report Outline
Type:
Status: DRAFT
Contact: Marv Landauer   contact via email>

 

09/25/2007 2007 System Assessment Proposal (v: 1)   

stem Assessment Study Plan.pdf   download>
Description: 2007 System Assessment Proposal
Type:
Status: DRAFT
Contact: Marv Landauer   contact via email>

 

Adobe Acrobat Document (pdf)

11/14/2008 Winter 2009 Nomo Analysis (Powerex) (v: 1)   

request access >  login >
Description: Winter 2009 Nomo Analysis (Powerex)
Type: Adobe Acrobat Document (pdf)
Status: FINAL

 

Adobe Acrobat Document (pdf)

10/31/2008 2008 Biennial Plan Attachments (v: 1)   

attachments1.pdf   download>
Description: Biennial Plan Attachments
Type: Adobe Acrobat Document (pdf)
Status: DRAFT
Open for Comment    submit comment >
Contact: Marv Landauer   contact via email>

 

Adobe Acrobat Document (pdf)

01/08/2008 Combined Wind Projects - Draft (v: 1)   

combinedwindprojects.pdf   download>
Description: Wind projects, construction, pending, operating
Type: Adobe Acrobat Document (pdf)
Status: DRAFT
Contact: Tammy Beckwith   contact via email>

 

Adobe Acrobat Document (pdf)

09/20/2007 General Planning Areas Description (v: 1)   

...Planning Areas Description.pdf   download>
Type: Adobe Acrobat Document (pdf)
Status: FINAL
Contact: Marv Landauer   contact via email>

 

Adobe Acrobat Document (pdf)

09/20/2007 2007 System Assessment Proposal (v: 1)   

...System Assessment Proposal.pdf   download>
Type: Adobe Acrobat Document (pdf)
Status: DRAFT
Contact: Marv Landauer   contact via email>

 

Agenda

11/17/2008 Biennial Plan Group Agenda (11.18.08) (v: 1)   

Agenda (11-18-08.pdf).pdf   download>
Description: Biennial Plan Group Agenda (11.18.08)
Type: Agenda
Status: FINAL
Contact: Marv Landauer   contact via email>

 

Agenda

11/14/2008 No. Mid-C Agenda (11-19-08) (v: 1)   

NMCST Agenda 11-19-08.doc   download>
Description: Agenda for November 19th North Mid Columbia study team meeting
Type: Agenda
Status: DRAFT
Contact: Amy Johnson   contact via email>

 

Agenda

10/20/2008 Draft Agenda (10.22.08) (v: 1)   

draftAgenda(10.22.08)2.pdf   download>
Description: Draft Agenda (10.22.08)
Type: Agenda
Status: FINAL
Contact: Jeffrey C. Miller, P.E.   contact via email>

 

Agenda

10/07/2008 Draft Agenda (10.9.08) (v: 2)   

DraftAgenda(10.9.08)2.pdf   download>
Description: Draft Agenda(10.9.08)
Type: Agenda
Status: FINAL
Contact: Jeffrey C. Miller, P.E.   contact via email>

 

Agenda

09/23/2008 PSAST Agenda (09.25.08) (v: 1)   

PSAST.Agenda(09.25.08)1.pdf   download>
Description: PSAST Agenda
Type: Agenda
Status: DRAFT
Contact: Jeffrey C. Miller, P.E.   contact via email>

 

Agenda

09/18/2008 No. Mid-C Agenda (9-22-08) (v: 1)   

Agenda (9-22-08).pdf   download>
Description: Agenda (9-22-08)
Type: Agenda
Status: FINAL
Contact: Marv Landauer   contact via email>

 

Agenda

09/15/2008 Biennial Planning Mtg Agenda 9-16-08 (v: 1)   

Agenda(9.16.08).pdf   download>
Description: Agenda
Type: Agenda
Status: DRAFT
Contact: Marv Landauer   contact via email>

 

Agenda

08/08/2008 Agenda (08.15.08) (v: 1)   

NMCST Agenda 8-15-08.pdf   download>
Description: Agenda for August 15, 2008 meeting
Type: Agenda
Status: FINAL
Contact: Marv Landauer   contact via email>

 

Agenda

08/07/2008 Biennial Plan Agenda (v: 1)   

agenda(8.14.08).pdf   download>
Description: Biennial Plan Agenda
Type: Agenda
Status: DRAFT
Contact: Marv Landauer   contact via email>

 

Agenda

07/02/2008 Biennial Planning Agenda 7.10.08 (v: 1)   

... Plan Group Agenda 7.10.08.pdf   download>
Description: Biennial Planning Agenda 7.10.08
Type: Agenda
Status: DRAFT
Contact: Marv Landauer   contact via email>

 

Agenda

06/24/2008 Agenda (6-25-08) (v: 2)   

NMCST Agenda 6-25-08f.pdf   download>
Description: Agenda for Northern Mid-C June 25, 2008 Meeting
Type: Agenda
Status: FINAL
Contact: Marv Landauer   contact via email>

