Study Team: System Assessment

System Assessment Documents

Order By Type  |  Order By Date

05/01/2012 2012 System Assessment Cases epc format (v: 1)   

request access >  login >
Description: 2012 System Assessment Cases in GE PSLF EPC Format
Type: Base Case
Status: DRAFT
Contact: Area Coordinator   contact via email>

 

05/01/2012 2012 System Assessment Cases (with contingency results) (v: 5_1)   

request access >  login >
Description: 2012 System Assessment base cases saved in a .zip file in pwb format with contingency results
Type: Base Case
Status: DRAFT
Contact: Area Coordinator   contact via email>

 

04/30/2012 2012 System Assessment Contingency Results (v: 4_30)   

request access >  login >
Description: Branch violations
Type: Spreadsheet
Status: DRAFT
Contact: Area Coordinator   contact via email>

 

03/14/2012 Transmission Projects in Base Cases (v: 2)   

TxProjinbasecases.pdf   download>
Description: Transmission Projects in Base Cases
Type: Spreadsheet
Status: DRAFT
Contact: Marv Landauer, P.E.   contact via email>

 

02/23/2012 17HS1A_System Assessment Case (v: 1)   

request access >  login >
Description: Initial 2017 Heavy Summer Case for the 2012 System Assessment in PowerWorld binary format. Saved in a .zip file.
Type: Base Case
Status: DRAFT
Contact: Amy Johnson   contact via email>

 

02/23/2012 ColumbiaGrid Contingency Naming Convention (v: 2)   

...tingency Naming Convention.doc   download>
Description: ColumbiaGrid naming convention for PowerWorld contingencies.
Type:
Status: FINAL
Contact: Area Coordinator   contact via email>

 

01/20/2012 2011 System Assessment Unsolved Outages (v: 1)   

request access >  login >
Description: 2011 System Assessment Unsolved Outages Summary
Type: Spreadsheet
Status: DRAFT
Contact: Amy Johnson   contact via email>

 

12/27/2011 Custer Bus Sensitivity Results (v: 1)   

request access >  login >
Description: Custer Bus Sensitivity Results
Type: Spreadsheet
Status: DRAFT
Contact: Jonathan Young   contact via email>

 

12/27/2011 Custer Bus Split Results (Presentation) (v: 1)   

request access >  login >
Description: Custer Bus Split Results
Type: Presentation
Status: DRAFT
Contact: Jonathan Young   contact via email>

 

12/27/2011 500/230 kV N-1-1 Results (12.20.11) (v: 1)   

request access >  login >
Description: 500/230 kV N-1-1 Results (12.20.11)
Type: Spreadsheet
Status: DRAFT
Contact: Jonathan Young   contact via email>

 

08/04/2011 2011 System Assessment Light Load Sensitivity Study (v: 1)   

request access >  login >
Type: Base Case
Status: DRAFT
Contact: Gordon Comegys, P.E.   contact via email>

 

07/08/2011 2011 System Assessment (10MB file) (v: 1)   

2011SAsmall.pdf   download>
Description: System Assessment 2011
Type: Report
Status: FINAL
Contact: Marv Landauer, P.E.   contact via email>

 

05/31/2011 Planning Agenda 6.2.2011 (v: 1)   

raftPlanningAgenda(6-2-11).pdf   download>
Description: Planning Agenda 6.2.2011
Type: Agenda
Status: DRAFT
Contact: Marv Landauer, P.E.   contact via email>

 

05/25/2011 2011 System Assessment Results (19.5 MB .xls file) (v: 5_18)   

request access >  login >
Description: 2011 System Assessment contingency violations in spreadsheet format
Type: Spreadsheet
Status: FINAL
Contact: Area Coordinator   contact via email>

 

05/25/2011 2011 System Assessment Cases (23 MB .zip file) (v: 5_18)   

request access >  login >
Type: Base Case
Status: FINAL
Contact: Area Coordinator   contact via email>

 

05/05/2011 ColumbiaGrid 2012 Transmission Plan Draft (v: 1)   

