FERC Order No. 1000 builds on the reforms of FERC Order No. 890 with the objective of correcting perceived remaining deficiencies with respect to transmission planning processes and cost allocation methods. Accordingly, Order No. 1000 specifies certain requirements in three primary areas: (1) regional planning and cost allocation; (2) non-incumbent transmission developers; and, (3) interregional transmission planning coordination and cost allocation.
The four regions are now focused on the third item in the order; interregional transmission planning coordination and cost allocation. Stakeholder information that has been developed jointly by the four regions associated with those activities is stored in this area of the ColumbiaGrid website.
Fourth Amended and Restated Order 1000 Functional Agreement
Meetings/Documents:
Past Annual Interregional Coordination Meetings:
Regional Contacts:
ColumbiaGrid
Paul Didsayabutra
[email protected]
California ISO
Gary DeShazo
[email protected]
Northern Tier Transmission Group
Sharon Helms
[email protected]
WestConnect
Charlie Reinhold
[email protected]
...osed Schedule_Rev 12.10.18.pdf download>
12/13/2018 Western Planning Regions Annual Interregional Coordination Meeting Notice (2.19.19) (v: Western Planning Regions Annual Interregional Coordination Meeting Notice (2.19.19))
...ation Meeting Notice_FINAL.pdf download>
02/22/2018 Transwest Express ITP Summary (v: Transwest Express ITP Summary Presentation)
...ess_ITP_Summary_Feb22_2018.pdf download>
02/20/2018 ColumbiaGrid Presentation (v: ColumbiaGrid Presentation)
CG_2018_AICM_CG_v6.pdf download>
02/20/2018 CAISO Presentation (v: CAISO Presentation)
... ISO Presentation for AICM.pdf download>
02/20/2018 NTTG Presentation (v: NTTG Presentation)
...r AICM 2018_02.22.18_Final.pdf download>
02/20/2018 WestConnect Presentation (v: WestConnect Presentation)
...ect AICM Slides_02-15-2018.pdf download>
02/02/2022 Final Agenda 2018-FEB-22 (v: 2018-FEB-22_Agenda_Final)
2018-FEB-22_Agenda_Final.pdf download>
02/02/2022 Folsom Hotels Negotiated Rates 2018 (v: Folsom Hotels Negotiated Rates 2018)
...om Hotels Negotiated Rates.pdf download>
01/11/2021 2018 System Assessment Draft Study Plan (v: 2018 SA Draft Study Plan)
2018 SA Draft Study Plan.pdf download>
01/08/2021 2017 Biennial Transmission Expansion Plan (BTEP) (v: 2017 Biennial Transmission Plan (BTEP))
...ransmission Expansion Plan.pdf download>
01/04/2021 Notice: ColumbiaGrid Interregional Transmission Projects (ITP) Submission Window (v: Notice: ColumbiaGrid Interregional Transmission Projects (ITP) Submission Window)
...ts (ITP) Submission Window.pdf download>
01/03/2022 ColumbiaGrid Interregional Transmission Project (ITP) submission formĀ (v: ColumbiaGrid Interregional Transmission Project (ITP) submission formĀ )
Order1000 ITP form_2018_v1.pdf download>
12/20/2017 ITP Project Submittal Information (2018-2019 Regional Planning Cycles) (v: ITP Project Submittal Information (2018-2019 Regional Planning Cycles))
...ttal Matrix_final_12.04.17.pdf download>
08/03/2022 Final 2017 System Assessment Report (v: Final 2017 System Assessment Report)
2017 SA Report_Final1.pdf download>
04/04/2021 WPR Response to February 23, 2022 Stakeholder Comments (v: WPR Response to February 23, 2022 Stakeholder Comments)
...Stakeholder Comments_Final.pdf download>
03/22/2017 Key Points Action Items from Feb. 23 2017 Annual Interregional Coordination Meeting (v: Key Points Action Items from Feb. 23 2017 Annual Interregional Coordination Meeting)
...ion Meeting_03.20.17_Final.pdf download>
02/21/2017 2017 Annual Interregional Coordination Meeting-Presentation (v: 2017 Annual Interregional Coordination Meeting-Presentation)
AICM Final.pdf download>
02/17/2017 2017 Annual Interregional Coordination Meeting Agenda (v: 2017 Annual Interregional Coordination Meeting Agenda)
Feb_23_2017_Agenda.pdf download>
02/01/2022 Western Planning Regions-Annual Interregional Coordination Meeting_Registration (v: 1)
...ation Meeting_Registration.pdf download>
01/27/2017 Annual Inerregional Coordination Meeting-Save the Date (v: Annual Inerregional Coordination Meeting-Save the Date)
...ional Coordination Meeting.pdf download>
01/26/2017 Draft 2017 Biennial Transmission Expansion Plan (v: Draft 2017 System Assessment Study Plan)
...nPlan-Draft forComment 2.0.pdf download>
01/26/2017 Draft 2017 System Assessment Study Plan (v: Draft 2017 System Assessment Study Plan)
...ssment Study Plan_12-13-16.pdf download>
06/24/2016 ColumbiaGrid Inter-regional Coordination Information Package (v: 4)
...age_08052015_post_v4_Final.pdf download>
06/24/2016 02/11/2021 System Assessment Study Plan (v: 2)
...sessmentStudyPlan(2.11.16).pdf download>