 

Agenda

05/21/2008 Northern Mid-C Mtg Agenda (v: 1)   

Agenda052108.pdf   download>
Description: Agenda
Type: Agenda
Status: FINAL
Contact: Marv Landauer   contact via email>

 

Agenda

05/19/2008 PSAST Agenda 5-20-08 Rev (v: 1)   

Agenda 5-20-08r1.pdf   download>
Description: PSAST Agenda
Type: Agenda
Status: FINAL
Contact: Jeffrey C. Miller, P.E.   contact via email>

 

Agenda

04/28/2008 Draft Agenda (v: 1)   

Draft Agenda.pdf   download>
Description: Draft Agenda for April 30, 2008 Meeting
Type: Agenda
Status: DRAFT
Contact: Marv Landauer   contact via email>

 

Agenda

04/21/2008 Draft Agenda 4-22-08 (v: 2)   

NMCST Agenda 4-22-08.pdf   download>
Description: Draft Agenda for Initial Northern Mid-Columbia Transmission Meeting
Type: Agenda
Status: DRAFT
Contact: Marv Landauer   contact via email>

 

Agenda

04/04/2008 PSAST Agenda (4.14.08) (v: 1)   

PSASTAgenda041408.pdf   download>
Description: Agenda
Type: Agenda
Status: DRAFT
Contact: Jeffrey C. Miller, P.E.   contact via email>

 

Agenda

03/13/2008 Draft Meeting Agenda (3.18.08) (v: 1)   

BiennialMtgAgenda(3.18.08).pdf   download>
Description: Meeting Agenda (3.18.08)
Type: Agenda
Status: DRAFT
Contact: Marv Landauer   contact via email>

 

Agenda

02/28/2008 Biennial Plan Agenda (v: 1)   

BiennialPlanAgenda30408.pdf   download>
Description: Biennial Plan Agenda for March 4, 2008
Type: Agenda
Status: FINAL
Contact: Marv Landauer   contact via email>

 

Agenda

02/11/2008 Biennial Plan Group Agenda 2-14-08 (v: 1)   

... Plan Group Agenda 2-14-08.pdf   download>
Description: Biennial Plan Group Agenda 2-14-08
Type: Agenda
Status: FINAL
Contact: Marv Landauer   contact via email>

 

Agenda

01/28/2008 Biennial Plan Group Agenda 1-30-08 (v: 1)   

... Plan Group Agenda 1-30-08.pdf   download>
Description: Agenda
Type: Agenda
Status: FINAL
Contact: Marv Landauer   contact via email>

 

Agenda

01/08/2008 Biennial Plan Group Agenda 1-09-08 (v: 1)   

... Plan Group Agenda 1-09-08.doc   download>
Description: Biennial Plan Group Agenda for 1-09-08
Type: Agenda
Status: FINAL
Contact: Marv Landauer   contact via email>

 

Agenda

01/04/2008 Draft PSAST Agenda (01.10.08) (v: draft)   

11008_Draft_PSAST_Agenda.pdf   download>
Description: Draft PSAST Agenda
Type: Agenda
Status: DRAFT
Contact: Dean Perry   contact via email>

 

Agenda

12/11/2007 Biennial Plan Group Agenda (12.12.07) (v: 2)   

... Group Agenda 12-12-07 (2).pdf   download>
Description: Biennial Planning Group Meeting Agenda 12-12-07
Type: Agenda
Status: FINAL
Contact: Marv Landauer   contact via email>

 

Agenda

11/19/2007 Biennial Planning Meeting Agenda (11.20.07) (v: final)   

... Group Agenda 11-20-07 (2).pdf   download>
Description: 11-20-07 Biennial Planning Meeting Agenda
Type: Agenda
Status: FINAL
Contact: Marv Landauer   contact via email>

 

Agenda

10/16/2007 PSAST Meeting Agenda (10.18.07) (v: 2)   

101807_Draft_Agenda_rev. 4.doc   download>
Description: Draft Agenda for Oct 18 Meeting version 2
Type: Agenda
Status: FINAL
Contact: Dean Perry   contact via email>

 

Agenda

10/05/2007 Biennial Plan Meeting Agenda (v: 1)   

... Plan Group Agenda 10-9-07.doc   download>
Type: Agenda
Status: FINAL
Contact: Marv Landauer   contact via email>

 

Agenda

09/20/2007 10-Yr Planning Meeting Agenda (9.26.07) (v: 1)   

...nning Group Agenda 9-26-07.pdf   download>
Type: Agenda
Status: FINAL
Contact: Marv Landauer   contact via email>

 

Agenda

09/14/2007 Puget Sound Area Study Team Kick Off Meeting 09242007 Agenda (v: 1)   

...ff Meeting 09242007 Agenda.pdf   download>
Description: Proposed Agenda for Puget Sound Area Study Team Kick Off Meeting on 9/24/2007 at Puget Sound Energy Offices
Type: Agenda
Status: DRAFT
Contact: Dean Perry   contact via email>