...012TransmissionPlanDraft1.xlsx   download>
Description: ColumbiaGrid 2012 Transmission Plan Draft
Type: Spreadsheet
Status: DRAFT
Contact: Marv Landauer, P.E.   contact via email>

 

05/05/2011 CG Planning Meeting 5.5.2011 Presentation (v: 1)   

CGPlgMtg5-5-11.pdf   download>
Type: Presentation
Status: DRAFT
Contact: Marv Landauer, P.E.   contact via email>

 

05/05/2011 Updated PSAST Transmission Expansion Plan Results (presentation) (v: 1)   

...TTransExpPlanResults5-4-11.pdf   download>
Description: Updated PSAST Transmission Expansion Plan Results (presentation)
Type: Presentation
Status: DRAFT
Contact: Jonathan Young   contact via email>

 

05/04/2011 WECC New Transmission (v: 1)   

WECCNewTransmission.docx   download>
Description: WECC New Transmission
Type: Report
Status: DRAFT

 

05/04/2011 Table 1 CG 10 Year Plan (v: 1)   

Table1CG10YearPlan.xlsx   download>
Description: Table 1 CG 10 Year Plan
Type: Spreadsheet
Status: DRAFT
Contact: Marv Landauer, P.E.   contact via email>

 

04/25/2011 2010 Transmission Issues (v: 2)   

request access >  login >
Description: 2010 Transmission Issues
Type: Report
Status: DRAFT
Contact: Marv Landauer, P.E.   contact via email>

 

11/03/2010 Puget Sound Generation Levels (v: 1)   

PugetSoundGenerationLevels.pdf   download>
Description: Puget Sound Generation Levels
Type: Presentation
Status: DRAFT
Contact: Amy Johnson   contact via email>

 

11/03/2010 Draft Planning Agenda (10.19.10) (v: 3)   

...ftPlanningAgenda(11-4-10)1.pdf   download>
Description: Draft Planning Agenda (10.19.10)
Type: Agenda
Status: DRAFT
Contact: Marv Landauer, P.E.   contact via email>

 

06/25/2010 Action Items from 6.24.10 (v: 1)   

ctionItemsfrom6-24-10CGPM.docx   download>
Description: Action Items from 6.24.10
Type: Minutes
Status: DRAFT
Contact: Marv Landauer, P.E.   contact via email>

 

06/22/2010 Morgan Lewis - Energy LF FERC Proposed Rule on Transmission Planning & Cost Allocation (v: 1)   

...issionPlanning_18jun10 (2).pdf   download>
Description: Morgan Lewis - Energy LF FERC Proposed Rule on Transmission Planning & Cost Allocation
Type: Letter
Status: DRAFT

 

06/22/2010 Draft SCG Committed Potential Map (v: 1)   

...mmitted_PotentialMap-ver41.pdf   download>
Description: Draft SCG Committed Potential Map
Type: Map
Status: DRAFT

 

06/22/2010 Footnote B (v: 1)   

Footnoteb.pdf   download>
Description: Footnote B
Type: Document (pdf)
Status: DRAFT
Contact: Marv Landauer, P.E.   contact via email>

 

04/30/2010 Test 2010 CG System Assessment Cases (21 MB compressed file) (v: 1)   

request access >  login >
Description: 21 MB compressed file containing the test cases for the 2010 system assessment
Type: Base Case
Status: DRAFT
Contact: Gordon Comegys, P.E.   contact via email>

 

04/22/2010 Action Items from 4.20.10 Planning Mtg (v: 1)   

ActionItemsfrom4-20-10.pdf   download>
Description: Action Items from 4.20.10 Planning Mtg
Type: Notes
Status: DRAFT
Contact: Marv Landauer, P.E.   contact via email>

 

04/21/2010 Test of 2010 System Assessment 10 Year Cases (Zipped File) (v: 1)   

request access >  login >
Description: Test of 2010 System Assessment 10 Year Cases (Zipped File)
Type: PowerWorld Auxiliary File
Status: DRAFT
Contact: Gordon Comegys, P.E.   contact via email>

 

03/18/2010 Action Items (3.2.10) (v: 1)   

ActionItemsfrom3-2-10CGPM.pdf   download>
Description: Action Items (3.2.10)
Type: Minutes
Status: DRAFT
Contact: Marv Landauer, P.E.   contact via email>

