Study Team: System Assessment Report

System Assessment Report Documents

Order By Type  |  Order By Date

Agenda

04/28/2008 Draft Agenda (v: 1)   

Draft Agenda.pdf   download>
Description: Draft Agenda for April 30, 2008 Meeting
Type: Agenda
Status: DRAFT
Contact: Marv Landauer   contact via email>

 

Base Case

02/01/2008 2018 Heavy Summer PowerWorld Case (v: 9)   

request access >  login >
Description: ColumbiaGrid 2018 Heavy Summer Planning Case. Started from the WECC 15hs1sa base case.
Type: Base Case
Status: DRAFT
Contact: Amy Johnson   contact via email>

 

Base Case

02/01/2008 2018 Heavy Summer GE Case (v: 9)   

request access >  login >
Description: ColumbiaGrid 2018 Heavy Summer Planning Case. Started from the WECC 15hs1sa base case. This file is a solved .sav file.
Type: Base Case
Status: DRAFT
Contact: Amy Johnson   contact via email>

 

Base Case

02/01/2008 2018 Heavy Summer PTI Case (v: 9)   

request access >  login >
Description: ColumbiaGrid 2018 Heavy Summer Planning Case. Started from the WECC 15hs1sa base case.
Type: Base Case
Status: DRAFT
Contact: Amy Johnson   contact via email>

 

Base Case

01/24/2008 2018 Extra Heavy Winter PowerWorld Case (v: 5)   

request access >  login >
Description: 2018 Extra Heavy Winter Planning Case. Developed from WECC 17hw1a case.
Type: Base Case
Status: DRAFT
Contact: Amy Johnson   contact via email>

 

Base Case

01/24/2008 2018 Extra Heavy Winter GE Case (v: 5)   

request access >  login >
Description: 2018 Extra Heavy Winter Planning Case. Developed from WECC 17hw1a case. This file is a solved .sav file.
Type: Base Case
Status: DRAFT
Contact: Amy Johnson   contact via email>

 

Base Case

01/24/2008 2018 Extra Heavy Winter PTI Case (v: 5)   

request access >  login >
Description: 2018 Extra Heavy Winter Planning Case. Developed from WECC 17hw1a case.
Type: Base Case
Status: DRAFT
Contact: Amy Johnson   contact via email>

 

Base Case

01/24/2008 2018 Heavy Winter PowerWorld Case (v: 14)   

request access >  login >
Description: 2018 Heavy Winter Planning Case. Developed from WECC 2017HW1 case, with load and topology additions from ColumbiaGrid participants and PacifiCorp and Portland General Electric. A confidentiality agreement and password are required.
Type: Base Case
Status: FINAL
Contact: Amy Johnson   contact via email>

 

Base Case

01/24/2008 2018 Heavy Winter GE Case (v: 14)   

request access >  login >
Description: 2018 Heavy Winter Planning Case. Developed from WECC 2017HW1 case, with load and topology additions from ColumbiaGrid participants and PacifiCorp and Portland General Electric. The PowerWorld version of the case was saved as an epc file to create this version. That epc file was then saved as a solved .sav file. A confidentiality agreement and password are required.
Type: Base Case
Status: FINAL
Contact: Amy Johnson   contact via email>

 

Base Case

01/24/2008 2018 Heavy Winter PTI Case (v: 14)   

request access >  login >
Description: 2018 Heavy Winter Planning Case. Developed from WECC 2017HW1 case, with load and topology additions from ColumbiaGrid participants and PacifiCorp and Portland General Electric. The PowerWorld version of the case was saved as a PSS/E version 30 raw file to create this version. A confidentiality agreement and password are required.
Type: Base Case
Status: FINAL
Contact: Amy Johnson   contact via email>

 

Base Case

01/11/2008 CG 2018 EHW with Contingencies (v: 1)   

request access >  login >
Description: Zip file containing PowerWorld 2018 Heavy Winter version 13 case, with contingencies
Type: Base Case
Status: DRAFT
Contact: Gordon Comegys   contact via email>

 

Base Case

12/21/2007 CG 2018 HW with Contingencies (v: 1)   

request access >  login >
Description: Zip file containing PowerWorld 2018 Heavy Winter version 13 case, with contingencies.
Type: Base Case
Status: DRAFT
Contact: Gordon Comegys   contact via email>

 