 

Base Case

02/01/2008 2018 Heavy Summer PowerWorld Case (v: 9)   

request access >  login >
Description: ColumbiaGrid 2018 Heavy Summer Planning Case. Started from the WECC 15hs1sa base case.
Type: Base Case
Status: DRAFT
Contact: Amy Johnson   contact via email>

 

Base Case

02/01/2008 2018 Heavy Summer GE Case (v: 9)   

request access >  login >
Description: ColumbiaGrid 2018 Heavy Summer Planning Case. Started from the WECC 15hs1sa base case. This file is a solved .sav file.
Type: Base Case
Status: DRAFT
Contact: Amy Johnson   contact via email>

 

Base Case

02/01/2008 2018 Heavy Summer PTI Case (v: 9)   

request access >  login >
Description: ColumbiaGrid 2018 Heavy Summer Planning Case. Started from the WECC 15hs1sa base case.
Type: Base Case
Status: DRAFT
Contact: Amy Johnson   contact via email>

 

Base Case

01/24/2008 2018 Extra Heavy Winter PowerWorld Case (v: 5)   

request access >  login >
Description: 2018 Extra Heavy Winter Planning Case. Developed from WECC 17hw1a case.
Type: Base Case
Status: DRAFT
Contact: Amy Johnson   contact via email>

 

Base Case

01/24/2008 2018 Extra Heavy Winter GE Case (v: 5)   

request access >  login >
Description: 2018 Extra Heavy Winter Planning Case. Developed from WECC 17hw1a case. This file is a solved .sav file.
Type: Base Case
Status: DRAFT
Contact: Amy Johnson   contact via email>

 

Base Case

01/24/2008 2018 Extra Heavy Winter PTI Case (v: 5)   

request access >  login >
Description: 2018 Extra Heavy Winter Planning Case. Developed from WECC 17hw1a case.
Type: Base Case
Status: DRAFT
Contact: Amy Johnson   contact via email>

 

Base Case

01/24/2008 2018 Heavy Winter PowerWorld Case (v: 14)   

request access >  login >
Description: 2018 Heavy Winter Planning Case. Developed from WECC 2017HW1 case, with load and topology additions from ColumbiaGrid participants and PacifiCorp and Portland General Electric. A confidentiality agreement and password are required.
Type: Base Case
Status: FINAL
Contact: Amy Johnson   contact via email>

 

Base Case

01/24/2008 2018 Heavy Winter GE Case (v: 14)   

request access >  login >
Description: 2018 Heavy Winter Planning Case. Developed from WECC 2017HW1 case, with load and topology additions from ColumbiaGrid participants and PacifiCorp and Portland General Electric. The PowerWorld version of the case was saved as an epc file to create this version. That epc file was then saved as a solved .sav file. A confidentiality agreement and password are required.
Type: Base Case
Status: FINAL
Contact: Amy Johnson   contact via email>

 

Base Case

01/24/2008 2018 Heavy Winter PTI Case (v: 14)   

request access >  login >
Description: 2018 Heavy Winter Planning Case. Developed from WECC 2017HW1 case, with load and topology additions from ColumbiaGrid participants and PacifiCorp and Portland General Electric. The PowerWorld version of the case was saved as a PSS/E version 30 raw file to create this version. A confidentiality agreement and password are required.
Type: Base Case
Status: FINAL
Contact: Amy Johnson   contact via email>

 

Base Case

01/11/2008 CG 2018 EHW with Contingencies (v: 1)   

request access >  login >
Description: Zip file containing PowerWorld 2018 Heavy Winter version 13 case, with contingencies
Type: Base Case
Status: DRAFT
Contact: Gordon Comegys   contact via email>

 

Base Case

12/21/2007 CG 2018 HW with Contingencies (v: 1)   

request access >  login >
Description: Zip file containing PowerWorld 2018 Heavy Winter version 13 case, with contingencies.
Type: Base Case
Status: DRAFT
Contact: Gordon Comegys   contact via email>

 

Map

08/14/2008 NMC Map (v: 1)   

NMC Map (2).pdf   download>
Description: NMC Map
Type: Map
Status: FINAL
Contact: Marv Landauer   contact via email>

 

Map

04/24/2008 500 kV System PowerWorld OneLine (v: 2)   

request access >  login >
Description: PowerWorld version 13 oneline diagram (.pwd). This diagram was developed by BPA, and minor adjustments were made for compatibility with the ColumbiaGrid planning cases.
Type: Map
Status: DRAFT
Contact: Amy Johnson   contact via email>

 

Map

09/25/2007 ColumbiaGrid Planning Areas Diagram (9.26.07) (v: 1)   

...rid Planning Areas Diagram.pdf   download>
Description: ColumbiaGrid Planning Areas Diagram
Type: Map
Status: FINAL
Contact: Marv Landauer   contact via email>

 

Presentation

11/18/2008 CG Planning Meeting Presentation (v: 1)   