 

02/26/2010 SPSC Miller Presentation - SCG (1.29.10) (v: 1)   

...rPresentationonSCG-1-29-10.pdf   download>
Description: SPSC Miller Presentation - SCG (1.29.10)
Type: Presentation
Status: DRAFT
Contact: Jeffrey C. Miller, P.E.   contact via email>

 

02/26/2010 Puget Sound Reinforcements (2.17.10) (v: 1)   

...SoundReinforcements2-17-10.pdf   download>
Description: Puget Sound Reinforcements (2.17.10)
Type: Presentation
Status: DRAFT
Contact: Jeffrey C. Miller, P.E.   contact via email>

 

01/27/2010 Draft Action Items from 1.26.10 (v: 1)   

ActionItemsfrom1-26-10CGPM.pdf   download>
Description: Draft Action Items from 1.26.10
Type: Minutes
Status: DRAFT
Contact: Marv Landauer, P.E.   contact via email>

 

01/27/2010 Draft Planning Agenda (v: 1)   

raftPlanningAgenda(3-2-10).pdf   download>
Description: Draft Planning Agenda
Type: Agenda
Status: DRAFT
Contact: Marv Landauer, P.E.   contact via email>

 

12/11/2009 Action Items 12.9.09 (v: 1)   

ActionItemsfrom12-9-09CGPM.pdf   download>
Description: Action Items 12.9.09
Type: Minutes
Status: DRAFT
Contact: Marv Landauer, P.E.   contact via email>

 

09/21/2009 Summer Wind Overload Comparison (v: 1)   

request access >  login >
Description: Summer Wind Overload Comparison
Type: Spreadsheet
Status: DRAFT
Contact: Gordon Comegys, P.E.   contact via email>

 

09/21/2009 Narrative of Wind Generation Sensitivity Study with New 10 Year Cases (v: 1)   

request access >  login >
Description: Narrative of Wind Generation Sensitivity Study with New 10 Year Cases
Type: Report
Status: DRAFT
Contact: Gordon Comegys, P.E.   contact via email>

 

09/21/2009 Narrative of 10 Year System Assessment Update Methodology (v: 1)   

request access >  login >
Description: Narrative of 10 Year System Assessment
Type: Report
Status: DRAFT
Contact: Gordon Comegys, P.E.   contact via email>

 

08/06/2009 Trojan-Horizon Presentation (v: 1)   

...orizonPresentation(8-6-09).pdf   download>
Description: Trojan-Horizon Presentation
Type: Presentation
Status: DRAFT

 

08/05/2009 NOS Update (v: 1)   

...anningMtgNOSUpdate(8.6.09).pdf   download>
Description: NOS Update
Type: Presentation
Status: DRAFT

 

08/05/2009 System Assessment Presentation (v: 1)   

...ssmentPresentation(8.6.09).pdf   download>
Description: System Assessment Presentation
Type: Presentation
Status: DRAFT
Contact: Marv Landauer, P.E.   contact via email>

 

08/03/2009 Planning Meeting Draft Agenda (v: 1)   

PlanningAgenda(8.6.09).pdf   download>
Description: Planning Meeting Draft Agenda
Type: Agenda
Status: DRAFT
Contact: Marv Landauer, P.E.   contact via email>

 

06/11/2009 Planning Assumptions (June 10, 2009) (v: 1)   

...ssumptions for 10Jun09 Mtg.doc   download>
Description: Planning Assumptions (June 10, 2009)
Type: Document (pdf)
Status: DRAFT
Contact: Gordon Comegys, P.E.   contact via email>

 

06/10/2009 Basecase/Wind Diagrams (v: 1)   

basecasediagrams.pdf   download>
Description: Basecase/Wind Diagrams
Type: Presentation
Status: DRAFT
Contact: Tammy Beckwith   contact via email>

 

05/13/2009 Contingency Analysis Summary (5.11.09) (v: 2)   

request access >  login >
Description: Contingency Analysis Summary
Type: Spreadsheet
Status: DRAFT
Contact: Gordon Comegys, P.E.   contact via email>