Map

04/24/2008 500 kV System PowerWorld OneLine (v: 2)   

request access >  login >
Description: PowerWorld version 13 oneline diagram (.pwd). This diagram was developed by BPA, and minor adjustments were made for compatibility with the ColumbiaGrid planning cases.
Type: Map
Status: DRAFT
Contact: Amy Johnson   contact via email>

 

Presentation

04/15/2008 Planning Report for Board 4.16.08 (v: 1)   

PlanningReport(04.16.08).pdf   download>
Description: Planning report includes system assessment report
Type: Presentation
Status: DRAFT
Contact: Jeffrey C. Miller, P.E.   contact via email>

 

Report

05/06/2008 2008 System Assessment Report (v: 1)   

...ssessmentwebsmall(5.2.08)1.pdf   download>
Description: 2008 System Assessment Report
Type: Report
Status: FINAL
Contact: Jeffrey C. Miller, P.E.   contact via email>

 

Spreadsheet

04/04/2008 CG 2018 EHW Contingencies Consolidated_Comments (v: 7)   

request access >  login >
Description: CG 2018 EHW Contingencies Consolidated Comments
Type: Spreadsheet
Status: DRAFT
Contact: Jonathan Young   contact via email>

 

Spreadsheet

04/04/2008 CG 2018 HS Contingencies Consolidated Comments (v: 3)   

request access >  login >
Description: CG 2018 HS Contingencies Consolidated Comments
Type: Spreadsheet
Status: DRAFT
Contact: Jonathan Young   contact via email>

 

Spreadsheet

04/04/2008 CG 2018 HW Contingencies Consolidated_Comments (v: 12)   

request access >  login >
Description: CG 2018 HW Contingencies Consolidated Comments
Type: Spreadsheet
Status: DRAFT
Contact: Jonathan Young   contact via email>

 

Spreadsheet

03/04/2008 CG 2018 HS Contingencies-AVA-Sno-Grant-BPA (v: 1)   

request access >  login >
Description: CG 2018 HS Contingencies AVA-Sno-Grant-BPA
Type: Spreadsheet
Status: DRAFT
Contact: Marv Landauer   contact via email>

 

Spreadsheet

02/26/2008 CG 2018 HW Contingencies (v: 10)   

request access >  login >
Description: CG 2018 HW Contingencies with comments
Type: Spreadsheet
Status: DRAFT
Contact: Marv Landauer   contact via email>

 

Spreadsheet

02/26/2008 CG 2018 EHW Contingencies (v: 5)   

request access >  login >
Description: CG 2018 EHW Contingencies with comments
Type: Spreadsheet
Status: DRAFT
Contact: Marv Landauer   contact via email>

 

Spreadsheet

02/13/2008 CG 2018 EHW Contingency Results (v: (4))   

request access >  login >
Description: This spreadsheet contains all violations from N-1 and common mode outages run against the CG 2018 EHW PowerWorld case. Each utility is expected to review these violations and provide comments.
Type: Spreadsheet
Status: DRAFT
Contact: Gordon Comegys   contact via email>

 

Spreadsheet

02/11/2008 CG 2018 HS Contingencies (v: 1)   

request access >  login >
Description: This spreadsheet contains all violations from N-1 and common mode outages run against the CG 2018 HS PowerWorld case. Each utility is expected to review these violations and provide comments.
Type: Spreadsheet
Status: DRAFT
Contact: Marv Landauer   contact via email>

 

Spreadsheet

02/08/2008 CG 2018 HW Contingencies (v: 9)   

request access >  login >
Description: This spreadsheet contains all violations from N-1 and common mode outages run against the CG 2018 HW PowerWorld case. Each utility is expected to review these violations and provide comments.
Type: Spreadsheet
Status: DRAFT
Contact: Gordon Comegys   contact via email>

 

Spreadsheet

01/15/2008 CG 2018 HW Unsolved Contingencies by Area (v: 1)   

request access >  login >
Description: This spreadsheet contains a list of all unsolved contingencies for the CG 2018 HW case. These contingencies are listed on separate tabs for each area.
Type: Spreadsheet
Status: DRAFT
Contact: Gordon Comegys   contact via email>

 

Document (pdf)

05/02/2008 System Assessment Report Needs Statement 2008 (5.02.08) (v: 2)   

request access >  login >
Description: System Assessment Report Needs Statement 2008 - Attachment H
Type: Document (pdf)
Status: DRAFT
Contact: Marv Landauer   contact via email>