Planningmtg(11.18.08).pdf   download>
Description: CG Planning Meeting Presentation
Type: Presentation
Status: DRAFT
Contact: Marv Landauer   contact via email>

 

Presentation

10/10/2008 NOS Update from BPA (v: 1)   

NOSUpdate(10.09.08).pdf   download>
Description: NOS Update from BPA
Type: Presentation
Status: DRAFT

 

Presentation

10/08/2008 Regional Economic Analysis CG Final (v: 1)   

Reg.Eco.Ana._CG.pdf   download>
Description: Regional Economic Analysis CG Final
Type: Presentation
Status: DRAFT

 

Presentation

10/07/2008 Biennial Plan Process & Schedule (v: 1)   

Bien.Pro.Sched.(10.9.08).pdf   download>
Description: Biennial Plan Process & Schedule
Type: Presentation
Status: DRAFT
Contact: Jeffrey C. Miller, P.E.   contact via email>

 

Presentation

10/07/2008 Regional Coordination Activities (v: 1)   

Reg.Coor.Act.(10.9.08).pdf   download>
Description: Regional Coordination Activities
Type: Presentation
Status: DRAFT
Contact: Jeffrey C. Miller, P.E.   contact via email>

 

Presentation

09/15/2008 NTTG MT-MidC Line at CG Draft (v: 1)   

NTTGMT-MidC(9.16.08).pdf   download>
Description: NTTG MT-MidC Line at CG Draft
Type: Presentation
Status: DRAFT

 

Presentation

08/14/2008 NOS Update (v: 1)   

...ing NOS Update 8-14-08 (2).pdf   download>
Description: NOS Update
Type: Presentation
Status: FINAL

 

Presentation

05/20/2008 PSAST TCRM Script (v: 1)   

PSAST TCRM Script.ppt   download>
Description: PSAST TCRM Script
Type: Presentation
Status: DRAFT
Contact: Marv Landauer   contact via email>

 

Presentation

05/19/2008 TCRM Nomograms Comparison (v: 1)   

TCRM Nomograms Summary.pdf   download>
Description: TCRM Nomograms Comparison for 2003-2008
Type: Presentation
Status: FINAL

 

Presentation

05/19/2008 Rating Study Plan (v: 1)   

Rating Study Plan 09may08.pdf   download>
Description: NW - BC (Path3) Phase 1 Path Rating Study Plan presented to PSAST Ma6 20, 2008 meeting
Type: Presentation
Status: FINAL

 

Presentation

04/15/2008 Planning Report for Board 4.16.08 (v: 1)   

PlanningReport(04.16.08).pdf   download>
Description: Planning report includes system assessment report
Type: Presentation
Status: DRAFT
Contact: Jeffrey C. Miller, P.E.   contact via email>

 

Presentation

12/18/2007 Sea Breeze Slide Presentation (12.12.07) (v: 1)   

...r CG Biennial Planning Mtg.pdf   download>
Description: Sea Breeze Slide Presentation for Biennial Planning Meeting (12.12.07)
Type: Presentation
Status: FINAL
Contact: Marv Landauer   contact via email>

 

Presentation

12/07/2007 GIANT Projects Study Plan (12.7.07 Draft) (v: 1)   

...rojects Study Plan 12-7-07.pdf   download>
Description: GIANT Projects Study Plan 12-7-07
Type: Presentation
Status: DRAFT
Contact: Jeffrey C. Miller, P.E.   contact via email>

 

Presentation

12/07/2007 Wind Integration Study Plan (12.7.07 draft) (v: 1)   

...gration Study Plan 12-7-07.pdf   download>
Description: Wind Integration Study Plan 12-7-07
Type: Presentation
Status: DRAFT
Contact: Jeffrey C. Miller, P.E.   contact via email>

 

Presentation

09/20/2007 CG Planning Report (9.19.07) (v: 1)   

g-planning-report-19sept07.pdf   download>
Description: CG Planning Report (9.19.07)
Type: Presentation
Status: FINAL
Contact: Marv Landauer   contact via email>

 

Report

10/31/2008 Preliminary Draft 2008-2018 Transmission Expansion Plan (v: 1)   

prelimDRAFTtx_exp_Plan.doc   download>
Description: Preliminary Draft 2008-2018 Transmission Expansion Plan
Type: Report
Status: DRAFT
Open for Comment    submit comment >
Contact: Marv Landauer   contact via email>

 

Report

09/12/2008 Attachment B - Resources used in Base Cases (v: 1)   

...ources-basecases(9.12.08)2.doc   download>
Description: Attachment B - Resources used in Base Cases
Type: Report
Status: DRAFT
Contact: Marv Landauer   contact via email>

 

Report

09/12/2008 Summary of Sensitivity Studies - Draft (v: 1)   

mSensitivityStudy(9.12.08).pdf   download>
Description: Summary of Sensitivity Studies - Draft
Type: Report
Status: DRAFT
Contact: Marv Landauer   contact via email>

 

Report

05/20/2008 Nomogram Simulation Scripting Draft Scope Rev (v: 1)   