 

05/07/2009 Contingency Aux Files - Optional Download (v: 2: Aux files to modify WECC cases and contingency definitions)   

request access >  login >
Description: Contingency Aux Files
Type: PowerWorld Auxiliary File
Status: DRAFT
Contact: Gordon Comegys, P.E.   contact via email>

 

05/07/2009 2006 Wind Correlation Profiles (v: 1)   

2006WindProfiles.pdf   download>
Description: 2006 Wind Correlation
Type: Spreadsheet
Status: DRAFT
Contact: Marv Landauer, P.E.   contact via email>

 

05/07/2009 Results Template (v: 1)   

ResultsTemplate.pdf   download>
Description: Results Template
Type: Spreadsheet
Status: DRAFT
Contact: Marv Landauer, P.E.   contact via email>

 

05/07/2009 NTTG Study Matrix (v: 1)   

TTGStudyMatrix(2009-05-07).pdf   download>
Description: NTTG Study Matrix
Type: Document (pdf)
Status: DRAFT

 

05/07/2009 Requested Service Projects (v: 1)   

...tedServiceProjects(5-7-09).pdf   download>
Description: Requested Service Projects
Type: Presentation
Status: DRAFT
Contact: Jeffrey C. Miller, P.E.   contact via email>

 

05/07/2009 DHM to WECC Board (04.29.09) fin (2) (v: 1)   

...-WECCBoard(04.29.09)fin(2).pdf   download>
Description: DHM to WECC Board (04.29.09) fin (2)
Type:
Status: DRAFT

 

05/07/2009 Excerpts from the NWPCC Load Forecast (v: 1)   

...ptsNWPCCLoadForecast(5-09).pdf   download>
Description: Excerpts from the NWPCC Load Forecast
Type: Presentation
Status: DRAFT

 

05/06/2009 I5 CG Update (v: 1)   

I5_CG_Update_5_09.pdf   download>
Description: I5 CG Update
Type: Presentation
Status: DRAFT

 

04/08/2009 Action Items from Planning Mtg 3.30.09 (v: 1)   

  risk of use agreement required >>
Description: Action Items from Planning Mtg 3.30.09
Type: Document (pdf)
Status: DRAFT
Contact: Marv Landauer, P.E.   contact via email>

 

04/07/2009 Planning Meeting Agenda (Draft) (v: 1)   

PlanningAgenda(5.7.09).pdf   download>
Description: Planning Meeting Agenda (Draft)
Type: Agenda
Status: DRAFT
Contact: Marv Landauer, P.E.   contact via email>

 

03/30/2009 TEPPC Regional Planning White Paper (v: 1)   

...regionalplanningwhitepaper.pdf   download>
Description: TEPPC regional planning white paper
Type: Report
Status: DRAFT

 

03/24/2009 Old Version 13: PowerWorldBaseCasesCGmodified13HS1-14HW1-OldVersion13.zip (v: 1; (in Old Version 13) Supporting data for contingency analysis results.)   

request access >  login >
Description: PowerWorldBaseCasesCGmodified13HS1-14HW1-OldVersion13.zip
Type: PowerWorld Auxiliary File
Status: DRAFT
Contact: Gordon Comegys, P.E.   contact via email>

 

03/24/2009 13HS1CG-ContingencyResults.xls (v: 1; Contingency analysis results for 2013 Summer)   

request access >  login >
Description: 13HS1CG-ContingencyResults.xls
Type: Spreadsheet
Status: DRAFT
Contact: Gordon Comegys, P.E.   contact via email>

 

03/24/2009 14HW1CG-ContingencyResults.xls (v: 1; Contingency analysis results for 2013-2014 Winter)   

request access >  login >
Description: 14HW1CG-ContingencyResults.xls
Type: Spreadsheet
Status: DRAFT
Contact: Gordon Comegys, P.E.   contact via email>

 

03/23/2009 Action Items from 2.25.09 Mtg (v: 1)   

ActionItemsfrom2-25-09CGPM.pdf   download>
Description: Action Items from 2.25.09 Mtg
Type: Notes
Status: DRAFT
Contact: Marv Landauer, P.E.   contact via email>