...g Draft Scope Rev May 2008.doc   download>
Description: Nomogram Simulation Scripting Draft Scope Rev
Type: Report
Status: DRAFT
Contact: Marv Landauer   contact via email>

 

Report

05/06/2008 2008 System Assessment Report (v: 1)   

...ssessmentwebsmall(5.2.08)1.pdf   download>
Description: 2008 System Assessment Report
Type: Report
Status: FINAL
Contact: Jeffrey C. Miller, P.E.   contact via email>

 

Report

04/29/2008 NOS Future Needs (04.30.08) (v: 1)   

OS FutureNeeds(04.30.2008).pdf   download>
Description: NOS Future Needs(04.30.08) - BPA report
Type: Report
Status: FINAL
Contact: Marv Landauer   contact via email>

 

Report

04/29/2008 BPA WOCS Status (4.30.08) (v: 1)   

BPA WOCS STATUS (4.30.08).pdf   download>
Description: BPA West Of Cascades South Status Report
Type: Report
Status: FINAL
Contact: Marv Landauer   contact via email>

 

Report

04/17/2008 Wanapum/Vantage-Midway Area 230 kV Tecnnical Report (v: 1)   

request access >  login >
Description: Wanapum/Vantage-Midway Area 230 kV Tecnnical Report - final version
Type: Report
Status: FINAL
Contact: Marv Landauer   contact via email>

 

Report

02/19/2008 BiennialPlanPlanningAssumptions (v: 1)   

...nningAssumptions(02.20.08).pdf   download>
Description: Biennial Plan Planning Assumptions
Type: Report
Status: FINAL
Contact: Marv Landauer   contact via email>

 

Report

02/19/2008 Planning Report (v: 1)   

Planningreport(2.20.08).pdf   download>
Description: Planning Report for February 20, 2008
Type: Report
Status: FINAL
Contact: Jeffrey C. Miller, P.E.   contact via email>

 

Report

02/11/2008 Obligations Policy (v: 2)   

...ations Policy (v2) 1-23-08.pdf   download>
Description: Obligations Policy (v.2)
Type: Report
Status: DRAFT
Contact: Marv Landauer   contact via email>

 

Report

01/08/2008 WECC Coordinated Planning and Technical Studies(Final) (v: 1)   

...d Technical Studies(Final).pdf   download>
Description: WECC Coordinated Plan and Technical Studies
Type: Report
Status: FINAL
Contact: Marv Landauer   contact via email>

 

Report

01/08/2008 Upcoming ColumbiaGrid Studies (v: 1)   

...oming ColumbiaGrid Studies.doc   download>
Description: Upcoming ColumbiaGrid Studies
Type: Report
Status: DRAFT
Contact: Marv Landauer   contact via email>

 

Report

01/08/2008 System Assessment Study Plan (v.4) 12-12 edits (v: 4)   

...udy Plan (v.4) 12-12 edits.doc   download>
Description: System Assessment Study Plan
Type: Report
Status: DRAFT
Contact: Marv Landauer   contact via email>

 

Report

12/11/2007 System Assessment Study Plan (v 3) 11.20.07 edits (v: 3)   

...udy Plan (v 3) 11-20 edits.pdf   download>
Description: System Assessment Study Plan 11-20-07 edits
Type: Report
Status: DRAFT
Contact: Marv Landauer   contact via email>

 

Report

12/07/2007 Upcoming ColumbiaGrid Studies (12.7.07) (v: 2 )   

...lumbiaGrid Studies 12-7-07.pdf   download>
Description: Upcoming ColumbiaGrid Studies 12-7-07 draft
Type: Report
Status: DRAFT
Contact: Marv Landauer   contact via email>

 

Report

11/28/2007 Draft Study Plan (12.04.07) (v: 2)   

...Draft_Study_Plan_version_2.pdf   download>
Description: Draft Study Plan v.2
Type: Report
Status: DRAFT
Contact: Dean Perry   contact via email>

 

Report

11/19/2007 PSASG Update Report (Final 11.16.07) (v: final)   

...Report_2007 Nov 16 _Final_.pdf   download>
Description: PSASG Update Report November 16, 2007 (Final)
Type: Report
Status: FINAL
Contact: Dean Perry   contact via email>

 

Report

11/19/2007 System Assessment Study Plan (11-15-07) (v: 1)   

...sment Proposal 11-15 edits.pdf   download>
Description: System Assessment Study Plan 11-15
Type: Report
Status: DRAFT
Contact: Marv Landauer   contact via email>

 

Report

11/14/2007 Regional Projects with Impacts on ColGrid Facilities (v: 3)   

...olumbiaGrid Facilities (3).pdf   download>
Description: This list and analysis was developed from information available to ColumbiaGrid as of Oct 2007
Type: Report
Status: FINAL
Contact: Marv Landauer   contact via email>

 

Report

11/06/2007 System Assessment Proposal (10.16.07 edits) (v: 2)   