 

03/23/2009 Draft Planning Agenda (3.31.09) (v: 1)   

PlanningAgenda(3-31-09).pdf   download>
Description: Draft Planning Agenda (3.31.09)
Type: Agenda
Status: DRAFT
Contact: Marv Landauer, P.E.   contact via email>

 

02/26/2009 14HW1CG & 13HS1CG Contingency Analysis Meeting (v: 1)   

14HW1CG.doc   download>
Description: 14HW1CG & 13HS1CG Contingency Analysis Meeting
Type: Agenda
Status: DRAFT
Contact: Gordon Comegys, P.E.   contact via email>

 

02/26/2009 14hw1CG-13HS1CG-Contingency Results 2.25.09 (v: 1)   

request access >  login >
Description: 14hw1CG-13HS1CG-Contingency Results 2.25.09
Type: PowerWorld Auxiliary File
Status: DRAFT
Contact: Gordon Comegys, P.E.   contact via email>

 

02/26/2009 Case Development Supporting Data (v: 1)   

request access >  login >
Description: Case Development Supporting Data
Type: PowerWorld Auxiliary File
Status: DRAFT
Contact: Gordon Comegys, P.E.   contact via email>

 

02/23/2009 Agenda Item 13d - EAC Report on Keeping the Lights On (v: 1)   

EACReport-KeepingLightson.pdf   download>
Description: Agenda Item 13d - EAC Report on Keeping the Lights On
Type: Report
Status: DRAFT

 

02/23/2009 Agenda Item 13b - Draft comments from WECC Seminar on Long Term Planning (v: 1)   

...tsWECCSeminar-LongTermPlan.doc   download>
Description: Agenda Item 13b - Draft comments from WECC Seminar on Long Term Planning
Type: Comments
Status: DRAFT

 

02/23/2009 Agenda Item 13a - WREZ Transmission Segment Map (v: 1)   

WREZTransSegmentMap.ppt   download>
Description: Agenda Item 13a - WREZ Transmission Segment Map
Type: Presentation
Status: DRAFT

 

02/23/2009 Agenda Item 13a - WREZ Transmission Assumptions (v: 1)   

WREZTransAssumptions.ppt   download>
Description: Agenda Item 13a - WREZ Transmission Assumptions
Type: Presentation
Status: DRAFT

 

02/23/2009 Agenda Item 13c - Green Power Superhighways Report (v: 1)   

GreenPowerSuperhwysRept.pdf   download>
Description: Agenda Item 13c - Green Power Superhighways Report
Type: Report
Status: DRAFT

 

01/30/2009 ContingencyAnalysisAuxFiles (v: 1)   

request access >  login >
Description: ContingencyAnalysisAuxFiles
Type: Base Case
Status: DRAFT
Contact: Gordon Comegys, P.E.   contact via email>

 

01/30/2009 14hw1a-Contingency Results-case-without-corrections (v: 1)   

request access >  login >
Description: 14hw1a-Contingency Results-case-without-corrections
Type: Base Case
Status: DRAFT
Contact: Gordon Comegys, P.E.   contact via email>

 

05/02/2008 System Assessment Report Needs Statement 2008 (5.02.08) (v: 2)   

request access >  login >
Description: System Assessment Report Needs Statement 2008 - Attachment H
Type: Document (pdf)
Status: DRAFT
Contact: Marv Landauer, P.E.   contact via email>

 

04/28/2008 Draft Agenda (v: 1)   

Draft Agenda.pdf   download>
Description: Draft Agenda for April 30, 2008 Meeting
Type: Agenda
Status: DRAFT
Contact: Marv Landauer, P.E.   contact via email>

 

04/24/2008 500 kV System PowerWorld OneLine (v: 2)   

request access >  login >
Description: PowerWorld version 13 oneline diagram (.pwd). This diagram was developed by BPA, and minor adjustments were made for compatibility with the ColumbiaGrid planning cases.
Type: Map
Status: DRAFT
Contact: Amy Johnson   contact via email>

 

04/15/2008 Planning Report for Board 4.16.08 (v: 1)   

PlanningReport(04.16.08).pdf   download>
Description: Planning report includes system assessment report
Type: Presentation
Status: DRAFT
Contact: Jeffrey C. Miller, P.E.   contact via email>

 

04/04/2008 CG 2018 EHW Contingencies Consolidated_Comments (v: 7)   

request access >  login >
Description: CG 2018 EHW Contingencies Consolidated Comments
Type: Spreadsheet
Status: DRAFT
Contact: Jonathan Young   contact via email>

 

04/04/2008 CG 2018 HS Contingencies Consolidated Comments (v: 3)   

request access >  login >
Description: CG 2018 HS Contingencies Consolidated Comments
Type: Spreadsheet
Status: DRAFT
Contact: Jonathan Young   contact via email>

 

04/04/2008 CG 2018 HW Contingencies Consolidated_Comments (v: 12)   

request access >  login >
Description: CG 2018 HW Contingencies Consolidated Comments
Type: Spreadsheet
Status: DRAFT
Contact: Jonathan Young   contact via email>

 

03/04/2008 CG 2018 HS Contingencies-AVA-Sno-Grant-BPA (v: 1)   

request access >  login >
Description: CG 2018 HS Contingencies AVA-Sno-Grant-BPA
Type: Spreadsheet
Status: DRAFT
Contact: Marv Landauer, P.E.   contact via email>

 

02/26/2008 CG 2018 HW Contingencies (v: 10)   

request access >  login >
Description: CG 2018 HW Contingencies with comments
Type: Spreadsheet
Status: DRAFT
Contact: Marv Landauer, P.E.   contact via email>

 

02/26/2008 CG 2018 EHW Contingencies (v: 5)   

request access >  login >
Description: CG 2018 EHW Contingencies with comments
Type: Spreadsheet
Status: DRAFT
Contact: Marv Landauer, P.E.   contact via email>

 

02/13/2008 CG 2018 EHW Contingency Results (v: (4))   

request access >  login >
Description: This spreadsheet contains all violations from N-1 and common mode outages run against the CG 2018 EHW PowerWorld case. Each utility is expected to review these violations and provide comments.
Type: Spreadsheet
Status: DRAFT
Contact: Gordon Comegys, P.E.   contact via email>

 

02/11/2008 CG 2018 HS Contingencies (v: 1)   

request access >  login >
Description: This spreadsheet contains all violations from N-1 and common mode outages run against the CG 2018 HS PowerWorld case. Each utility is expected to review these violations and provide comments.
Type: Spreadsheet
Status: DRAFT
Contact: Marv Landauer, P.E.   contact via email>

 

02/08/2008 CG 2018 HW Contingencies (v: 9)   

request access >  login >
Description: This spreadsheet contains all violations from N-1 and common mode outages run against the CG 2018 HW PowerWorld case. Each utility is expected to review these violations and provide comments.
Type: Spreadsheet
Status: DRAFT
Contact: Gordon Comegys, P.E.   contact via email>

 

02/01/2008 2018 Heavy Summer PowerWorld Case (v: 9)   

request access >  login >
Description: ColumbiaGrid 2018 Heavy Summer Planning Case. Started from the WECC 15hs1sa base case.
Type: Base Case
Status: DRAFT
Contact: Amy Johnson   contact via email>

 

02/01/2008 2018 Heavy Summer GE Case (v: 9)   

request access >  login >
Description: ColumbiaGrid 2018 Heavy Summer Planning Case. Started from the WECC 15hs1sa base case. This file is a solved .sav file.
Type: Base Case
Status: DRAFT
Contact: Amy Johnson   contact via email>

 

02/01/2008 2018 Heavy Summer PTI Case (v: 9)   

request access >  login >
Description: ColumbiaGrid 2018 Heavy Summer Planning Case. Started from the WECC 15hs1sa base case.
Type: Base Case
Status: DRAFT
Contact: Amy Johnson   contact via email>

 

01/24/2008 2018 Extra Heavy Winter PowerWorld Case (v: 5)   

request access >  login >
Description: 2018 Extra Heavy Winter Planning Case. Developed from WECC 17hw1a case.
Type: Base Case
Status: DRAFT
Contact: Amy Johnson   contact via email>