...t Proposal 10-16 edits (2).pdf   download>
Description: System Assessment Proposal 10-16-07 edits
Type: Report
Status: DRAFT
Contact: Marv Landauer   contact via email>

 

Report

10/16/2007 Draft PSASG Update Report (v: zipped)   

...ate Report_11 Oct 2007.zap.zip   download>
Description: Draft PSASG Update Report zipped (for ease of viewing and printing)
Type: Report
Status: FINAL

 

Report

10/12/2007 Draft PSASG Update Report (v: 1)   

..._Update_Report_2007_Oct_11.pdf   download>
Description: Draft update to the 2004 Puget Sound Area Study Group Report: Assessment of Puget Sound Area/Northern Intertie Curtailment Risk
Type: Report
Status: FINAL
Contact: Dean Perry   contact via email>

 

Report

10/05/2007 Report Outlines (v: 1)   

Report Outlines.doc   download>
Description: System Assessment Report Outline
Type: Report
Status: FINAL
Contact: Marv Landauer   contact via email>

 

Report

10/05/2007 System Assessment Proposal (v: 1)   

... Study Plan 9-26 edits v.1.doc   download>
Description: System Assessment Proposal
Type: Report
Status: DRAFT
Contact: Marv Landauer   contact via email>

 

Report

09/24/2007 Draft PSASG Update Report (v: 1)   

...G_Update_Report_2007-09-19.pdf   download>
Description: Draft PSASG Update Report, PSAST 9-24-2007 Mtg - Dobson-Mack
Type: Report
Status: DRAFT
Contact: Dean Perry   contact via email>

 

Report

09/24/2007 PSASG Project Update Report (v: 1)   

... P. - PSASG_Project_Update.ppt   download>
Description: Puget Sound Area Projects Update - PSAST 9-24-2007 Agenda Item 3 - Phillips
Type: Report
Status: FINAL
Contact: Dean Perry   contact via email>

 

Report

09/05/2007 General Planning Areas Description (v: 1)   

...Planning Areas Description.pdf   download>
Description: General Planning Areas Description
Type: Report
Status: FINAL
Contact: Marv Landauer   contact via email>

 

Spreadsheet

10/31/2008 ColGrid 2008 Transmission Plan (10.30.08) (v: 1)   

...ransmissionPlan(10.30.08)1.xls   download>
Description: ColGrid 2008 Transmission Plan (10.30.08)
Type: Spreadsheet
Status: DRAFT
Open for Comment    submit comment >
Contact: Marv Landauer   contact via email>

 

Spreadsheet

09/15/2008 CG 2008 Transmission Plan Combined Changes (v: 1)   

...ion Plan(8 29 08)_combined.pdf   download>
Description: CG 2008 Transmission Plan with combined comments
Type: Spreadsheet
Status: DRAFT
Contact: Marv Landauer   contact via email>

 

Spreadsheet

08/12/2008 MT to ColGrid Study Request Coordination (08.14.08) (v: 1)   

...Coordination SAW edits (2).pdf   download>
Description: MT to ColGrid Study Request Coordination
Type: Spreadsheet
Status: FINAL

 

Spreadsheet

08/07/2008 2008 Transmission Plan Template (v: 1)   

...ission Plan template (v.1).pdf   download>
Description: 2008 Transmission Plan Template
Type: Spreadsheet
Status: DRAFT
Contact: Marv Landauer   contact via email>

 

Spreadsheet

05/21/2008 IP Impact (5.21.08) (v: 1)   

IP_Impact.pdf   download>
Type: Spreadsheet
Status: FINAL
Contact: Marv Landauer   contact via email>

 

Spreadsheet

05/20/2008 TCRM Data Structure (v: 1)   

TCRM Data Structure.xls   download>
Description: TCRM Data Structure
Type: Spreadsheet
Status: DRAFT
Contact: Marv Landauer   contact via email>

 

Spreadsheet

05/19/2008 NI Nomogram Analysis (v: 1)   

NI Nomogram Analysis.pdf   download>
Description: NI Nomogram Analysis
Type: Spreadsheet
Status: FINAL

 

Spreadsheet

05/14/2008 BCTC System Operating Order 7T -64 (v: 1)   

SOO7T-64_12jul07.pdf   download>
Description: BCTC System Operating Order 7T -64 12jul07
Type: Spreadsheet
Status: FINAL
Contact: Jeffrey C. Miller, P.E.   contact via email>

 

Spreadsheet

05/14/2008 Summer 07 Nomograms for NI-Heavy Load (v: 1)   

...(100) All Lines In Service.pdf   download>
Description: Summer Nomograms for NI for Ingledow-Custer, heavy load
Type: Spreadsheet
Status: FINAL
Contact: Jeffrey C. Miller, P.E.   contact via email>

 

Spreadsheet

05/14/2008 Winter 08 Nomograms for NI Light Load (v: 1)   

...of 436Winter08_SNL_results.pdf   download>
Description: Winter Nomograms for NI Ingledow-Custer, Light Load
Type: Spreadsheet
Status: FINAL
Contact: Jeffrey C. Miller, P.E.   contact via email>

 

Spreadsheet

05/14/2008 Summer 07 Nomograms for NI-Light Load (v: 1)   

...(100) All Lines In Service.pdf   download>
Description: Summer 07 Nomograms for NI-Ingledow-Custer, Light Load
Type: Spreadsheet
Status: FINAL
Contact: Jeffrey C. Miller, P.E.   contact via email>

 

Spreadsheet

05/13/2008 Winter 08 Nomograms for NI-Heavy Load (v: 1)   

...of 436Winter08_SNH_results.PDF   download>
Description: Winter 08 Nomograms for NI-Ingledow-Custer, Heavy Load
Type: Spreadsheet
Status: FINAL
Contact: Jeffrey C. Miller, P.E.   contact via email>

 

Spreadsheet

04/04/2008 CG 2018 EHW Contingencies Consolidated_Comments (v: 7)   

request access >  login >
Description: CG 2018 EHW Contingencies Consolidated Comments
Type: Spreadsheet
Status: DRAFT
Contact: Jonathan Young   contact via email>

 

Spreadsheet

04/04/2008 CG 2018 HS Contingencies Consolidated Comments (v: 3)   

request access >  login >
Description: CG 2018 HS Contingencies Consolidated Comments
Type: Spreadsheet
Status: DRAFT
Contact: Jonathan Young   contact via email>

 

Spreadsheet

04/04/2008 CG 2018 HW Contingencies Consolidated_Comments (v: 12)   

request access >  login >
Description: CG 2018 HW Contingencies Consolidated Comments
Type: Spreadsheet
Status: DRAFT
Contact: Jonathan Young   contact via email>

 

Spreadsheet

03/04/2008 CG 2018 HS Contingencies-AVA-Sno-Grant-BPA (v: 1)   

request access >  login >
Description: CG 2018 HS Contingencies AVA-Sno-Grant-BPA
Type: Spreadsheet
Status: DRAFT
Contact: Marv Landauer   contact via email>

 

Spreadsheet

02/26/2008 CG 2018 HW Contingencies (v: 10)   

request access >  login >
Description: CG 2018 HW Contingencies with comments
Type: Spreadsheet
Status: DRAFT
Contact: Marv Landauer   contact via email>

 

Spreadsheet

02/26/2008 CG 2018 EHW Contingencies (v: 5)   

request access >  login >
Description: CG 2018 EHW Contingencies with comments
Type: Spreadsheet
Status: DRAFT
Contact: Marv Landauer   contact via email>

 

Spreadsheet

02/13/2008 CG 2018 EHW Contingency Results (v: (4))   

request access >  login >
Description: This spreadsheet contains all violations from N-1 and common mode outages run against the CG 2018 EHW PowerWorld case. Each utility is expected to review these violations and provide comments.
Type: Spreadsheet
Status: DRAFT
Contact: Gordon Comegys   contact via email>

 

Spreadsheet

02/11/2008 CG 2018 HS Contingencies (v: 1)   

request access >  login >
Description: This spreadsheet contains all violations from N-1 and common mode outages run against the CG 2018 HS PowerWorld case. Each utility is expected to review these violations and provide comments.
Type: Spreadsheet
Status: DRAFT
Contact: Marv Landauer   contact via email>

 

Spreadsheet

02/08/2008 CG 2018 HW Contingencies (v: 9)   

request access >  login >
Description: This spreadsheet contains all violations from N-1 and common mode outages run against the CG 2018 HW PowerWorld case. Each utility is expected to review these violations and provide comments.
Type: Spreadsheet
Status: DRAFT
Contact: Gordon Comegys   contact via email>

 

Spreadsheet

01/15/2008 CG 2018 HW Unsolved Contingencies by Area (v: 1)   

request access >  login >
Description: This spreadsheet contains a list of all unsolved contingencies for the CG 2018 HW case. These contingencies are listed on separate tabs for each area.
Type: Spreadsheet
Status: DRAFT
Contact: Gordon Comegys   contact via email>

 

Spreadsheet

12/12/2007 Tieline Flows (12.12.07) (v: 1)   

Tieline Flows (12.12.07).xls   download>
Description: Tieline Flows
Type: Spreadsheet
Status: DRAFT
Contact: Marv Landauer   contact via email>

 

Spreadsheet

12/12/2007 NW Gen Summary (12.12.07) (v: 1)   

NW Gen Summary (12.12.07).xls   download>
Description: NW Generation Summary - Participation Groups
Type: Spreadsheet
Status: DRAFT
Contact: Marv Landauer   contact via email>

 

Spreadsheet

12/12/2007 Contingency Results Comparions Summary (12.12.07) (v: 1)   

...parions Summary (12.12.07).xls   download>
Description: Contingency Results Comparions Summary
Type: Spreadsheet
Status: DRAFT
Contact: Marv Landauer   contact via email>

 