 

01/24/2008 2018 Extra Heavy Winter GE Case (v: 5)   

request access >  login >
Description: 2018 Extra Heavy Winter Planning Case. Developed from WECC 17hw1a case. This file is a solved .sav file.
Type: Base Case
Status: DRAFT
Contact: Amy Johnson   contact via email>

 

01/24/2008 2018 Extra Heavy Winter PTI Case (v: 5)   

request access >  login >
Description: 2018 Extra Heavy Winter Planning Case. Developed from WECC 17hw1a case.
Type: Base Case
Status: DRAFT
Contact: Amy Johnson   contact via email>

 

01/24/2008 2018 Heavy Winter PowerWorld Case (v: 14)   

request access >  login >
Description: 2018 Heavy Winter Planning Case. Developed from WECC 2017HW1 case, with load and topology additions from ColumbiaGrid participants and PacifiCorp and Portland General Electric. A confidentiality agreement and password are required.
Type: Base Case
Status: FINAL
Contact: Amy Johnson   contact via email>

 

01/24/2008 2018 Heavy Winter GE Case (v: 14)   

request access >  login >
Description: 2018 Heavy Winter Planning Case. Developed from WECC 2017HW1 case, with load and topology additions from ColumbiaGrid participants and PacifiCorp and Portland General Electric. The PowerWorld version of the case was saved as an epc file to create this version. That epc file was then saved as a solved .sav file. A confidentiality agreement and password are required.
Type: Base Case
Status: FINAL
Contact: Amy Johnson   contact via email>

 

01/24/2008 2018 Heavy Winter PTI Case (v: 14)   

request access >  login >
Description: 2018 Heavy Winter Planning Case. Developed from WECC 2017HW1 case, with load and topology additions from ColumbiaGrid participants and PacifiCorp and Portland General Electric. The PowerWorld version of the case was saved as a PSS/E version 30 raw file to create this version. A confidentiality agreement and password are required.
Type: Base Case
Status: FINAL
Contact: Amy Johnson   contact via email>

 

01/17/2008 2018 Extra Heavy Winter PowerWorld Version 12 Case (v: 4)   

request access >  login >
Description: 2018 Extra Heavy Winter Planning Case. Developed from WECC 17hw1a case.
Type: Base Case
Status: DRAFT
Contact: Amy Johnson   contact via email>

 

01/17/2008 2018 Heavy Summer PowerWorld Version 12 Case (v: 6)   

request access >  login >
Description: ColumbiaGrid 2018 Heavy Summer Planning Case. Started from the WECC 15hs1sa base case.
Type: Base Case
Status: DRAFT
Contact: Amy Johnson   contact via email>

 

01/17/2008 2018 Heavy Winter PowerWorld Version 12 Case (v: 13)   

request access >  login >
Description: 2018 Heavy Winter Planning Case. Developed from WECC 2017HW1 case, with load and topology additions from ColumbiaGrid participants and PacifiCorp and Portland General Electric. This case was saved as a version 12 base case. A confidentiality agreement and password are required since this file is considered CEII.
Type: Base Case
Status: DRAFT
Contact: Amy Johnson   contact via email>

 

01/15/2008 CG 2018 HW Unsolved Contingencies by Area (v: 1)   

request access >  login >
Description: This spreadsheet contains a list of all unsolved contingencies for the CG 2018 HW case. These contingencies are listed on separate tabs for each area.
Type: Spreadsheet
Status: DRAFT
Contact: Gordon Comegys, P.E.   contact via email>

 

01/11/2008 CG 2018 EHW with Contingencies (v: 1)   

request access >  login >
Description: Zip file containing PowerWorld 2018 Heavy Winter version 13 case, with contingencies
Type: Base Case
Status: DRAFT
Contact: Gordon Comegys, P.E.   contact via email>

 

12/21/2007 CG 2018 HW with Contingencies (v: 1)   

request access >  login >
Description: Zip file containing PowerWorld 2018 Heavy Winter version 13 case, with contingencies.
Type: Base Case
Status: DRAFT
Contact: Gordon Comegys, P.E.   contact via email>