Spreadsheet

12/11/2007 120407 Winter_2008_Nomo_Analysis (v: 1)   

... Winter_2008_Nomo_Analysis.zip   download>
Description: Winter 2008 Nomogram Analysis for TRCM Discussion
Type: Spreadsheet
Status: FINAL
Contact: Dean Perry   contact via email>

 

Spreadsheet

11/19/2007 Upcoming ColumbiaGrid Studies (v: 1)   

...oming ColumbiaGrid Studies.pdf   download>
Description: Upcoming ColumbiaGrid Studies
Type: Spreadsheet
Status: FINAL
Contact: Marv Landauer   contact via email>

 

Spreadsheet

11/06/2007 Base Case Load Levels (v: 1)   

basecase load levels.pdf   download>
Description: Base Case Load Levels
Type: Spreadsheet
Status: FINAL
Contact: Marv Landauer   contact via email>

 

Spreadsheet

10/04/2007 ColumbiaGrid Initial Transmission Plan (10.04.07) (v: 2)   

...ssion Plan 10-4-2007 (v.2).xls   download>
Description: Regional projects with a high level assessment of their impact to ColumbiaGrid facilities are summarized in (link). This summary includes projects proposed by others that might have impact on ColumbiaGrid facilities. This list was collected by ColumbiaGrid from available information. Comments are welcome.
Type: Spreadsheet
Status: DRAFT
Contact: Marv Landauer   contact via email>

 

Document (pdf)

08/07/2008 Single System Projects (v: 1)   

SingleSystemProjects.pdf   download>
Description: Single System Projects
Type: Document (pdf)
Status: DRAFT
Contact: Marv Landauer   contact via email>

 

Document (pdf)

08/04/2008 ColumbiaGrid Contingency Naming Standard (v: 1)   

CGNamingStandard.pdf   download>
Description: ColumbiaGrid Contingency Naming Standard
Type: Document (pdf)
Status: DRAFT
Contact: Gordon Comegys   contact via email>

 

Document (pdf)

05/21/2008 Mid-C Study Plan (v: 1)   

Mid-C_Study Plan.pdf   download>
Description: Mid-C Study Plan
Type: Document (pdf)
Status: DRAFT
Contact: Marv Landauer   contact via email>

 

Document (pdf)

05/21/2008 Action Items from April 2008 Mtg (v: 1)   

ActionItems22April2008.pdf   download>
Description: Action Items fron April 22, 2008 Meeting
Type: Document (pdf)
Status: DRAFT
Contact: Marv Landauer   contact via email>

 

Document (pdf)

05/20/2008 DCPUD_T-Line Overview (v: 1)   

DCPUD_T-Line Overview.pdf   download>
Description: DCPUD_T-Line Overview
Type: Document (pdf)
Status: DRAFT
Contact: Marv Landauer   contact via email>

 

Document (pdf)

05/15/2008 Draft PSAST TCRA Study Plan V6 (v: draft)   

...t PSAST TCRA Study Plan V6.pdf   download>
Description: Draft PSAST TCRA Study Plan version 6
Type: Document (pdf)
Status: DRAFT
Contact: Jeffrey C. Miller, P.E.   contact via email>

 

Document (pdf)

05/09/2008 Path 3 Phase 1 Study Plan 23apr08 (2) (v: draft)   

...e 1 study plan 23apr08 (2).pdf   download>
Description: Path 3 Phase 1 Study Plan 23apr08 (2)
Type: Document (pdf)
Status: DRAFT
Contact: Jeffrey C. Miller, P.E.   contact via email>

 

Document (pdf)

05/02/2008 System Assessment Report Needs Statement 2008 (5.02.08) (v: 2)   

request access >  login >
Description: System Assessment Report Needs Statement 2008 - Attachment H
Type: Document (pdf)
Status: DRAFT
Contact: Marv Landauer   contact via email>

 

Document (pdf)

04/28/2008 Study Plans for Sensitivity Studies (v: 1)   

SensitivityStudyPlans.pdf   download>
Description: Study Plans for Sensitivity Studies
Type: Document (pdf)
Status: DRAFT
Contact: Marv Landauer   contact via email>

 

Document (pdf)

04/17/2008 Mid C Needs Statement from System Assessmentt (v: 1)   

request access >  login >
Description: Mid-Columbia Needs Statement from 2008 System Assessment
Type: Document (pdf)
Status: DRAFT
Contact: Marv Landauer   contact via email>

 

Document (pdf)

04/17/2008 North of Wanapum/Vantage Kickoff (v: 1)   

NorthWanVant_kickoff.pdf   download>
Description: North of Wanapum/Vantage 230 kV Studies from BPA/Chelan/Grant Meeting - October 3, 2007
Type: Document (pdf)
Status: DRAFT
Contact: Marv Landauer   contact via email>

 

Document (pdf)

03/03/2008 Report Schedule (v: 1)   

Report Schedule.pdf   download>
Description: Report Schedule
Type: Document (pdf)
Status: DRAFT
Contact: Marv Landauer   contact via email>